Dwell time estimation models for bus rapid transit stations
Fazhi LI*, Zhengyu DUAN, Dongyuan YANG
Key Laboratory of Road and Traffic Engineering of the Ministry of Education, School of Transportation Engineering, Tongji Uni
versity, Shanghai 201804, China
Abstract: Bus rapid transit (BRT) systems have been shown to have many advantages including affordability, high ca
pacity vehicles, and reliable service. Due to these attractive advantages, many cities throughout the world are in the
process of planning the construction of BRT systems. To improve the performance of BRT systems, many researchers
study BRT operation and control, which include the study of dwell times at bus/BRT stations. To ensure the effectiveness
of real-time control which aims to avoid bus/BRT vehicles congestion, accurate dwell time models are needed. We de
velop our models using data from a BRT vehicle survey conducted in Changzhou, China, where BRT lines are built
along passenger corridors, and BRT stations are enclosed like light rails. This means that interactions between passen
gers traveling on the BRT system are more frequent than those in traditional transit system who use platform stations. We
statistically analyze the BRT vehicle survey data, and based on this analysis, we are able to make the following conclu
sions: () The delay time per passenger at a BRT station is less than that at a non-BRT station, which implies that BRT stations are efficient in the sense that they are able to move passengers quickly. () The dwell time follows a logarithmic normal distribution with a mean of 2.56 and a variance of 0.53. () The greater the number of BRT lines serviced by a station, the longer the dwell time is. () Daily travel demands are highest during the morning peak interval where
the dwell time, the number of passengers boarding and alighting and the number of passengers on vehicles reach their
maximum values. () The dwell time is highly positively correlated with the total number of passengers boarding and alighting. ( The delay per passenger is negatively correlated with the total number of passengers boarding and alight
ing. We propose two dwell time models for the BRT station. The first proposed model is a linear model while the second
is nonlinear. We introduce the conflict between passengers boarding and alighting into our models. Finally, by comparing
our models with the models of Rajbhandari and Chien et al., and TCQSM (Transit Capacity and Quality of Service Man
ual), we conclude that the proposed nonlinear model can better predict the dwell time at BRT stations. Key words: dwell time model; conflict factor; bus rapid transit (BRT) station
2012 JMT. All rights reserved.
1. Introduction
I t has been widely recognized that public transportation can effectively relieve traffic congestion in urban areas. Bus rapid transit (BRT) has attracted increasing attention in recent years from both the general public and respective governments as an attractive alternative to other public transportations. In contrast to the traditional bus systems, BRT uses exclusive bus lanes, which guarantees high speed and reliability. However, many factors impact BRT travel time, two of which are the dwell time at bus stops along the route and intersection delays.
The dwell time is the time that a public transportation
Received Nov. 7, 2011; revision accepted Mar. 26, 2012
*Corresponding author. E-mail: [email protected] (F.Z. LI)
2012 JMT. All rights reserved
doi: 10.3969/j.issn.2095-087X.2012.03.007
vehicle spends at a station or stop while passengers board and alight. The dwell time therefore depends on the numbers of passengers boarding and alighting, plus other vehicle and stop characteristics such as platform height, door width, fare collection method, internal layout of vehicles, occupancy of vehicles, etc. Traditionally, the dwell time is simply described as a linear function with respect to the number of passengers boarding and alighting. Although linear models are intuitive and simple, they generally can not reach the precision that real-time control and automatic driving require.
In this paper, we consider the relationship between the dwell time and relevant factors, and develop dwell time models for BRT stations.
2. Literature review
As of date, there are two aspects of dwell time that are studied. The first considers dwell time models which specify the relationship between dwell time and relevant
Journal of Modern Transportation 2012 20(3): 168-177 169
factors, such as the number of passengers boarding and alighting, degree of crowdedness on vehicles, the number of standees on a station platform, etc. These models are typically used to forecast or estimate travel time, and to predict and update bus route logistics. The second aspect considers how the physical environment of transit facilities affects dwell time, including the height of the boarding floor and platform, the height of vehicle floor, the number of doors and their widths, the fare collection method, etc. This research is used to improve transit infrastructure, such as vehicles door width and platform height. In this paper, we develop a dwell time model, which places our work in the body of research trying to understand relationships between dwell time and various predictors. As such, we briefly review the literature related to dwell time models.
The first dwell time models were typically linear models, which considered only the number of passengers boarding and alighting [1-4]. Lin and Wilson [5] introduced the number of departing standees at a station in the dwell time model for a light rail system.
Another model was proposed by Guenthner and Sinha in 1983, which was per passenger time delay model written as
DT 5.0 1.2ln ( ),
Total
Total
where DT is the dwell time at bus stops, and Total is the total number of passengers boarding and alighting [6].
A relevant nonlinear model was proposed by Puong in 2000, which modeled the effect of the cubic number of standees per door on vehicles to per boarding passenger [7]. Several other nonlinear models were proposed in other studies [8-12].
One of these proposed nonlinear models can be attributed to Gibson and Fernndez [8], who proposed a dwell time model:
More recently, Jaiswal et al. [11,13-14] introduced time lost into the dwell time model. The time lost by the bus is a loading area specific parameter and is included to account for the requirement that the passenger walk along a lengthy BRT station platform to reach the bus entry door. In their study, they analyzed the differences between boarding and alighting times at three loading areas at one station. As a result of their study, the following conclusions were made: per passenger boarding time was 5.9 s [14] , () the least time lost resulted from the mid-loading (the second) area, while the greatest time lost resulted from loading at the third area [13], and () 85% of the time lost calculated for each of the three loading areas was 7.2, 4.5, and 8.7 s [11].
Among all the models discussed, the model parameters of TCQSM [4] and Rajbhandari and Chien et al. [9] are obtained easily and these models consider similar predictor variables, so we will compare our model with these two in Section 7.
New technologies, such as automatic driving, real-time control, self-adaptive control, require that we develop quantitatively accurate dwell time models. Though the proposed linear dwell time models have advantages with respect to data collection and computation, their predictions are not accurate enough to keep up with these advancing technologies. These linear models were used in low population areas, like Europe and America, but they may not be ideal for more populated areas, like Asia. In summary, there is an urgent need for new dwell time models.
3. Definitions
The dwell time is the time that a public transportion vehicle spends servicing boarding and alighting passengers at a station or a bus stop. The dwell time begins when the public transportation vehicle arrives and stops at station and ends when the vehicle begins to move away from the station. The dwell time is denoted by DT .
The numbers of passengers boarding/alighting per door is the number of passengers getting on/off public transport vehicle through a door, and are denoted by i
'
0 0 1
' " "1 1 1 1 2 2 2 3
( )
max ( ) ( ) ,
j
DT
E E G
^ `
E E G E G E E G
E
PB e PA
PAj j
j door
' 2
PA are the number of passengers
boarding and alighting through door j , respectively;
i k
where j
PB and j
PB
and i
E are parameters such that 0
E is the dead time, 1
PA , respectively, where i refers to door i .
The total numbers of passengers boarding/alighting is the sum of the number of passengers boarding/alighting through all doors. They are denoted by /
i
E are
i
E are per passenger alinghting time (except for
per passenger boarding time and 2
i
PB PA , where
E , which is the parameter of the exponential function), and k
' 2
G is a dummy
PB PB
, .
i
PA PA
i
i
i
G =1 if there is congestion on the platform, 2
variable where 1
G =1 when more than four passengers board the bus at a single stop, 3
The total number of passengers boarding and alighting is the sum of the number of passengers boarding and alighting through all doors. It is noted by Total , where
G =1 if the aisle of the bus is full, and otherwise, k
G is zero.
170 Fazhi LI et al. / Dwell time estimation models for bus rapid transit stations
Table 1 Changzhou BRT line system details
Line Length
(km)
Average length
of station (m)
Departure interval during
non-peak hours (min)
B1 24.5 980 18 4 23 4B11 17.5 693 12 2 34 46B12 13.8 552 12 2 34 56B13 13.0 684 12 2 23 46B2 20.3 781 18 4 45 68B21 9.3 715 18 4 6 68B22 6.4 711 12 2 45 57B23 13.9 463 12 2 34 46
( )
i i i
Length of
vehicle (m) Door No.
Departure interval during
peak hours (min)
,
The number of passengers in a public transportion vehicle is the total number of people in the vehicle when it leaves from the upstream station. This variable is denoted by PV .
The conflict factor is a variable which describes the interaction between the passengers on the vehicle with those not on the vehicle. It is denoted by CF , where
i i i
Total PB PA
CF PB PA
u ,
The delay time per passenger is the average time that every passenger spends boarding and alighting. It is denoted by Dp , where Dp DT Total .
4. Data collection and data processing
Data was collected in Changzhou city, which is located in east China, and has a population of 5.77 million people as of 2009. In Changzhou, 18% commuter trips were completed using public transit. As opposed to the conventional routes, in Changzhou BRT vehicles operate on exclusive bus lanes.
Currently, there are two hybrid BRT channels in Changzhou City. The BRT1 channel is composed of main-line B1 and sub-lines B11, B12 and B13. The BRT2 channel is composed of main-line B2 and sub-lines B21, B22 and B23. These two channels form crossing passenger corridors, where BRT1 runs from south to north and BRT2 from east to west. Every BRT station has two loading areas. The details of these BRT lines are listed in Table 1.
B1 and B2 are main lines of the BRT network. All stations for these main lines are BRT stations, and each station has two loading areas. The height of platforms is level with the BRT vehicles floors. Passengers prepay their fare at stations entrance using coins or intelligent card. Passengers can get on or off the BRT using any
door of BRT vehicle. Each station services one line or more lines.
Data was collected on board transit survey that took place on June 10, 2010, where 150 volunteers participated in this survey. The DT at the station and the numbers of PB and PA per door were recorded. This survey took place during the hours of 6:30 AM to 6:00 PM. From this survey, we obtained 5 958 records, the details of which are shown in Table 2.
Table 2 Summary of the numbers of collected samples
Category Number of
records
Percent
(%)
Total 5 958 100
B1 792 13.3 B11 860 14.4 B12 846 14.2 B13 665 11.2 B2 864 14.5 B21 539 9.0 B22 384 6.4 B23 1 008 16.9 Morning peak interval 1 849 31.0
Noon interval 2 372 39.8 Evening peak interval 1 607 27.0 BRT station, 4-door vehicle 2 039 34.2 Non-BRT station,4-door vehicle 156 2.6
BRT station, 2-door vehicle 1 158 19.4 Non-BRT station, 2-door vehicle 2 601 43.7
A BRT station sharing 1 line 816 13.7 A BRT station sharing 2 lines 899 15.1 A BRT station sharing 3 lines 984 16.5 A BRT station sharing 4 and 5 lines 498 8.4
Journal of Modern Transportation 2012 20(3): 168-177 171
Each vehicle on the B1, B2 and B21 lines has four doors while all other vehicles servicing other lines have two doors. One person was assigned to record the number of PB, PA and DT for a single door. So for each BRT station there are four or two DT records. To analyze data and develop our dwell time model, we need to choose one dwell time record per stop. To process the data, we followed two steps.
Step 1: Filtering data. Dwell time data whose value was larger than 180 s or smaller than 3 s were deleted.These unusually small or large measurements are likely the result of subjective judgment error and recording error.
Step 2: Determining the dwell time per stop. After step 1, there still exists more than one dwell time record for each stop, so we need to determine which record is to use as our dwell time. The record whose value is clos
est to the mean of all records is chosen as the final dwell time. If there is more than one final dwell time record, we keep the largest as the final dwell time.
5. Data analysis
5.1. Statistical analysis of the BRT system
5.1.1. Dwell time difference between BRT stations and non-BRT stations
Some sub-line stations are not exclusive BRT stations and service both the BRT bus as well as the traditional bus. According to our data analysis (Table 3), the mean dwell time at BRT stations was 16.8 s, which is 4.14 s longer than that of non-BRT stations, i.e., 33% of the
Table 3 Statistics of dwell time attributes for BRT and non-BRT stations
Category Mean
95% confidence interval for mean
5% trimmed mean Std.
Dev.
Lower bound Upper bound
DT (s)
BRT station 16.80 16.46 17.14 15.64 9.781 Non-BRT station 12.66 12.36 12.96 11.79 7.949
Dp
(s/pax)
BRT station 2.56 2.45 2.66 2.10 2.975 Non-BRT station 3.28 3.17 3.39 2.93 2.782
Total
(pax)
BRT station 11.52 11.18 11.86 10.61 9.692 Non-BRT station 6.04 5.77 6.30 5.14 7.075
PV
(pax)
BRT station 41.03 40.15 41.92 39.45 25.550 Non-BRT station 27.61 26.87 28.35 26.07 19.877
mean dwell time of non-BRT stations. The average delay time per passenger on a BRT station was 2.56 s, which is 0.72 s less than that at a non-BRT station, i.e., 22% of that at a non-BRT station. The average total number of boarding and alighting passengers at BRT stations is 1.9 times that at non-BRT stations. The average number of passengers in a public transportation vehicle at BRT stations is 1.5 times that of non-BRT stations.
By the above comparison, we conclude that the BRT
station is more high-efficient than a non-BRT station.
BRT stations can reduce trip time and improve the level of services available on that transit system. The BRT dwelling time problem has some new characteristics, such as per passenger delay time, total number of boarding and alighting passengers and load on vehicles, and therefore it is necessary to study the relationship between dwell time and station properties.
5.1.2. Distribution of dwell time
The results from statistical data analysis are shown in
Table 4 and Fig. 1. The mean dwell time of BRT in Changzhou was 14.78 s. The dwell time measurements for both the entire data set including all lines and for each BRT line consistently follow the logarithmic normal distribution and the distribution parameters mu and sigma of the data set including all lines were 2.56 and 0.53.
5.2. Statistic analysis of BRT station data
5.2.1. Time interval analysis
To understand how dwell time changes throughout different time intervals, we divided the data into three time intervals: the morning peak interval (6:309:00), the noon interval (9:0016:00), and the evening peak interval (16:0018:00). The results of the statistical analysis of the divided data are displayed in Table 5 and Fig. 2. The maximum mean dwell time occurred in the morning peak interval was 19.03 s. The minimum mean dwell time occurred in the noon interval was 15.61 s. In the evening peak interval, the mean of dwell time was 16.59 s.
172 Fazhi LI et al. / Dwell time estimation models for bus rapid transit stations
(a) Probability density distribution (b) Cumulative probability distribution Fig. 1 Distributions of dwell time
Table 4 The dwell time distribution parameters for all BRT lines
Parameter All B1 B2 B11 B12 B13 B21 B22 B23 Mean (s) 14.78 16.62 15.57 15.36 13.79 11.91 16.05 15.37 13.72 Variance (s2) 69.08 63.53 40.87 75.11 90.01 54.22 45.50 50.41 65.60
Lognormal
distribution
mu 2.556 2.707 2.667 2.594 2.430 2.316 2.694 2.636 2.469 sigma 0.524 0.455 0.395 0.526 0.623 0.569 0.403 0.440 0.547
1.00
Density
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
Cumulative probability
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0.00
Frequency
Lognormal PDF
Frequency
Lognormal PDF
0 10 20 30 40 50 60 70
Dwell time (s)
0 10 20 30 40 50 60 70
Dwell time (s)
80 90
mu 0.007 0.016 0.013 0.018 0.021 0.022 0.022 0.022 0.017 sigma 0.005 0.011 0.010 0.013 0.015 0.016 0.016 0.016 0.012
Table 5 Statistical analysis according to time intervalAttributes Time Mean Std. Dev. Skewness Kurtosis
DT (s)
6:309:00 19.03 10.93 2.587 9.995 9:0016:00 15.61 7.89 2.999 15.942 16:0018:00 16.59 9.58 3.339 17.502
Std. Err.
Total (pax)
6:309:00 14.34 10.87 1.198 1.282 9:0016:00 9.81 7.84 1.578 3.273 16:0018:00 12.20 9.71 1.515 2.932
PB (pax)
6:309:00 7.37 7.55 1.678 3.487 9:0016:00 5.02 5.22 1.577 2.967 16:0018:00 5.77 6.86 2.100 5.886
PA (pax)
6:309:00 6.96 7.85 1.936 5.031 9:0016:00 4.79 5.26 2.330 9.740 16:0018:00 6.43 6.33 1.507 2.675
Dp (s/pax)
6:309:00 2.21 2.57 6.347 72.287 9:0016:00 2.85 3.09 3.301 14.271 16:0018:00 2.48 3.03 4.216 25.235
PV (pax)
6:309:00 51.67 28.74 0.699 0.464 9:0016:00 32.55 18.51 0.571 0.259 16:0018:00 43.71 25.38 0.791 0.644
Journal of Modern Transportation 2012 20(3): 168-177 173
60 6:309:00 9:0016:00 16:0018:00
60
2-door vehicle 4-door vehicle
50 40 30 20 10
50 40 30 20 10
0
0 DT Total PBi PV
PAi Dp
DT Total PBi PV
PAi Dp
Fig. 2 Statistical analysis according to time interval
The maximum average number of passengers on the BRT vehicle occurred during 6:309:00 was 52 persons. The mean number of passengers was smallest during the noon interval and was 33 persons. During 16:0018:00 interval, the mean number of passengers was 44 persons. In addition, the maximum average number of total on and off passengers was 14 persons during the morning peak.
During the morning peak interval, DT, Total, PB, PA and PV, are higher than during the other intervals. This means that the transit demand during the morning peak is higher than that of the other intervals, which is in line with our understandings of the BRT. We found that DT was positively correlated with Total, PB, PA and PV. Also, when the number of passengers increased, we found that Dp decreased. Therefore Dp is negatively correlated with Total, PB, PA and PV.
5.2.2. Vehicle type analysis
There are two types of vehicles servicing the Chang-zhou BRT system: a 2-door vehicle and a 4-door vehicle. Cross analysis on vehicle types and time intervals was performed for each of DT, Total, PB, PA, Dp, and PV and the results are shown in Figs. 35.
During the morning peak interval, the DT of the 4-door vehicles was 17.75 s, and that of 2-door vehicle was 21.18 s. This suggests that 4-door vehicles are more efficient than 2-door vehicles. The 4-door vehicles service 14.56 passengers on average at each stop, while the 2-door vehicles service 13.96 passengers on average at each stop. Also, the 4-door vehicles are able to carry
Fig. 3 Analysis of vehicle type during 6:309:00
Fig 4 Analysis of vehicle type during 9:0016:00
Fig 5 Analysis of vehicle type during 16:0018:00
more passengers than the 2-door vehicles. Lastly, we note that the Dp of the 4-door vehicles was 2.06 s and that of the 2-door vehicles was 2.45 s, demonstrating that 4-door vehicles are more efficient than 2-door vehicles.
During the noon interval, the DT and Dp of the 2-door vehicles were smaller than those of the 4-door vehicles. By contrast, it is more efficient for large capacity vehicles to service areas with high-travel demand and for common vehicles to run on low-travel demand transit lines. BRT lines are always built along public transportation corridor. Generally, BRT systems need to carry many passengers, so the 4-door high-capacity vehicle is usually the preferred choice of vehicle.
5.3. Statistical analysis of the BRT main-lines
The number of lines that one station services will influence the dwell time and the associated dwell time factors. The number of lines serviced per station ranges from 1 to 5. First we analyze the data from the entire day, and the results are shown in Table 6. The results demonstrate that the more lines a BRT station services, the longer the DT .
In order to further understand the relationships between DT and the factors of influence, we conducted cross analysis with respect to the number of lines that a station services and time interval. The results for the morning peak interval are shown in Fig. 6, those from the noon interval in Fig. 7, and those from the evening
60
2-door vehicle 4-door vehicle
50 40 30 20 10
0
DT Total PBi PV
PAi Dp
60
2-door vehicle 4-door vehicle
50 40 30 20 10
0
DT Total PBi PV
PAi Dp
174 Fazhi LI et al. / Dwell time estimation models for bus rapid transit stations
peak interval in Fig. 8. A comparison of the DT according to the number of the lines that a station services for the three intervals is shown in Fig. 9.
The areas in which a station services many bus lines are generally passenger corridors and central districts of cities, where the demand for public transportation is high. The greater the number of lines that shares a station, the greater the number of passengers per vehicle. The figures show that the DT of BRT stations increases with the number of the BRT lines. Additionally, we also found positive correlations between DT and PB, PA and PV.
In Fig. 9, we can see that the dwell time during the evening peak is similar to that during the noon interval. For both of these intervals, the dwell time increases with the number of lines until this number reaches 5.
Table 6 Statistics by the number of station servicing BRT lines
Attributes 1 2 3 4 5
DT (s) 15.11 16.33 16.54 20.27 19.69 Total (pax) 10.54 12.62 10.64 21.46 15.30
PB (pax) 5.37 6.42 5.41 9.99 7.73 PA (pax) 5.17 6.20 5.23 11.48 7.57 Dp (s/pax) 2.99 2.24 2.57 1.26 1.79 PV (pax) 37.09 43.84 49.93 46.45 52.56
Fig. 6 Morning peak interval (6:309:00)
Fig. 7 Noon interval (9:0016:00)
100 25
10
DT
Dp
80
20
0
20
5
0
PV
60
15
40
Total PBi
PAi
1 2 3 4 5
Fig. 8 Evening peak interval (16:0018:00)
Fig. 9 DT comparison of three intervals
Six conclusions can be made as a result of our data analysis: () The Dp at a BRT station is less than that at a non-BRT station, which implies that BRT stations are efficient in the sense that they are able to move passengers quickly. () The DT follows a logarithmic normal distribution with a mean of 2.56 and a variance of 0.53. () The greater the BRT lines serviced by a station, the longer the DT. () Daily travel demands are highest during the morning peak interval where DT, PB, PA and PV reach their maximum values. () The DT is highly positively correlated with PB, PA and PV. () The Dp is negatively correlated with the total number of passengers boarding and alighting.
6. Dwell time model
Traditionally dwell time refers to the time that it takes passengers to board and alight plus the dead time which results from the opening and closing of vehicle doors. Early dwell time models primarily considered the linear relationship between the dwell time and the number of passengers boarding and alighting. Later studies introduced new factors into their dwell time models, such as the number of standing commuters on both vehicles and platforms.
There is no doubt that the components of dwell time are directly linked to the time of passengers boarding
26 24 22 20 18 16 14
6:309:00 9:0016:00 16:0018:00
1 2 3 4 5
100 25
10
80
20
0
20
5
0
DT
60
PV
15
40
Total
PBi
PAi
Dp
1 2 3 4 5
80
20
0
DT
20
5
0
60
15
40
PV
Total
PAi
Dp
PBi
1 2 3 4 5
10
Journal of Modern Transportation 2012 20(3): 168-177 175
and alighting plus the dead time. Some scholars have considered dead time to be constant, which is equal to the minimum dwell time. The per passenger delay is associated with many factors, such as vehicle crowdedness, conflict between boarding passengers and alighting passengers, fare payment methods, door width, etc.
The BRT main line stations are level with loading areas, and passengers prepay their fare at the station entrances. In the following models, we consider the time intervals, boarding passengers, alighting passengers, load on vehicles, and conflict factor.
We hypothesize that the load of vehicle can affect per passenger delay and it is a piecewise function with respect to per passenger delay. When it exceeds a threshold, load of vehicle will influence the dwell time, or it will not influence the dwell time.
The correlations between DT and PB, PA, PV and CF are shown in Table 7. The table shows that the most significant correlation is that between DT and CF, and therefore it is reasonable to introduce CF into our dwell time models. The correlation coefficient between DT and all other variables is greater than 0.33, which means that DT may interact with these other variables. Based on these observations, our first model is written as
DT t t PB t PA t PV N
t CF H
G
(1)
where 0
0 1
1,
b a v seat
c
N is the number of seats in the BRT vehicle; 1
t , b
t , a
t , v
t and c
t are parameters; seat
G is a dummy viable, equal to 1 for PV above a critical value, otherwise equal to 0;
H is the model error. Table 7 Correlations between variables
DT PV PB PA CF DT 1.000 0.402 0.407 0.334 0.460 PV 0.402 1.000 0.468 0.253 0.451 PB 0.407 0.468 1.000 0.01 0.555 PA 0.334 0.253 -0.01 1.000 0.560 CF 0.460 0.451 0.555 0.560 1.000
Many factors such as CF and PV directly impact the time of per passenger boarding and/or alighting, and therefore indirectly affect dwell time [8] . Also, dwell time is related to the squares of both PB and PA [10]. Combining these results with the model structure of TCQSM [4], model 2 is written as
2
1
PB
G
G (2)
where , { , } and {1,2,3,4,5},
ij
DT t t t PV N t e t CF PB t PB
t t PV N t e t CF PA t PA H
max{[ ( ) ]( )
[ ( ) ]( )} ,
i
b b seat b b i i b i
i door
0 1 1 2 3 4 5
2
1 1 2 3 4 5 2
PA
i
a a seat a a i i a i
t i b a j
are parameters; are parameters;and 2
H is model error.
7. Comparison with other models
To compare and validate the proposed models, referred to as model 1 and model 2, we compared two published dwell time models with our models. One of the models that we compare our models with is referred to as model 3, and was proposed by Rajbhandari and his partners [9]. Model 3 is given by
DT=t0+bTotal+cSTotal, (3)
where S is standees on vehicles.
The second model we compare our results with is referred to as model 4, which was published by TCQSM[4]. Model 4 is given by
0 .
b a
G t
~
For the case when 55
1, 55,
1 0, 55.
PV
PV
PV t ,
2
R values are shown in Table 8, and fitness parameters are shown in Tables 1013.
Table 8
2
R values for each of four models (PVt55)
Models 1 2 3 4 All data
1 0.485 0.344 0.428 0.444 0.421
2 0.681 0.377 0.499 0.831 0.470
3 0.568 0.327 0.450 0.427 0.472
4 0.356 0.247 0.232 0.252 0.294
The ordering of the
2
DT t t PB t PA
(4)
The data from the morning peak interval (6:309:00) for both B1 and B2 was used to fit models 14. As in the previous BRT main line analysis, we consider the four cases where a BRT station services one, two, three and four BRT lines. We consider the vehicle to be crowded if there are at least 9 passengers standing in the vehicle [9].
According to the specified capacity of 45 passengers per vehicle, we define as the vehicle to be crowd when the PV exceeds 55 passengers. This means that a vehicle is crowded when there are no less than 10 standing passengers. Then the value of 1
G is
R values for the four models for all data is model 3>model 2>model 1>model 4.
2
R value of model 2 is 0.470 which is very close to the model 3
R value of 0.472. When we group the data according to the number of lines serviced by a station, the
2
2
R values are highest when using model 2 in all cases.
176 Fazhi LI et al. / Dwell time estimation models for bus rapid transit stations
This means that model 2 is a better fit to the data than the other models. Examination of the fitted parameters for model 2 shows that the parameters associated with PV ( 3
b
t
1 2.227 1.284 1.105 0.286 0.039 2 8.513 0.763 0.659 0.146 0.062 3 8.947 0.737 0.758 0.145 0.003 t4 7.407 1.584 0.843 0.175 0.131 All data 6.262 1.043 0.779 0.178 0.021
Table 10 Parameters values for model 2 (PV t55)
Cases 0
t and 3
t ), CF ( 4
t and 4
t ), and square items
( 5
b
a
b
a
t ) are all small values with small variance, and they are not sensitive to the number of lines serviced by a BRT station. The parameters associated with
0
t , 1
b
t and 5
a
t , 1
a
t , and exponent terms, 2
t and 2
t , are sensitive to the number of lines serviced by a BRT station and they all have large associated variance.
Table 9 Parameters values for model 1 (PV t55)
Cases 0
t b
t a
t v
t c
b
a
t 1
b
t 2
b
t 3
b
t 4
b
t 5
b
t 1
a
t 2
a
t 3
a
t 4
a
t 5
a
t
1 15.122 0.098 4.302 0.008 0.004 0.562 0.822 8.556 0.002 0.051 0.052 2 3.294 2.213 25.180 0.004 0.009 0.026 1.637 2.034 0.030 0.023 0.045 3 13.827 0.159 3.197 0.032 0.003 0.029 1.729 10.827 0.006 0.022 0.049 t4 26.505 12.649 16.061 0.166 0.075 0.096 0.816 52.537 0.001 0.057 0.033 All data 10.460 0.372 4.484 0.025 0.003 0.000 1.318 8.000 0.016 0.008 0.038
Table 11 Parameters values for model 3 (PV t55)
Cases 0
t b c1 11.910 0.068 0.009 2 11.302 0.299 0.005 3 14.718 0.088 0.006 t4 12.645 0.115 0.008 All data 12.263 0.149 0.007
Table 12 Parameters values for model 4 (PV t55)
Cases 0
t b
t a
R values for each of four models (PV<55)
Models 1 2 3 4 All data 1 0.365 0.235 0.364 0.694 0.266 2 0.387 0.323 0.637 0.927 0.267 3 0.341 0.265 0.190 0.830 0.252 4 0.362 0.235 0.351 0.475 0.261
Table 14 The parameters of model 1 (PV<55)
Cases 0
t b
t a
t c
t
1 8.609 1.630 1.164 2 11.155 1.337 1.102 3 14.911 0.911 0.951 t4 13.085 1.725 0.492 All data 10.872 1.428 1.013
In the case when PV<55, the
2
t
1 10.145 0.561 0.662 0.034 2 10.091 1.160 0.964 0.012 3 9.873 2.101 0513 0.238 t4 18.020 1.706 0.214 0.284 All data 10.427 0.851 0.690 0.062
Table 15 The parameters of model 3 (PV<55)
Cases 0
R values are shown in Table 13 and the fitted parameter values are shown as
Tables 1417. The
2
R values for models 1 and 2 are better than those for models 3 and 4. However, the fitness
2
R values of four models are all less than 0.3 with the maximum of 0.267. When the data is grouped according to the number of BRT lines serviced by a station, the fitness
2
t b c1 10.496 0.271 0.002 2 10.716 0.493 0.006 3 11.376 0.628 0.007 t4 9.311 0.319 0.000 All data 11.165 0.348 0.005
R values improved significantly.
The comparison of all four models shows that model 2 performs better than the other three models. Recall that model 2 introduced PV, CF, exponent of PB and PA and
squares of PB and PA, and the inclusion of these terms made it possible to better predict dwell time fluctuation.
Table 13
2
Journal of Modern Transportation 2012 20(3): 168-177 177
Table 16 The parameters of model 2 (PV<55)
Cases 0
t 1
b
t 3
b
t 4
b
t 5
b
t 1
a
t 3
a
t 4
a
t 5
a
t
1 10.774 0.343 2.252 0.008 0.053 0.016 2.055 0.000 2.297 2 13.527 0.211 22.080 0.008 0.603 0.199 5.329 0.232 0.244 3 16.232 0.000 0.001 8.6E6 6.84E3 0.164 26.28 0.312 0.277 t4 27.527 8.657 16.518 0.850 0.141 2.099 66.89 0.164 0.042 All data 9.705 1.048 2.573 0.006 0.015 0.777 0.846 0.000 0.002
Table 17 The parameters of model 4 (PV<55)
Cases 0
t b
t a
References
t
1 10.086 0.596 0.682 2 10.107 1.150 0.956 3 8.083 2.792 1.108 t4 9.708 0.969 0.577 All data 10.272 0.935 0.749
8. Conclusions
Since it is evident that the conflict between PA and PB impacts dwell time, we introduce this novel term into our non-linear dwell time model. Additionally, exponential terms which account for the number of passengers boarding and alighting, square terms representing PA and PB, and the number of standing passengers in vehicles are considered in our model. Our model performs better than both model 3 [9] and model 4 [4].
Overall, the goodness of fit for our model is higher than that of models 3 and 4. The
2
R values for our model reach a maximum of 0.831 as shown in Table 9, and a maximum of 0.927 in Table 11. While a BRT station services one, two or three BRT lines, the maximum values of the fitness
2
[1] R. Feder, The Effect of Bus Stop Spacing and Location
on Travel Time, Pittsburgh: Carnegie Mellon University,
1973.
[2] H.S. Levinson, Analyzing transit travel time perform
ance, Transportation Research Record, 1983, 915: 1-6.
[3] R.P. Guenthner, K. Hamat, Transit dwell time under
complex fare structure, Journal of Transportation Engi
neering, 1988, 114(3): 367-379.
[4] TCQSM, Transit Capacity and Quality of Service Man
ual, 2nd Edition, 2003.
[5] T. Lin, N.H. Wilson, Dwell time relationships for light
rail systems, Transportation Research Record, 1992,
1361: 287-295.
[6] R.P. Guenthner, K.C. Sinha, Modeling bus delays due to
passenger boardings and alightings, Transportation Re
search Record, 1983, 915: 7-13.
[7] A. Puong, Dwell time model and analysis for the MBTA
red line, Cambridge: MIT, 2011.
[8] J. Gibson, R. Fernndez, A. Albert, Operation formal
stops in Santiago, In: Proceedings of the VIII Chilean
Congress of Transport Engineering, Santiago, 1997:
397-408.
[9] R. Rajbhandari, S.I. Chien, J.R. Daniel, et al., Estimation
of bus dwell times with automatic passenger counter in
formation, Transportation Research Record, 2003, 1841:
120-127.
[10] K.J. Dueker, T.J. Kimpel, J.G. Strathman, et al., Deter
minants of bus dwell time, Journal of Public Transpor
tation, 2004, 7(1): 21-40.
[11] S. Jaiswal, J.M. Bunker, L. Ferreira, Modeling bus lost
time: an additional parameter influencing bus dwell time
and station platform capacity at bus rapid transit station
platform, In: Transportation Research Board 89th An
nual Meeting, Washington D.C., 2010.
[12] J.D. Fricker, Bus dwell time analysis using onboard
video, In: Transportation Research Board 90th Annual
Meeting, Washington D.C., 2011.
[13] S. Jaiswal, J.M. Bunker, L. Ferreira, Relating bus dwell
time and platform crowding at a busway station, In: Pro
ceedings 31st Australasian Transport Research Forum
(ATRF), Gold Coast: 239-249.
[14] S. Jaiswal, J.M. Bunker, L. Ferreira. Modeling the Rela
tionships between passenger demand and bus delays at
busway stations, In: Transportation Research Board
88th Annual Meeting, Washington D.C., 2009.
(Editor: Yao ZHOU)
R are 0.680, 0.377 and 0.499 respectively for PVt55. For PV<55, the maximum values of the fitness
2
R for those same groups are 0.387, 0.323 and 0.637, respectively.
In the future, well explore the application of this model in automatic vehicle dispatching systems, guided buses, and to help manage multiple BRT vehicles sharing designated roadways. Further research includes the development of the self-adaptive control model for BRT vehicle headway as an extension to the presented dwell model.
Acknowledgements
We want to express thanks to Yuan XUE and Ke WANG for their help with this work.
This research was supported by the National Science and Technology Support Program of China (No. 2009BAG17B01).
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Journal of Modern Transportation is a copyright of Springer, 2012.
Abstract
Bus rapid transit (BRT) systems have been shown to have many advantages including affordability, high capacity vehicles, and reliable service. Due to these attractive advantages, many cities throughout the world are in the process of planning the construction of BRT systems. To improve the performance of BRT systems, many researchers study BRT operation and control, which include the study of dwell times at bus/BRT stations. To ensure the effectiveness of real-time control which aims to avoid bus/BRT vehicles congestion, accurate dwell time models are needed. We develop our models using data from a BRT vehicle survey conducted in Changzhou, China, where BRT lines are built along passenger corridors, and BRT stations are enclosed like light rails. This means that interactions between passengers traveling on the BRT system are more frequent than those in traditional transit system who use platform stations. We statistically analyze the BRT vehicle survey data, and based on this analysis, we are able to make the following conclusions: (I) The delay time per passenger at a BRT station is less than that at a non-BRT station, which implies that BRT stations are efficient in the sense that they are able to move passengers quickly. (II) The dwell time follows a logarithmic normal distribution with a mean of 2.56 and a variance of 0.53. (III) The greater the number of BRT lines serviced by a station, the longer the dwell time is. (IV) Daily travel demands are highest during the morning peak interval where the dwell time, the number of passengers boarding and alighting and the number of passengers on vehicles reach their maximum values. (V) The dwell time is highly positively correlated with the total number of passengers boarding and alighting. (VI) The delay per passenger is negatively correlated with the total number of passengers boarding and alighting. We propose two dwell time models for the BRT station. The first proposed model is a linear model while the second is nonlinear. We introduce the conflict between passengers boarding and alighting into our models. Finally, by comparing our models with the models of Rajbhandari and Chien et al., and TCQSM (Transit Capacity and Quality of Service Manual), we conclude that the proposed nonlinear model can better predict the dwell time at BRT stations.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer