It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 The Institute of Construction Engineering and Management of National Central University, No. 300, Jhongda Rd., Jhongli, Taoyuan, Taiwan