Full Text

Turn on search term navigation

© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Electricity markets with a high share of variable renewable energy require significant balancing reserves to ensure stability by preserving the balance of supply and demand. However, they were originally conceived for dispatchable technologies, which operate with predictable and controllable generation. As a result, adapting market mechanisms to accommodate the characteristics of variable renewables is essential for enhancing grid reliability and efficiency. This work studies the strategic behavior of a wind power producer (WPP) in the Iberian electricity market (MIBEL) and the Portuguese balancing markets (BMs), where wind farms are economically responsible for deviations and do not have support schemes. In addition to exploring current market dynamics, the study proposes new market designs for the balancing markets, with separate procurement of upward and downward secondary balancing capacity, aligning with European Electricity Regulation guidelines. The difference between market designs considers that the wind farm can hourly bid in both (New 1) or only one (New 2) balancing direction. The study considers seven strategies (S1–S7) for the participation of a wind farm in the past (S1), actual (S2 and S3), New 1 (S4) and New 2 (S5–S7) market designs. The results demonstrate that new market designs can increase the wind market value by 2% compared to the optimal scenario and by 31% compared to the operational scenario. Among the tested approaches, New 2 delivers the best operational and economic outcomes. In S7, the wind farm achieves the lowest imbalance and curtailment while maintaining the same remuneration of S4. Additionally, the difference between the optimal and operational remuneration of the WPP under the New 2 design is only 22%, indicating that this design enables the WPP to achieve remuneration levels close to the optimal case.

Details

Title
Strategic Bidding to Increase the Market Value of Variable Renewable Generators in New Electricity Market Designs
Author
Algarvio Hugo 1   VIAFID ORCID Logo  ; Sousa, Vivian 2 

 LNEG–National Laboratory of Energy and Geology, 1649-038 Lisbon, Portugal 
 Department of Geographic Engineering, Geophysics and Energy, Faculty of Sciences, University of Lisbon, Campo Grande, 1749-016 Lisbon, Portugal; [email protected] 
First page
2848
Publication year
2025
Publication date
2025
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3217733716
Copyright
© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.