1. Introduction
Reinforced concrete (RC) structures, such as buildings and infrastructure, use enormous amounts of concrete and rebar during the construction phase. In 2012, global concrete and concrete constituent consumption reached about 10 billion m3 [1], and the amount is rapidly increasing every year due to increased demand for RC structures along with global economic development. Rebar, the core resource of RC structures, generates more CO2 per unit weight than any other construction resource. For example, C25/30 concrete generates embodied CO2 (ECO2) of 95 kg-ECO2/t, but reinforcement bar (rebar) generates ECO2 of 872 kg-ECO2/t, which is equivalent to about 9.2 times of the concrete [2]. Therefore, reducing the cutting waste of rebars greatly contributes to the reduction of GHG [3]. Over the past few decades, numerous studies have been conducted on minimizing cutting wastes, and various optimization algorithms have been proposed. However, in reality, cutting wastes are still generated in the process of cutting and bending of rebars, which are at least 3% to 5% [3,4,5,6,7], and as much as 5% [4,6,7,8,9,10,11] to 8% [12], compared to the volume shown in the structural drawings.
Estimating how much rebar cutting wastes contribute to global GHG is a very difficult task, but to confirm the need for sustainable structural work, the authors follow a three-step estimation process after surveying literature and actual data: (1) analyzing the concrete and rebar ratio after surveying actual project data for concrete and rebar in Korea; (2) estimating the global annual use of concrete and rebar, and CO2 emissions by rebar using global concrete consumption in 2012, world GDP growth rate [13], and analyzed concrete and rebar ratio; and (3) estimating the global annual rebar cutting wastes and the resulting CO2 emissions, applying the relatively conservative waste rates of 3 to 5% rates identified in the literature mentioned above.
Although the construction environment varies from country to country, in case of high-rise residential buildings in Korea, the analysis of 30 projects, as shown in Table 1, showed that the rebar quantity compared to concrete was found to be about 0.070 ton/m3, and commercial buildings have long-span heavily loaded attributes compared to residential buildings. The analysis of 12 projects showed a result of about 0.119 ton/m3. The average of these amounts is calculated at about 0.077 ton/m3. If this average value is applied to 10.058 billion m3 [1], as of 2012 as shown in Table 2, about 778.9 million ton of rebar usage is calculated. Applying the world GDP growth rate as shown in Table 2, rebar usage increases every year, which is estimated to be about 947 million tons in 2019.
For reference, it is impossible to investigate all RC structures around the world to estimate global rebar usage by year. Therefore, despite some errors, it is meaningful to have applied some data of high-rise residential and commercial buildings in Korea. Later, when the data of investigation into various RC structures are added, the range of error will gradually decrease. The application of the world GDP growth in 2012 was also estimated in the same context, as shown in Table 2, because data on global concrete and concrete constituent consumption by year could not be obtained.
Using an estimated global annual use of rebar, if about 0.3416 ton∙CO2/ton [14], which is the unit value of rebar CO2 in Korea, is applied, the generation of about 323.5 million tons of CO2 in 2019 is estimated, starting with 266.1 million ton∙CO2 in 2012. For reference, the unit value of CO2 is different according to industrial structure by country, so it is not possible to obtain a unified value. Therefore, in this study, the calculation was performed based on data analyzed in Korea.
If a rebar cutting waste rate of about 3 to 5% is applied based on this value, about 23.368 to 38.947 million tons of wastes are generated as of 2012, as shown in Table 3, and the amount keeps increasing every year to reach about 28.411 to 47.352 million tons in 2019. When calculating the corresponding CO2 emission, the amount increases annually from about 7.982 to 13.304 million ton∙CO2 in 2012 to reach about 9.705 to 16.176 million ton∙CO2 in 2019, as shown in Table 3. If the near-zero cutting waste of rebars is realized, the effect of CO2 emission reduction of up to 16.176 million tons can be achieved, and the corresponding GHG is reduced. For reference, since the rebars placed into structures vary in length, diameter, and number, it is impossible to combine them without cutting wastes, called zero cutting wastes, by the length of rebars supplied by the steel mill. However, by combining rebars with special lengths supplied by the steel mill, cutting wastes can be reduced to close to zero, which is called near-zero cutting wastes.
As shown in Table 2, demand for buildings and infrastructure increases in line with global economy growth and corresponding demand for RC structures increases every year. The increase in RC structures leads to demand chains that increase demand for concrete and rebars, as shown in Table 2, resulting in an annual increase in rebars cutting waste and CO2 emissions such as Table 3. In particular, it is expected in the future to be more concentrated in developing countries where the population is concentrated [15,16]. The increase in global cutting waste of rebars not only causes unnecessary cost losses but also problems of generating large amounts of CO2 in the production, transportation, and processing phases. Therefore, research to realize near-zero cutting waste is critical to implement sustainable rebar work.
So far, many studies have been conducted to optimize the use of rebars or to reduce the cutting waste. However, the near-zero cutting waste has not yet been realized. However, the near-zero cutting waste has not yet been implemented. The study on cutting stock problem (CSP), which is considered to be the beginning of cutting waste minimization (CWM), was first mentioned by Kantorovich in 1939 and was first published in Management Science in 1960 [17]. Therefore, CSP-related literature has been searched for since 1960 in this study. The literature on the optimization of rebar cutting waste was basically targeted from 1990 to 2020, because the CSP-related research in rebar work started in earnest from 1991. In this paper, we performed a search and review of studies related to optimization or cutting waste minimization of rebars that have been conducted so far and identified the status and problems of existing studies. We then proposed the direction of future research to implement near-zero cutting waste and identify its potential.
2. Data Sources and Methodology
2.1. Data Sources
There are literature databases of various fields around the world, but for the search of articles related to minimal cutting waste of rebars, Scopus, Science Direct, Web of Sciences (WoS), Taylor and Francis Online, Springer Link, American Society of Civil Engineers (ASCE) Library, and Willey Online Library were used. Some dissertations or literature published in internationally uncertified journals were searched for using Google or Google Scholar databases.
2.2. Systematic Literature Review
SLR is an exact and reproducible method for identification, evaluation, and interpretation of predefined fields of study [18]. Kitchenham and Charters defined “a systematic literature review is a means of identifying, evaluating, and interpreting all available research relevant to a particular research question, topic area, or phenomenon of interest. Individual studies contributing to a systematic review are called primary studies; a systematic review is a form of secondary study” [19]. Since similar SLR methodologies have been proposed by several scholars [20,21], MDPI publisher based in Basel, Switzerland recommends that the authors follow Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) [22], checklist, and flow diagram for reporting systematic reviews and meta-analyses.
In construction field, numerous literature review articles have been published, not based on SRL [23,24,25,26,27,28], before 2010. The reason for this is that the perception of SLR in the construction field was not high. Since 2010, with the exception of some articles [29,30,31,32,33,34], most review articles have been written based on SLR [18,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49]. After 2018, many review articles have been written according to PRISMA [18,46,47,48,49], and this study also follows the PRISMA statement for systematic reviews and meta-analysis.
2.3. Methodology
The previously mentioned literature database was sequentially searched using Boolean operator “AND” by keywords, such as rebar, rebar work, rebar optimization, and rebar cutting waste. As a result, Google Scholar found about 79,100 search results for literature related to rebar work, about 16,000 cases of rebar optimization, about 14,000 cases of rebar cutting waste, and about 4410 cases of rebar cutting waste optimization, as shown in Table 4. Google Scholar has confirmed that it includes various reports such as books, content, and dissertations along with academic papers in most databases, as shown in Table 4. In addition to construction, literature of almost all fields, such as medicine and chemistry, is searched by keywords. Additionally, it is confirmed that the search works even if there is a rebar or work in the name. Therefore, searching and reviewing all relevant literature in Google Scholar is an inefficient approach. Since the minimum cutting waste of rebars to be dealt with in this review article is a very specific topic, most of literature is searched in databases such as ScienceDirect, WoS, and ASCE Library. However, Google Scholar was used to search for books, magazines, and documents such as dissertations, which are not well searched for in databases such as WoS and ASCE, and when original text could be downloaded from these databases.
As shown in Table 4, a search for literature was performed on Google Scholar, ScienceDirect, Springer Link, and ASCE Library. It has been confirmed through the literature search process that the number of literatures searched for varies depending on the characteristics of each database. For example, topics such as rebar cutting waste correspond to construction engineering; therefore, literature is frequently searched for in databases of engineering fields. In particular, the ASCE Library is a database dedicated to the construction field; hence, many literatures related to this review paper have been searched for. When searching the literature with a keyword of rebar work, which includes all rebar-related work, many articles are retrieved as shown in Table 4. However, many literatures include corrosion of rebar, rebar tying tool, rebar cutting and bending machine, and rebar work schedule, and are not related to CWM. When search range is narrowed to rebar optimization and rebar cutting waste, the number of records is reduced dramatically. For reference, rebar optimization is the general word of rebar minimization, and rebar cutting waste literally means the waste remaining after cutting the rebar. Finally, in most databases, searching with rebar cutting waste optimization that has the same definition as CWM results in fewer records. In the case of Scopus and WoS, it is reduced to 9 and 6 records, respectively, but all records are valid. In other databases, many records are identified as RC design optimization.
Based on literature searched for on 1 December 2020, 1811 records were finally identified, as shown in Figure 1, excluding duplicated literature or literature not related to the subject of this study. Among them, duplicated 384 records were screened and 638 and 386 records that were not relevant to the rebar cutting work and rebar cutting optimization were excluded, respectively, to finally select 403 full-text articles. Then, 351 literatures related to design optimization of the RC components or frames were excluded. The reason is that design optimization of RC corresponds to pre-processing research of rebars optimization, while CWM of rebars covered in this study corresponds to post-processing research. As a result of reviewing some of the literature [50,51,52,53,54,55,56,57,58,59,60,61,62,63,64,65,66,67,68,69,70,71,72,73,74,75,76,77,78,79,80,81] related to design optimizations of rebars, it was confirmed that they are related to design optimization of RC components such as slab [50,51,52,53,54,55,56,57], beam [58,59,60,61], column [62,63,64,65], foundation [64], and wall [66,67,68], and design optimization of RC frames such as bridges [69,70,71] and building [72]. In addition, many studies related to design optimization have been well-organized in the review article [37].
2.4. Descriptive Analysis
Studies in the field of construction project management vary widely, including time, cost, quality, and safety. In the Project Management Body of Knowledge, there are 13 knowledge areas [82], and there is countless management research connected with engineering technology, and post-processing research such as minimum cutting wastes of rebars is a very narrow and special topic. Therefore, it is confirmed that there are not many articles directly dealing with this topic. As shown in Table 5, 37 articles were published in the journal [3,4,6,8,9,10,11,12,63,83,84,85,86,87,88,89,90,91,92,93,94,95,96,97,98,99,100,101,102,103,104,105,106,107,108,109,110] and 11 articles were published in peer reviewed conference publication [7,55,62,71,111,112,113,114,115,116,117]. The rest have three dissertations [5,118,119] and one book chapter [120].
When examining papers published in internationally certified SCI or SCIE journals, as shown in Table 6, the biggest number of papers, seven, were published in Journal of Construction Engineering and Management (JCEM) [6,84,87,95,97,101,102]. As of 2019, Journal Impact Factor (JIF) of JCEM is not as high as 2.347, but it is one of the most popular ASCE journals. In addition, two papers were published in Automation in Construction [63,94,105], and Journal of Computing in Civil Engineering [86,103], and one was published each in the remaining journals. It is notable that each paper was also published in high JIF journals, such as the International Journal of Engineering Science [85], Computer-Aided Civil and Infrastructure Engineering [110], and the Journal of Advanced Research [100]. It is assumed as such because the problem of minimizing the rebar cutting waste is important and difficult. Construction Management and Economics is not an SCI journal classified by JCR but was included in the list because it is internationally popular [99].
Table 7 shows 37 articles that are classified by countries based on lead authors. According to Table 7, Korea has the largest number of publications, which is 16 articles, followed by Canada with 5, Israel with 4, and Turkey with 3; 5 countries, including Bangladesh, published 2 papers each. Eight countries, including Albania, published 1 paper each. In Korea, the number of rebars per unit area of RC structure has more than doubled due to the strengthening of seismic design standards in 1988 [121], the strengthening of noise standards between floors in 2000 [122], and the rapid increase in the number of high-rise buildings over 20 stories. Therefore, by continuously conducting studies on rebars design optimization and CWM of RC structures since 1999, the reduction in the use amount of rebar was confirmed.
Figure 2 shows the number of articles published by year. One or two articles were published every year until 2004, but after 2012, the number of articles increased until 2016 with the development of various techniques, including computer-aided design (CAD) and building information models (BIM). It is confirmed that the number of articles dropped sharply to one in 2017 and increased again. In the past, cutting wastes were approached from an economic perspective; however, recently, research has been conducted from a sustainable construction perspective.
3. Review Results and Discussion
3.1. Selection of the Papers
As shown in Figure 1, the number of literatures corresponding to rebar cutting optimization through the identification, screening, and eligibility process was a total of 403, and 52 literatures related to RC design optimization were selected, excluding 351 literatures that fall under the category of pre-processing research of rebar optimization. They address the problems of rebars cutting waste, corresponding to post-processing research of rebars optimization after RC design. These literatures will be reviewed by factors such as application of optimization techniques and graphic solutions for CWM, range of rebar work process, consideration of lap space position, reflection of length in a special order, consideration of bending margin, and consideration of schedule. The review of selected literature will not only measure characteristics and trends of the research for CWM of rebars but also present a direction of future research. In addition to the selected literature, there is rebar modeling [123], using BIM solutions for optimized rebar work, and software that creates rebar details using the information generated after the structural design [124]. However, these were excluded in this paper as they are articles written for the promotion of commercial software and are not described mainly on CWM.
3.2. Identification of Cutting Waste Minimization-Related Factors
One-dimensional CSP has been studied not only in rebars but also in all areas of cutting linear stock material such as pipe and timber. Since the publication of Kantorovich’s article [17], many articles have been published in various fields related to CSP [8,125,126,127,128,129,130,131,132,133,134,135,136,137,138,139,140,141,142,143,144,145,146,147,148]. In the case of rebar, research has been vigorously conducted after 1991 with the development of computer science, since it was first introduced as an example of CSP by Kantorovich [3]. This is mainly because the need for CSP in the construction field to build a single building on site was not highlighted much, unlike general manufacturing, which mass-produces large quantities of the same or similar products in factories. Moreover, it was not easy to develop algorithms to deal with varying variables, such as length, diameter, number of required, and point of use of rebar, which are subject to CSP, and algorithms to consider variables, such as bending margin, various market length, and special length.
In this study, factors that influence the analysis of attributes of the literature should be identified for quantitative and quantitative analysis of the final selected literature. The following is a summary of the variables identified during screening and eligibility assessment of full-text articles related to rebar optimization along with the authors’ research experience.
-
Applied optimization techniques: integer programming (IP), linear programming (LP), genetic algorithm (GA), simulated annealing (SA), binary search algorithm (BSA), heuristic algorithm (HA), and harmony search (HS) algorithm.
-
Rebar work process: preparation of a drawing, quantity take-off, rebar production such as cutting and bending, and in-site rebar placement.
In addition, literature can be reviewed by lap splice position (LSP), use of special length (SpL) or stock length (StL) rebars, and schedule.
3.3. Results of Quantitative and Qualitative Review
3.3.1. Description by Optimization Techniques
Table 8 summarizes the optimization techniques adopted by the literature selected for rebar’s CWM. Afzal et al. [37] introduces the definitions, advantages, disadvantages, and application cases of various algorithms in the study of RC structural design optimization. However, the problem of rebar cutting waste is relatively limited in the scope of study compared to RC design, so the literature is summarized by seven optimization techniques, as shown in Table 8. The advantages and disadvantages associated with rebar CWM are described by optimization techniques, and the classification of literature that adopted these techniques is presented in Table 8.
In the case of LP, it has an advantage in terms of flexibility to be paired up with other approximations to improve convergence, but there is a disadvantage in terms of being slower in finding special-length-priority or waste-rate-priority solutions under multiple search conditions. In studies of rebar’s CWM, 12 articles were selected as optimization techniques [3,4,5,7,9,12,63,86,93,96,109,114]. The reason for this is that CSP or CWM problems have been adopted most often in modeling and have become more common.
Integral programming (IP) has the advantage of quickly generating solutions under limited search conditions, while many search conditions or requiring a float number solution are challenging. In rebar’s CWM study, the second largest number of research articles is adopted in eight research articles [7,12,63,100,101,104,105,106], despite the fact that it takes considerable time to formulate the problem [101]. IP is one of the long-standing optimization techniques used as one-dimensional cutting stock problems like LP and is said to be the most common in modeling CWM problems.
GA has advantages such as simplicity in programming, proof in finding the global optimum, applicability to diverse problem domains, computational performance, and diversity of solutions, but it also has disadvantages such as being time consuming for formulating a CSP problem under complex combination conditions. As a result of reviewing the literature, seven articles have started to adopt GA since 2004 [8,11,71,83,101,113,118], and most of them have adopted LPs and IPs before. Salem, Shahin, and Khalifa [101] conducted a study comparing CWM using GA and IP models and then verified that GA further reduces the cutting waste of the rebar through a case study. Computational time of GA models is practical for everyday use and, in some cases, the GA model was able to lump the wastes in bigger lengths, thus achieving more savings.
Binary search algorithm (BSA) has an advantage in terms of providing quick-iterated local search for rebars of a specific length to be used in combination but has a disadvantage of long CPU run-time for global search as the increase of rebar combination conditions. BSA has the advantage of quickly performing iterated local search, so the CWM problem should be divided according to the supply schedule of rebars. In this case, there is a problem that the CWM effect is not greater than global search. BSA has been confirmed to have been adopted by two articles, as shown in Table 8 [10,116].
SA has advantages such as use for combinatorial optimization problems in a discrete search space and simplicity in implementation, while it has disadvantages of large computing time and cost if not providing boundary conditions. Porwal and Hewage asked “which conditions are more suitable?” when LP, IP, GA, BSA, sequential heuristic procedure, and SA are applied to a combination of rebar cutting patterns [6], and Porwal and Hewage proposed integration with BIM and combination with special-ordered length, available market lengths, and SpL of rebars by SA. In addition, the case study suggested that SA models are successful in complex combinatorial optimization programs through controlled randomization.
Heuristic algorithms are algorithms that solve problems in a more efficient way than conventional methods at the expense of optimality, completeness, and accuracy to obtain rapid solutions. Heuristic algorithms are expensive for accurate calculations and are frequently used if approximate solutions are sufficient. Bekdas and Nigdeli [62] optimized RC columns using a metaheuristic algorithm, called a bat algorithm.
HS is a metaheuristic search algorithm that tries to mimic the improvisation process of musicians in finding a pleasing harmony [149,150]. Although HS algorithm has better global optimization capability, its disadvantages are randomness and instability. Nonetheless, search direction of the algorithm is uncertain [150], and HS requires higher number of iterations [37]. HS was applied to optimize costs of materials, including concrete and rebars, by implementing design variables such as width and height of RC column, including diameters and number of reinforcements, and loading condition variables are implemented as harmony vectors [117].
HA is divided into local search-based metaheuristic algorithms, such as SA, and global search-based metaheuristic algorithms, such as GA and HS, to find better solutions. Therefore, HA or SA is more efficient if the target of rebar CWM is a local-search-based problem, and GA or HS is more effective if the target is a global-search-based problem.
Reference numbers written in Table 8 indicate that the corresponding optimization techniques are used in combination, for example, references [7,12,63], used a combination of IP and LP, and reference [101], performed rebar CWM using IP and GA.
3.3.2. Description by Rebar Work Process
Rebar work process consists of structural design, drawing work, quantity take-off (QTO), rebar production, and rebar placement. The literature related to structural design optimization of the RC component or frame has been sufficiently reviewed in other articles, and this paper reviews the literature that performed post-processing CWM from drawing creation to rebar placement. Table 9 shows literature review by rebar work process. Strategies to reduce rebar cutting waste are effective only when implemented from the drawing work stage. Accordingly, the top 20 literature, as shown in Table 9 references, suggested reducing cutting wastes in conjunction with drawings, and some literature included a mathematical algorithm that automatically writes rebar drawings using CWM algorithm [6,84,91,105,108,111].
Unlike ordinary materials, quite many variables should be considered in the case of the exact QTO work of rebars. It is a complex task that should reflect the size of stock material, concrete cover, and lap splice length, as well as variables not shown in the drawing, such as bending margin. Thus, studies have been conducted to develop algorithms to automate QTO in several studies [3,6,90,91,107,108,115], where variables such as the length and number of rebars applied could be directly utilized for rebar CWM algorithm. Thus, the second largest number of articles, as shown in Table 8, for reducing rebar cutting waste at the QTO stage is 16.
CWM algorithm has been widely applied to rebar production stages, including cutting and bending [6,8,87,88,91,92,94,95,96,99,107,111,112,116]. This is because the bar-bending schedule is prepared first before supplying rebars to the site, the cutting list is prepared, and the bar combination is performed by cutting patterns using the list. Several studies have indicated that the cutting wastes of rebars start from the purchase order stage [6,90,91,104]. This is because ordering by market length without analysis of optimal cutting patterns is a major factor in increasing cutting waste.
As for the study on reducing cutting waste in rebar replacement, 12 articles were published, as shown in Table 9 references. In the rebar placement stage, studies are divided into two—one is to prevent loss or waste caused by a mismatch in field installation after cutting, bending, and fabrication of rebars [84,89,97,105,112,118], and the other is to perform a detailing design and installation planning as an optimization method considering the productivity of the rebar placement [2,10].
The reference numbers written multiple times in Table 9 indicate that the corresponding article was performed on several stages of rebar works. For example, references [98] and [103] were performed for drawing work, QTO, and rebars placement stages, and references [84,89,97,105,110,120] were performed for drawing work and rebars placement stages.
3.3.3. Description by Other Factors
Because the location, size, and structural performance of RC components such as column, beam, foundation, slab, and wall are different, the length of the rebar generated after structural design is very diverse. Since rebar has the characteristic of being repeatedly installed, if the rebar is determined to have a certain length after structural design, the cutting patterns appear simple and the effect of CWM is also significant. LSP should be partially adjusted to satisfy the structural design codes to arrange the length of rebar in RC components constant. Several studies, as shown in Table 10, have revealed that the effect of CWM is significant when LSP was adjusted [6,7,12,86,105,108,112,119].
As shown in Table 10, 10 rebar CWM-related articles are described for rebars of stock length (StL) or market length. This is because the CSP study on the optimization of the material of one-dimensional stock length stored in the factory is the beginning of rebar CWM. In particular, in the case of factory production, materials sold at a fixed length in the market are stored, and the combination of cutting pattern optimization is performed for mass production. However, in the case of a construction project, various lengths and number of rebars must be combined, so it is difficult to reduce cutting wastes using stock length. Therefore, rebar combination is needed by SpL [3,4,6,10,90].
The use of SpL can further reduce cutting wastes, in contrast to the use of StL [3,6,10]. However, the minimum quantity and pre-order time must be satisfied to order rebars with SpL. The length of rebars should be adjusted so that it is combined with SpL. Eventually, additional algorithms should be developed to adjust LSPs easily and quickly. The references in Table 10 are written several times, because the corresponding articles considered multiple factors for CWM. For example, Porwal and Hewage [6] incorporated StL and SpL as well as LSP into the study for CWM.
3.4. Discussion
If near-zero cutting waste of rebar, one of the most ECO2 generating resources in construction materials, is realized, environment-friendly sustainable construction is implemented and the waste of high-cost resources is prevented. The results of SLR analysis on studies that attempted to reduce rebar cutting wastes showed that there were relatively many design optimizations of RC literature corresponding to pre-processing research, while the rebar CWM-related literature corresponding to post-processing research was 52 articles. The results of systematic critical review on CWM of rebar are summarized as follows:
Applied optimization techniques: LP, IP, and GA were the most frequently adopted 27 articles, 84.4% of the total, and the remaining BSA, SA, HA, and HS were selected in 5 articles. Initially, optimization algorithms were adopted based on LP and IP, but recently, the adoption of HS and GA has been confirmed to increase. This is because HS and GA, which are operated based on expertise, can perform the task of realigning reinforcing bars with special lengths more easily and faster than mathematical algorithms. HS and GA can realign rebars that are repeatedly installed with special lengths more efficiently than IP, LP, and BSA, while satisfying structural requirements.
Rebar work process: CWM studies have been conducted in many literatures linking four stages of work processes such as drawing work, QTO, rebar production, and rebar placement. The reason is that rebar CWM is linked to all four stages from drawing work to rebar placement. In addition, since the importance of information is determined according to the order of the rebar work process, it was confirmed that 20 papers, 16 papers, 14 papers, and 12 papers were associated with each work stage. In consideration of the characteristics that the initial information affects the information generated later, it was confirmed that performing CWM in the drawing work stage is most effective. If CWM is performed in the drawing work stage, the results are sequentially reflected in the QTO, rebar production, and rebar placement stages to minimize cutting wastes.
Other factors: partially adjusted LSPs, while satisfying structural design codes, expect the related research to increase [12], due to the large effectiveness of CWM. Although there have been many CWM studies on StL so far, it has been confirmed that the research focusing on SpL will be expanded in the future.
In general, rebars are sold as linear rods in the market. Therefore, most studies on minimum cutting waste have focused on algorithms to solve one-dimensional cutting stock problems because contractors purchase, cut, and bend them. With the development of software and hardware solutions for engineering programs, techniques such as GA, BIM, AR, VR, and integrated project delivery have been added. It is assumed that there is a fundamental problem that the cutting waste rate is not yet reduced to near-zero despite those studies.
In this study, we have confirmed that cutting wastes can be significantly reduced in the following two cases. First, the use of coiled rebars can reduce cutting wastes to near-zero. The coiled rebar, which has been used since the 1990s, automatically performs rebar cutting and bending by machine. Initially, coiled rebars with a diameter of 10 mm to 16 mm were processed, but recently, coiled rebars with a diameter of 50 mm are automatically cut and bent by machine [151]. Global near-zero cutting waste can be achieved if machines are available that automatically perform straightening, cutting, and bending after coiled rebars are produced and supplied in all countries. However, not many countries have an industrial structure that satisfies such a supply chain. Except for some countries in Europe and North America, most countries do not yet supply coiled rebars. Therefore, CWM research should be continued until the rebar supply chain is globally established.
Second, if mechanical rebar couplers are used, steel quantities are reduced compared to lap spaces and ECO2 is also reduced proportionally. This study summarizes the comparisons between lap splices and mechanical couplers, as shown in Table 11. Lapping length and weight are different from high-tensile deformed bars 10 mm (D10) to 32 mm (D32) in diameter. The weight of couplers of each diameter is different, but the overall effect of reducing ECO2 is significant when couplers are used. In the small case of D10, a weight of 0.166 kg/EA and an ECO2 difference of 0.145 kg-ECO2/EA are generated. In the large case of D32, a weight of 14.237 kg/EA and an ECO2 difference of 12.415 kg-ECO2/EA are generated, respectively. In particular, with mechanical rebar couplers, ECO2 reduction effect can be achieved from at least 84.7% to up to 96.4% compared to splice lap.
However, when comparing the cost of rebar splice and mechanical couplers, couplers cost is higher up to D25, as shown in Table 12, but couplers are cheaper in rebars of above D29. For reference, splice cost is calculated by multiplying rebar cost per ton and splice weight, and rebar cost includes material, shop drawing work, cutting and bending, and installation cost. RC structures use various diameters of rebars. As shown in Table 11, mechanical couplers for all sizes of rebar are more advantageous for ECO2 reduction than splice laps. However, as shown in Table 12, the cost of rebar couplers from D10 to D25 is more expensive than lap splice. However, the analysis results in Table 11 and Table 12 may be different in each country because the types of mechanical couplers are diverse in shape and the rebar work cost is different. In Korea, the use of a mechanical coupler for rebars with D25 mm or larger in diameter has little cost reduction effect, but it has been confirmed that the ECO2 reduction effect is remarkable. In the U.S., despite the fact that mechanical butt splices provide a variety of benefits, it is realized that the cost is still higher than lap splices [152]. If carbon tax is applied, the cost benefit is generated as much as the ECO2 reduction in Table 11, and related research should be added.
4. Conclusions
During this review research, several facts have been identified in addition to findings identified from meta-analysis, as described in the Section 3. Various CWM algorithms have been developed and have contributed to reducing cutting wastes. However, it was confirmed that many algorithms have two principal problems to be applied in the field. First, although some algorithms can theoretically implement CWM, it is difficult to apply in practice when various site conditions are reflected. Second, some algorithms can reduce cutting wastes of some or major RC components, such as columns, beams, and slabs, but cannot reduce the cutting wastes of the entire structure of a project to near-zero. A description of identified findings after literature review is as follows:
Although cutting wastes can be reduced using SpLs of rebars rather than market lengths, many studies conducted optimization on market lengths to minimize cutting wastes of some rebars, but near-zero cutting waste of the entire construction project was difficult to realize. This phenomenon has been clearly identified on rebars with a diameter of above D19.
To achieve near-zero cutting waste by SpL, research should be conducted (a) by determining an SpL that meets the minimum order quantity conditions during RC structure design, or (b) by finding a SpL that meets the minimum order quantity conditions after structural design. In both cases, partial adjustment of LSPs requires a specific length of rebars, and it has been confirmed to be more efficient to apply it during RC structure design.
Considering the conditions such as different use schedules of combined rebar, combinations by special length, and minimum quantity for special order, CWM is not a one-dimensional problem but an n-dimensional CSP. Therefore, it is difficult to realize near-zero cutting waste with algorithms for existing one-dimensional cutting stock problems.
It should be dealt with from a sustainable value chain management perspective beyond supply chain management. In particular, if research has been developed to (1) optimization by cutting or combination pattern, (2) optimization of rebar information generated after structural design results are drawn, and (3) optimization of the amount of rebars in the structural design stage, in the future, structural design and construction-integrated management should be developed. Structural design should be used to combine special lengths rather than market lengths or stock lengths. This requires GA-based near-zero cutting waste algorithms for developing and integrating them into the RC design process.
Author Contributions
Conceptualization, K.K. and S.K.; methodology, S.K.; validation, K.K., D.K., and S.K.; formal analysis, K.K. and S.K.; investigation, K.K. and D.K.; resources, K.K. and D.K.; data curation, K.K. and D.K.; writing—original draft preparation, K.K. and S.K.; writing—review and editing, K.K. and S.K.; supervision, S.K.; project administration, S.K.; funding acquisition, S.K. All authors have read and agreed to the published version of the manuscript.
Funding
This work was supported by the National Research Foundation of Korea (NRF) grant funded by the Korea government (MOE) (No. 2017R1D1A1B04033761).
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Informed consent was obtained from all subjects involved in the study.
Data Availability Statement
Data sharing is not applicable to this article.
Conflicts of Interest
The authors declare no conflict of interest.
Abbreviations
AR | Augmented Reality |
ASCE | American Society of Civil Engineers |
BIM | Building Information Model |
BSA | Binary Search Algorithm |
C25/30 | Compressive Strength of Concrete in N/mm2 when Tested with Cylinder/Cube |
CAD | Computer-Aided Design |
CAM | Computer-Aided Manufacture |
CSP | Cutting Stock Problem |
CWM | Cutting Waste Minimization |
D10, D32 | High-Tensile Deformed Bar in Diameter. D10: 10 mm, D32: 32 mm |
EA | Each |
ECO2 | Embodied Carbon Dioxide |
GA | Genetic Algorithm |
GDP | Gross Domestic Product |
GHG | Greenhouse Gas |
HA | Heuristic Algorithm |
HS | Harmony Search |
IFC | Industry Foundation Classes |
IP | Integer Programming |
JCEM | Journal of Construction Engineering and Management |
JCR | Journal Citation Reports |
LP | Linear Programming |
LSP | Lap Splice Position |
PRISMA | Preferred Reporting Items for Systematic Reviews and Meta-Analyses |
QTO | Quantity Take-Off |
RC | Reinforced Concrete |
SA | Simulated Annealing |
SCI/SCIE | Science Citation Index/Science Citation Index Expanded |
SLR | Systematic Literature Review |
SpL | Special Length |
StL | Stock Length |
VR | Virtual Reality |
WoS | Web of Sciences |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Figures and Tables
Figure 1. Flow diagram of the literature review and the analysis process. Source: authors’ research results.
Estimation of rebar quantity compared to concrete in reinforced concrete structures.
Description | No. of Projects | Concrete (m3) | Rebar (Ton) | Rebar/Concrete (Ton/m3) |
---|---|---|---|---|
Residential buildings | 30 | 4,680,573 | 327,489 | 0.070 |
Commercial buildings | 12 | 835,514 | 99,698 | 0.119 |
Sum | 42 | 5,516,087 | 427,187 | 0.077 |
Source: authors’ research results.
Table 2Estimated global annual use of concrete and rebar, and CO2 emissions of rebar.
Year | World GDP Growth Rate (%) | Concrete |
Rebar |
CO2 Emission |
---|---|---|---|---|
2012 | 2.52 | 10.058 | 778,930,801 | 266,082,762 |
2013 | 2.66 | 10.326 | 799,650,360 | 273,160,563 |
2014 | 2.85 | 10.620 | 822,440,395 | 280,945,639 |
2015 | 2.88 | 10.926 | 846,126,679 | 289,036,873 |
2016 | 2.59 | 11.209 | 868,041,360 | 296,522,929 |
2017 | 3.26 | 11.574 | 896,339,508 | 306,189,576 |
2018 | 3.10 | 11.933 | 924,126,033 | 315,681,453 |
2019 | 2.48 | 12.229 | 947,044,359 | 323,510,353 |
Source: authors’ research results.
Table 3Estimation of global annual rebar cutting wastes and CO2 emissions.
Year | Rebar |
Cutting Wastes of Rebar |
CO2 Emissions from Cutting Wastes (Ton∙CO2) | ||
---|---|---|---|---|---|
3% | 5% | 3% | 5% | ||
2012 | 778,930,801 | 23,367,924 | 38,946,540 | 7,982,483 | 13,304,138 |
2013 | 799,650,360 | 23,989,511 | 39,982,518 | 8,194,817 | 13,658,028 |
2014 | 822,440,395 | 24,673,212 | 41,122,020 | 8,428,369 | 14,047,282 |
2015 | 846,126,679 | 25,383,800 | 42,306,334 | 8,671,106 | 14,451,844 |
2016 | 868,041,360 | 26,041,241 | 43,402,068 | 8,895,688 | 14,826,146 |
2017 | 896,339,508 | 26,890,185 | 44,816,975 | 9,185,687 | 15,309,479 |
2018 | 924,126,033 | 27,723,781 | 46,206,302 | 9,470,444 | 15,784,073 |
2019 | 947,044,359 | 28,411,331 | 47,352,218 | 9,705,311 | 16,175,518 |
Source: authors’ research results.
Table 4Search by keyword in literature database (as of 1 December 2020).
Literature Database | Literature Keywords | |||
---|---|---|---|---|
Rebar Work | Rebar Optimization | Rebar Cutting Waste | Rebar Cutting Waste Optimization | |
Google Scholar | 79,100 | 16,000 | 14,000 | 4410 |
ScienceDirect | 9041 | 3191 | 409 | 211 |
Springer Link | 4292 | 672 | 384 | 88 |
ASCE Library | 3896 | 962 | 233 | 73 |
Willey Online Library | 2796 | 776 | 265 | 116 |
Taylor and Francis Online | 2002 | 628 | 176 | 60 |
Scopus | 892 | 163 | 13 | 9 |
Web of Science | 572 | 89 | 10 | 6 |
Number of literatures by publication type.
Publication Type | Number of Literatures | Percent |
---|---|---|
Journal | 37 | 71.2% |
Proceedings | 11 | 21.1% |
Dissertation | 3 | 5.8% |
Book chapter | 1 | 1.9% |
Total | 52 | 100.0% |
Source: authors’ research results.
Table 6List of the most popular journals.
Journal Title | Papers | Published Year | JIF 2019 |
---|---|---|---|
Journal of Construction Engineering and Management | 7 | 1993, 1994, 1996, 2000 (2 papers), 2007, and 2012 | 2.347 |
Automation in Construction | 3 | 1995, 2019, and 2021 | 5.669 |
Journal of Computing in Civil Engineering | 2 | 1995, 2013 | 2.979 |
International Journal of Engineering Science | 1 | 2016 | 9.219 |
Computer-Aided Civil and Infrastructure Engineering | 1 | 2014 | 8.552 |
Journal of Advanced Research | 1 | 2016 | 6.992 |
Construction and Building Materials | 1 | 2018 | 4.419 |
International Journal of Computer-Integrated Manufacturing | 1 | 1998 | 2.861 |
Sustainability | 1 | 2020 | 2.576 |
KSCE Journal of Civil Engineering | 1 | 2014 | 1.515 |
Canadian Journal of Civil Engineering | 1 | 2004 | 0.985 |
Construction Management and Economics | 1 | 2014 | - |
Others | 16 | - | - |
Sum | 37 |
Source: authors’ research results.
Table 7Number of literatures by country.
Country | Number of Articles | Remarks |
---|---|---|
Korea | 16 | |
USA | 6 | |
Canada | 5 | |
Israel | 4 | |
Turkey | 3 | |
Bangladesh, India, UK, Taiwan, and Thailand | 2 | Five countries presented 2 papers each |
Albania, Australia, Ethiopia, Germany, Iraq, Malaysia, Spain, and Ukraine | 1 | Eight countries presented 1 paper each |
Total | 37 |
Source: authors’ research results.
Table 8Summary of the adopted optimization techniques.
Optimization Techniques | Advantage | Disadvantage | References |
---|---|---|---|
Linear programming (LP) | Flexibility to be paired up with other approximation to improve convergence | Slower in finding special-length-priority or waste-rate-priority solutions under multiple search conditions | [3,4,5,7,9,12,63,86,93,96,109,114] |
Integer programming (IP) | Rapid generation of solutions under limited search conditions | Difficulty in search of solutions under complex conditions or in search of float number solutions | [7,12,63,100,101,104,105,106] |
Genetic algorithm (GA) | Simplicity in programming, proof in finding the global optimum, applicable to diverse problem domains, computing performance, and diversity of solutions | Time consuming for formulating a CSP problem under complex combination conditions | [8,11,71,83,101,113,118] |
Binary search algorithm (BSA) | Quick search for rebars of a specific length to be used in combination | Long CPU run-time for global search as the increase of rebar combination conditions | [10,116] |
Simulated annealing (SA) | Use for combinatorial optimization problems in a discrete search space and simplicity in implementation | Large computing time and cost if boundary conditions are not provided | [6] |
Heuristic algorithm (HA) | Low computing cost to obtain near-zero cutting waste solution | Large computing time and cost to obtain an optimized solution for all conditions | [62] |
Harmony search (HS) | Easy to build and fast convergence for the optimal solution in a reasonable amount of computational time | Randomness, instability, and uncertainty of search direction | [117] |
Source: authors’ research results.
Table 9Summary by rebar work process.
Work Stage | Contents | References |
---|---|---|
Drawing work | Using the information provided in the drawing, rebar CWM-related tasks are performed. Alternatively, a rebar drawing is created by applying CWM algorithm. | [3,6,55,84,86,87,88,89,91,95,97,98,103,105,108,110,111,114,119,120] |
Quantity take-off | Rebar CWM algorithm is connected to the QTO task and progress. | [3,5,6,85,86,87,90,91,98,103,107,108,111,113,115,116] |
Rebar production | After completing the bar bending schedule, the work is performed to combine cutting patterns using CWM algorithm. | [6,8,87,88,91,92,94,95,96,99,107,111,112,116] |
Rebar placement | For CWM, the cutting wastes are reduced by adjusting the lap splice position or length of the rebars in the range of satisfying the structural code. | [84,85,89,97,98,102,103,105,110,112,118,120] |
Summary by other factors.
Factor | Contents | References |
---|---|---|
LSP | Adjusting lap splice position to satisfy structural code to make the length of rebars used for cutting patterns constant | [6,7,12,86,105,108,112,119] |
StL | Performing CWM on rebar in stock or market length | [3,4,6,9,10,11,86,90,104,105] |
SpL | Performing CWM on rebars with special ordered length | [3,4,6,10,90] |
ECO2 comparison between splice lap and coupler.
Size | Building Element | Unit Weight |
Splice |
Splice |
Coupler Weight (KG/EA) | Weight |
ECO2 |
Reduction |
---|---|---|---|---|---|---|---|---|
D10 | Wall | 0.560 | 0.350 | 0.196 | 0.030 | 0.166 | 0.145 | 84.7 |
D13 | Wall | 0.995 | 0.450 | 0.448 | 0.042 | 0.406 | 0.354 | 90.6 |
D16 | Wall | 1.560 | 0.660 | 1.030 | 0.060 | 0.970 | 0.845 | 94.2 |
D19 | Wall | 2.250 | 0.730 | 1.643 | 0.109 | 1.534 | 1.337 | 93.4 |
D22 | Column | 3.040 | 1.450 | 4.408 | 0.160 | 4.248 | 3.704 | 96.4 |
D25 | Column | 3.980 | 1.650 | 6.567 | 0.260 | 6.307 | 5.500 | 96.0 |
D29 | Column | 5.040 | 2.150 | 10.836 | 0.390 | 10.446 | 9.109 | 96.4 |
D32 | Column | 6.230 | 2.370 | 14.765 | 0.528 | 14.237 | 12.415 | 96.4 |
Source: authors’ research results.
Table 12Cost comparison between splice lap and coupler.
Size | Rebar Cost (USD/Ton) | Splice Cost (USD/EA) | Coupler Cost (USD/EA) | Difference (USD/EA) |
---|---|---|---|---|
D10 | 930.36 | 0.18 | 4.46 | −4.28 |
D13 | 921.43 | 0.41 | 4.91 | −4.50 |
D16 | 934.82 | 0.96 | 5.36 | −4.39 |
D19 | 934.82 | 1.54 | 5.80 | −4.27 |
D22 | 934.82 | 4.12 | 6.25 | −2.13 |
D25 | 934.82 | 6.14 | 6.70 | −0.56 |
D29 | 934.82 | 10.13 | 7.14 | 2.99 |
D32 | 934.82 | 13.80 | 7.59 | 6.21 |
Exchange rate: 1120 Won/USD as of 25 February 2021, Bank of Korea. (Source: authors’ research results).
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
© 2021 by the authors.
Abstract
Rebar, the core resource of reinforced concrete structures, generates more carbon dioxide per unit weight than any other construction resource. Therefore, reducing rebar cutting wastes greatly contributes to the reduction of greenhouse gas (GHG). Over the past decades, many studies have been conducted to minimize cutting wastes, and various optimization algorithms have been proposed. However, the reality is that about 3 to 5% of cutting wastes are still generated. In this paper, the trends in the research on cutting waste minimization (CWM) of rebar for sustainable work are reviewed in a systematic method with meta-analysis. So far, the literature related to cutting waste minimization or optimization of rebar published has been identified, screened, and selected for eligibility by Preferred Reporting Items for Systematic Reviews and Meta-Analyses, and the final 52 records have been included in quantitative and qualitative syntheses. Review by meta-analysis was conducted on selected literatures, and the results were discussed. The findings identified after reviewing the literature are: (1) many studies have performed optimization for the market length, making it difficult to realize near-zero cutting wastes; (2) to achieve near-zero cutting wastes, rebars must be matched to a specific length by partially adjusting the lap splice position (LSP); (3) CWM is not a one-dimensional problem but an n-dimensional cutting stock problem when considering several rebar combination conditions; and (4) CWM should be dealt with in terms of sustainable value chain management in terms of GHG contributions.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer