It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
This study introduces an innovative optimized bolting support system specifically tailored for gob-side entry excavation in thick coal seams at a coal mine in southwestern Shandong, China. Employing theoretical analysis, numerical simulation, and field measurements, the research focuses on examining the failure characteristics of surrounding rock during gob-side entry excavation. The key innovation lies in the development of a 5-meter optimal coal pillar width, ensuring balanced stress distribution and structural integrity. Additionally, a lag time of at least 46 days between gob-side entry excavation and the upper working face retreat is recommended to mitigate roof subsidence and surrounding rock deformation. The optimized bolting support system, featuring increased bolt pretension, utilization of high-strength steel strips, and reinforcement of weak points, effectively reduces deformation of the roadway surrounding rock, meeting support requirements for normal production. This novel approach successfully addresses the support challenges in thick coal seam gob-side entry excavation, enhancing mining safety and resource recovery rates.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 China Coal Technology and Engineering Group Shenyang Research Institute, Fushun, China (GRID:grid.464213.6); State Key Laboratory of Coal Mine Safety Technology, Fushun, China (GRID:grid.464213.6)