It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Fulfilling coal-based electricity needs has its own challenges. It is because coal supply chain is a complex network in which various coal specifications could be supplied by more than one supplier. Uncertainty in demand and lead-time also complicates the situation. Moreover, each supplier can offer different price for the coal and different transportation. This paper empirically examined the coal allocation for steam power plants in Indonesia. There are 12 coal suppliers and 25 power plants as the subjects of evaluation. In order to find the set of suppliers and its allocations, optimization model that minimizing the purchasing and transportation cost was developed. The output from the optimization was then used as an input to find the level of safety stock, order quantity, and reorder point in each plant that can prevent the occurrence of stock out. A sensitivity analysis was also carried out to understand the impact of variation in demand and lead-time. The results show that lead time variations needs to be considered more in determining safety stock level rather than demand variations, including when having multi-suppliers.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Industrial Engineering Study Programme, Department of Mechanical and Industrial Engineering, Universitas Gadjah Mada, Indonesia





