Full Text

Turn on search term navigation

Copyright Faculty of Engineering Hunedoara 2012

Abstract

Ready-mixed concrete is used in the civil engineering and construction business, for example: bridge, free way, dam and buildings. In RMC plant, concrete is produced at plant and it is delivered to site. Initial setting time of concrete is 30 minutes. To prolong the setting time, plasticizers are used in RMC. Pumpability and Flowability are the major issues in RMC; hence slump is the major criteria with the strength. A transit mixer takes approximately 45min to 180 minutes to deliver concrete and return to the site depending on the distance of site from the plant and other conditions. Some concrete particles/ slurry stick to the blades of transit mixer, walls and floor of the transit mixer which is normally termed as sludge in technical terms. The scope is the analysis of data of daily production of ready mix concrete, sludge formed during the transportation of ready mix concrete form plant to site and back to the site, quantity of water used to wash the Production of Concrete and Sludge Formation in the month of August. Daily production of concrete was recorded for the Plant for one month. The Concrete produced was of different grade but for simplicity we have considered the total production per day ignoring the grade of concrete. Date wise production of sludge was also recorded for three months. [PUBLICATION ABSTRACT]

Details

Title
ANALYSIS OF SLUDGE FORMED IN R.M.C PLANT
Author
Biswas, Arjita; Adavi, P R
Pages
193-196
Publication year
2012
Publication date
2012
Publisher
Faculty of Engineering Hunedoara
ISSN
15842665
e-ISSN
26012332
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
1077751653
Copyright
Copyright Faculty of Engineering Hunedoara 2012