It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Hospital buildings are complex indoor facilities with variable uses and functions that are deals with a higher number of people. Therefore, the air-conditioning (AC) system should be used to keep good indoor air quality (IAQ) for patients and medical staff to meet comfort and health reasons. Operation theatre is one of the important and critical rooms in the hospital building. Usually, operation process will take 5 hours until 12 hours depends on the operation or patience condition. Operation theatres required 100% for fresh air intake and 100% for exhaust air. Therefore, this study analyses the indoor air quality in Operation Theater (OT) at Malaysia. Then focuses on the humidity control strategies using psychrometric chart. AC system and selected IAQ parameter been monitored to understanding the quality of air and energy usage. The result shows carbon monoxide (CO2), carbon dioxide (CO) and temperature (T) level were within the range stipulated in ASHRAE standard 62.1-2016 but relative humidity (RH) in operation theatre exceed the acceptable range. AC system showed the cooling energy usage as 90.1 kW and the heating required 5.6 kW in standard AC system operation. Psychrometric chart analysis to meet the desired temperature and relative humidity been proposed which contribute cooling energy usage was 95.9 kW and heating energy required 12.2kW. Recommendation alternative strategies to reduce cooling and heating energy been highlighted in this study.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Pagoh, Muar, Johor, Malaysia.
2 Faculty of Mechanical and Manufacturing Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya,76100 Durian Tunggal, Melaka, Malaysia.
3 Faculty of Mechanical Engineering, Universiti Tun Hussein Onn Malaysia, Parit Raja 86400 Batu Pahat, Johor, Malaysia.