Full text

Turn on search term navigation

© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

The wide and in-depth adoption of advanced information technologies within the construction industry has led to its revolution of all aspects; the construction site is not an exception. Recently, the notion of a smart construction site (SCS) has drawn the attention of all stakeholders within the industry. While the practice of SCS could be witnessed in various regions and the notion is mentioned frequently, the concept of SCS is still emerging, a sound framework for SCS development is still absent. As a bottom-up phenomenon, a systematic analysis of critical factors would provide all stakeholders with a comprehensive view of SCS development. In this research, previous research and existing practices of SCS are referred to, which helps to identify 17 critical factors for SCS development from the perspective of management, technology, and organization. The DEMATEL-ISM approach is introduced to conduct the factor analysis, and a questionnaire survey is conducted among 10 experts to investigate their attitudes on these factors. Following the proposed method, the 17 factors are classified into seven hierarchies and further categorized into three layers, i.e., effect layer, operational layer, and input layer, which helps to demonstrate the interrelationship among the critical factors for SCS development. The effect layer consists of the first to the third hierarchy, which contains the factors of cost (F2), safety (F4), schedule (F5), environment (F9), and quality (F3) management; these factors belong to the management perspective and reflect the expectations during SCS development. The operational layer consists of the fourth to the sixth hierarchy, which contains seven factors, namely, processing (F8), information (F10), communication and coordination (F15), personnel (F5), material (F6), equipment (F7), and management regulation (F17); these factors are critical in processing the input resources into the final effect of SCS development. The input layer only consists of the seventh hierarchy, which contains hardware and software facility (F11), integrated platform (F12), data sharing center (F13), smart decision system (F14), and technical team (F16); these factors represent the investment of SCS development. The systematic analysis of critical factors provides new insights on SCS development, which could be adopted as references for future SCS development by all stakeholders like government and construction enterprises.

Details

Title
Analyzing Critical Factors for the Smart Construction Site Development: A DEMATEL-ISM Based Approach
Author
Xiahou, Xiaer 1 ; Wu, Yifan 1 ; Duan, Tianle 1 ; Lin, Peng 1 ; Li, Funing 1 ; Qu, Xiaojun 2 ; Liu, Long 2 ; Li, Qiming 1 ; Liu, Jiaxin 1 

 Department of Construction Management and Real Estate, School of Civil Engineering, Southeast University, Nanjing 211189, China; [email protected] (X.X.); [email protected] (Y.W.); [email protected] (T.D.); [email protected] (P.L.); [email protected] (F.L.); [email protected] (J.L.) 
 The Second Engineering CO., Ltd. of CTCE Group, Suzhou 215131, China; [email protected] (X.Q.); [email protected] (L.L.) 
First page
116
Publication year
2022
Publication date
2022
Publisher
MDPI AG
e-ISSN
20755309
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2632278980
Copyright
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.