Abstract

Fulfilling coal-based electricity needs has its own challenges. It is because coal supply chain is a complex network in which various coal specifications could be supplied by more than one supplier. Uncertainty in demand and lead-time also complicates the situation. Moreover, each supplier can offer different price for the coal and different transportation. This paper empirically examined the coal allocation for steam power plants in Indonesia. There are 12 coal suppliers and 25 power plants as the subjects of evaluation. In order to find the set of suppliers and its allocations, optimization model that minimizing the purchasing and transportation cost was developed. The output from the optimization was then used as an input to find the level of safety stock, order quantity, and reorder point in each plant that can prevent the occurrence of stock out. A sensitivity analysis was also carried out to understand the impact of variation in demand and lead-time. The results show that lead time variations needs to be considered more in determining safety stock level rather than demand variations, including when having multi-suppliers.

Details

Title
Analysis of coal allocation on steam power plants and the effect of multi-suppliers, demand and time variations on coal’s safety stock
Author
Jason, A 1 ; Asih, A M S 1 ; Yuniarto, H A 1 

 Industrial Engineering Study Programme, Department of Mechanical and Industrial Engineering, Universitas Gadjah Mada, Indonesia 
Publication year
2019
Publication date
Dec 2019
Publisher
IOP Publishing
ISSN
17578981
e-ISSN
1757899X
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2561436190
Copyright
© 2019. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.