Full Text

Turn on search term navigation

Copyright © 2020 Yugang Liu et al. This work is licensed under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

High volume of traffic is loaded on urban highway during peak hours as well as the ramp connecting main road and auxiliary road of highway. Once the demand exceeds the capacity of the ramp, congestion may happen on both main road and the auxiliary road. To deal with this problem, an new urban highway ramp, switchable ramp (SR) that can switch between on and off condition, is proposed in this paper. A macroscopic time-space discrete model is built in this paper to model this process by dividing the studied time period into short time periods and the studied road segment into small sections. The impact of the type of ramp on upstream and downstream traffic flow is analyzed. A segment of urban highway in Chengdu, China, is used as a case study. The traffic flow data in peak hours is collected and used. Mathematical analysis proves that the SR system proposed in this paper can reduce the total travel time (TTT) in the studied area. Results show that the SR system is more useful when the traffic volume is high.

Details

Title
Design and Control Method of Switchable On- or Off-Ramp for Urban Highway
Author
Liu, Yugang 1 ; Yi, Hongbo 2 ; Li, Jiali 3 ; Chen, Bin 4 ; Yang, Hongtai 2   VIAFID ORCID Logo 

 School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 611756, China; National Engineering Laboratory of Integrated Transportation Big Data Application Technology, Southwest Jiaotong University, Chengdu 611756, China; National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 611756, China; Institute of Transportation Development Strategy & Planning of Sichuan Province, Chengdu 610000, China 
 School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 611756, China; National Engineering Laboratory of Integrated Transportation Big Data Application Technology, Southwest Jiaotong University, Chengdu 611756, China; National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 611756, China 
 School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 611756, China; National Engineering Laboratory of Integrated Transportation Big Data Application Technology, Southwest Jiaotong University, Chengdu 611756, China; National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 611756, China; Department of Civil Engineering, Monash University, Melbourne, Australia 
 Institute of Transportation Development Strategy & Planning of Sichuan Province, Chengdu 610000, China 
Editor
Giuseppe Guido
Publication year
2020
Publication date
2020
Publisher
John Wiley & Sons, Inc.
ISSN
01976729
e-ISSN
20423195
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2442159655
Copyright
Copyright © 2020 Yugang Liu et al. This work is licensed under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.