© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

In this paper, the initiation of the fracture of a segment caused by the pressure of the jack and other factors during shield construction is discussed. Based on the Rots model in the finite element software Diana 10.4, the fracture width is solved. Combined with in situ measurements, the mechanisms of concrete fracturing of a segment under external loads, such as the jack thrust deflection angle and uneven jack thrust caused by the changes in the segment due to the upward buoyancy and shield attitude, are studied; additionally, the occurrence conditions and engineering control measures for segment fracture are summarized. The results show that when the attitudes of the shield and segment are identical, the total thrust of the shield is recommended not to exceed 21,000 kN, and is strictly limited to 24,000 kN. When the attitude inclination angle between the shield machine and the segment is less than 1°, the impact on the segment quality is small. When the inclination angle reaches 2°, the total thrust of the shield is recommended not to exceed 16,000 kN, and is strictly limited to 18,000 kN. When the inclination reaches 3°, a fracture is easily produced. When the total thrust is 19,000 kN, it is recommended that the loading increase or decrease in the left and right four grippers should not exceed 20%, and they are prohibited to exceed 30%. The fracture width increases exponentially with the increase in misalignment between adjacent segment rings. These research results provide a theoretical basis for jack pressure control during shield construction.

Details

Title
Study on the Fracture of a Shield Segment in a Fully Excavated Hard Rock Section under the Influence of Construction Loads
Author
Zhu, Cheng 1 ; Zheng, Bin 2 ; Ren, Guoping 3 ; Feng, Tugen 3 ; Zhong, Xiaochun 3 ; Huang, Siyuan 3 

 College of Civil and Transportation, Hohai University, No.1 Xikang Road, Nanjing 210024, China[email protected] (S.H.); China Communications Construction Company Limited Rail Transit Division, Beijing 101300, China 
 College of Mechanics and Materials, Hohai University, Nanjing 210024, China; [email protected] 
 College of Civil and Transportation, Hohai University, No.1 Xikang Road, Nanjing 210024, China[email protected] (S.H.) 
First page
4102
Publication year
2024
Publication date
2024
Publisher
MDPI AG
e-ISSN
20763417
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3059275953
Copyright
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.