Full text

Turn on search term navigation

© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Small-scale hydropower plants (SHP) have been losing competitiveness compared to other renewable sources in the global electricity matrix due to technical, environmental, regulatory, and economic issues. In this context, and to contribute to the development and strengthening of SHP’s integration into the country’s electricity matrix, this study proposes the Balanced Scorecard (BSC) as a strategic evaluation tool for SHP projects from the prospecting phase to the pre-implementation phase, taking into account financial and non-financial performance indicators. This study aims to structure a strategic map of the SHP source composed of economic, socio-environmental, institutional, and technical perspectives, adapted to the four perspectives of the BSC, with the required performance indicators for the strategic evaluation of SHP. The development of a computer program allowed data visualization from eight case studies focusing on indicators or perspectives that jeopardize the project’s strategic viability. The results showed that (i) the adaptation of the BSC methodology for the strategic evaluation of SHP feasibility proved effective and (ii) the developed computer program demonstrated robustness and effectiveness in analyzing SHP, even in different stages of development and with different technical and environmental characteristics. Finally, the strategic evaluation of SHP feasibility is an effective tool in assisting decision makers, indicating the positive aspects and weaknesses of the project under evaluation and providing a better understanding of the asset and the areas of development that deserve greater attention to improve its performance.

Details

Title
Use of Balanced Scorecard (BSC) Performance Indicators for Small-Scale Hydropower Project Attractiveness Analysis
Author
Augusto Cesar Campos de Souza Machado 1 ; Geraldo Lucio Tiago Filho 1   VIAFID ORCID Logo  ; Thiago Modesto de Abreu 2   VIAFID ORCID Logo  ; Facchini, Francesco 3   VIAFID ORCID Logo  ; da Silva, Robson Francisco 4 ; Rodrigues Pinto, Luiz Fernando 4   VIAFID ORCID Logo 

 Institute of Natural Resources (IRN), Itajuba Federal University, Itajuba 37500-903, MG, Brazil; [email protected] (A.C.C.d.S.M.); [email protected] (G.L.T.F.) 
 Institute of Electrical Systems and Energy (ISEE), Itajuba Federal University, Itajuba 37500-903, MG, Brazil; [email protected] 
 Department of Mechanics, Mathematics and Management, Polytechnic University of Bari, 70125 Bari, Italy 
 Industrial Engineering Post-Graduation Program, Nove de Julho University (UNINOVE), São Paulo 01504-001, SP, Brazil; [email protected] (R.F.d.S.); [email protected] (L.F.R.P.) 
First page
6615
Publication year
2023
Publication date
2023
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2869335036
Copyright
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.