Abstract
The growing demand of housing has prompted the Malaysian construction practitioners to realize the benefits of Industrialised Building System (IBS). Despite its advantages, IBS in Malaysia is plagued partly due to inefficient adoption strategy and lack of awareness among the practitioners. Hence Building Information Modelling (BIM) is introduced to facilitate the life-cycle of the project by eliminating construction inefficiencies. The aim of the study is to evaluate the BIM functions in relation to Malaysian IBS work process. In order to achieve the aim, the effectiveness of IBS and BIM implementation in Malaysia were identified. The data is collected through interview sessions with seven (7) IBS-BIM practitioners. Data from the interview were analysed using Content Analysis, summative approach. From the analysis, it was found that there were 4 BIM functions (clash detection, visualization, shop drawing, coordination) are able to integrate in 3 IBS wrork process (initial work, component production and installation). The causal relationship of IBS-BIM was formulated through linear equation method tabulated from content analysis results. The causal relationship of IBS-BIM explained BIM integrated functions in relation to IBS work flow. This study is essential to assist IBS practitioners to strategies their strategies in enhancing its productivity through the BIM implementation.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 School of BuiltEnvironment, University of Reading Malaysia, IskandarPuteri Johor, Malaysia
2 Department of Structure and Materials, Faculty of Civil Engineering, UniversityTeknologi Malaysia, Skudai, Johor, Malaysia
3 Centre of Building, Construction and Tropical Architecture, Faculty of Built Environment, University of Malaya, Kuala Lumpur, Malaysia