The hydraulic oscillation of pumped-storage power station (PSPS) affects the safe and stable operation of the power station. The S-shaped characteristic curves of pump-turbine may sometimes result in instability in speed-no-load operation. To investigate the instability mechanisms and identify the main factors that affect stability, this paper used the overall matrix method to establish a self-excited oscillation calculation model of a PSPS and analyzed the stability characteristics and influencing factors of the S-shaped regions of the speed-no-load opening. The results show that when the slope of the characteristic curve is negative, the natural frequency attenuation factors of the system are negative, demonstrating stability. When the slope of the characteristic curve is positive, the system remains stable if the slope is large. However, if the slope of the characteristic curve is below a certain value, which may lead to instability. Increasing the inlet valve resistance and appropriately changing the valve layout position can enhance the stability of the system. The damping surge chamber fluctuations have no impact on system stability. The study also found that the stability regions of the S-shaped regions are related to the slope of the characteristic curve, the unit operating discharge, and the value resistance coefficient.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 State Key Laboratory of Water Resources Engineering and Management, Wuhan Uni versity , Wuhan, Hubei, 430072, P.R. China
2 CSG PCG Engineering Construction and Management Branch Co., Ltd. , Guangzhou, 510630, China