Abstract
The unsteady multi-phase flow simulation in rotating buckets of a model Pelton turbine under various operating heads was performed with the SST-CC turbulence model. The hydraulic performance of the turbine and the flow pattern in the rotating bucket under different operating heads were discussed. The results showed that there was an optimal operating head for the Pelton turbine. The waste of the additional kinetic energy carried by the outflow under off-design heads accounted for the decline in the turbine efficiency. Moreover, the temporal and spatial distribution of the outflowing loss varied with operating head. In the case of high operating head, the outflowing loss last only a short period of time after the water sheet flow started to discharge, and the obvious region of loss was near the bucket root. In the case of low operating head, the outflowing loss occurred during the second half of jet-receiving for the bucket, with the position of high outflowing velocity distributed along the entire brim.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Shanghai Investigation Design & Research Institute Co., Ltd. , Shanghai, 200335, China
2 State Key Laboratory of Hydroscience and Engineering & Department of Energy and Power Engineering, Tsinghua University , Beijing, 100084, China
3 Dongfang Electric Machinery Co. Ltd , Deyang, Sichuan Province, 618000, China
4 China Three Gorges Construction Engineering Corporation . Chengdu, Sichuan Province, 610014, China