1. Introduction
Ungrounded distribution systems rely on the natural capacitance between the lines and the ground. Consequently, single line-to-ground (SLG) faults do not cause high current flow, and rapid isolation of the faulted section is not essential. Therefore, ungrounded distribution systems are preferred in industrial plants where high service continuity minimizes the interruption of expensive production processes. However, during an SLG fault, the line-to-ground voltage of non-faulty regions increases to match the line-to-line voltage, which can cause a second SLG fault at the weakest insulation point of the system [1]. The second SLG fault will usually cause a high fault current; therefore, detection and repair of the first SLG fault is important.
The electrical devices of power systems have evolved from electromechanical relays to intelligent electronic devices (IEDs) that communicate with each other. However, this communication has rarely been exploited in protection schemes because reliable and fast operation is required when a fault occurs. Technological breakthroughs have increased the feasibility of communication-based protection schemes. The International Electrotechnical Commission (IEC) 61850 standard describes real-time communication among IEDs using Generic Oriented Object Substation Event (GOOSE) messages [2] and sampled values [3]. As the complexity of a protection system increases, its reliability decreases. With respect to the mean time between failures (MTBF), communication-based protection schemes have lower MTBF than conventional protection schemes. Instead, communication-based protection schemes have advantages to enhance the security of a protection system with the ability of more accurate fault detection. Moreover, IEC 61850 uses retransmission mechanisms for GOOSE messages. This mechanism improves the reliability of IEC 61850-based protection schemes by checking the status of IEDs and their communications continuously. Consequently, protection schemes based on IEC 61850 have been widely used in power systems [4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28] and expanded to protect microgrids [4,5,6] and inter-substations [7,8,9,10]. Distribution system protection schemes based on IEC 61850 are also under study [11,12,13,14,15,16,17,18].
The IEC 61850-based overcurrent principle is exploited for the busbar protection [11] and adaptive protection [12] of distribution systems. However, the use of distributed resources (DRs) may cause protective malfunctions. In reference 13, the 67/67N protection for ring systems with DRs was adapted based on IEC 61850. In reference 14, regional information was utilized to mitigate the negative effect of DRs on protection performance and improve fault tolerance. Current differential principles with higher sensitivity [15] and current differential schemes as the device-failure-related backup protection [16] provide more effective protection for distribution systems. However, current differential protection is confronted with the challenges of data synchronization. The communication-assisted protection scheme described in reference 17 solves this problem by compensating for propagation delay without the need for an external clock. In reference 18, the fault detection times of protective IEDs were improved in various substations based on IEC 61850.
We developed a centralized protection scheme based on IEC 61850 to protect SLG faults in ungrounded distribution systems. SLG faults can be detected in both busbars and feeders, even if the IEC 61850 data are desynchronized. The remainder of this paper is organized as follows. Section 2 describes the characteristics of SLG faults in ungrounded distribution systems. Section 3 discusses centralized protection based on IEC 8150, including how to determine threshold values for SLG faults in feeders and busbars. The communication configuration, and the protective algorithm implemented in the central IED, are also covered. The performance of the centralized protection scheme is evaluated using Power System Computer Aided Design / Electro-Magnetic Transient Design and Control (PSCAD/EMTDC) in Section 4. Section 5 provides our concluding remarks.
2. SLG Faults in an Ungrounded Distribution System
The ungrounded distribution system under study operates radially; four feeders are supplied by a Y/Δ step-down transformer (Figure 1). A ground potential transformer (GPT) is installed at the 22 kV busbar to measure the zero-sequence voltage. The wye-connected primary windings of the GPT are solidly grounded by a current-limiting resistor (CLR) connected across the broken delta of the tertiary windings. The CLR provides very high-resistance grounding for ungrounded systems (of a few tens of kilo-ohms); therefore, SLG faults produce zero-sequence currents that are extremely small compared to the phase currents. Thus, it is nearly impossible to calculate zero-sequence currents from phase currents; zero-sequence current transformers (ZCTs) are commonly used to accurately measure zero-sequence currents. Table 1 summarizes the system configuration. Two different SLG faults were considered in this paper: a fault in a feeder and a fault in the 22 kV busbar. It is noted that the central protection proposed in this paper can be easily applied to other ungrounded distribution systems. The system shown in Figure 1 is just an example to explain the characteristics of SLG faults in ungrounded distribution systems.
2.1. SLG Fault in a Feeder
The angle difference between the zero-sequence voltage and current phasors is generally used to identify the faulty feeder in an ungrounded system. The zero-sequence angle difference of the mth feeder is given by:
θ0m=∠I0m−∠V0m
where∠I0mand∠V0mare the angles of the zero-sequence current and voltage phasors at the mth feeder, respectively. Note that the angle of the zero-sequence voltage phasor should be identical at all feeders, because the GPT supplies the same zero-sequence voltage signal to each feeder IED.
Figure 2 shows the sequence networks, and their interconnections, in a case when an SLG fault developed in the fourth feeder. The notation is as follows:
-
ZL0m: Zero-sequence line impedance of the mth feeder;
-
ZC0m: Zero-sequence line-to-ground capacitive impedance of the mth feeder;
-
ZD0m: Zero-sequence load impedance of the mth feeder;
-
ZS0: Zero-sequence source impedance including the transformer impedance;
-
I0C: Zero-sequence current at the CLR;
-
I0Rm: Zero-sequence current at the relay point of the mth feeder;
-
V0Rm: Zero-sequence voltage at the relay point of the mth feeder;
-
I0F: Zero-sequence current at the fault point.
Where 0 denotes the zero sequence and it is replaced with 1 and 2 to represent the positive and negative sequences, respectively.
The zero-sequence impedance of an ungrounded system is very large; therefore, the positive- and negative-sequence impedances can be ignored when considering the SLG fault in a feeder. This simplifies the sequence network, and thus the phasor diagram (Figure 3). Circuit analysis of the simplified sequence network yields the zero-sequence current at the fault point:
I0F=ES3RF+ZC01~4//3RCL
where the equivalent capacitive impedance of all feeders isZC01~4=ZC01//ZC02//ZC03//ZC04.
In line with the current divider rule, the zero-sequence current at the relay point of the fourth feeder is:
I0R4=I0F×ZC04ZC04+ZC01~3//3RCL
where the equivalent capacitive impedance of the non-faulty feeders isZC01~3=ZC01//ZC02//ZC03.
As shown in Figure 3b, if a forward SLG fault develops in front of the relay point, the zero-sequence angle difference becomes between 0° and 90° depending on the size of the CLR. If a backward SLG fault develops behind the relay point, the theoretical zero-sequence angle difference becomes −90°.
2.2. SLG Fault in a 22 kV Busbar
For busbars in transmission systems, differential protection is commonly used. However, in distribution systems, overcurrent protection is considered to be adequate and thus preferred. For an ungrounded distribution system, however, neither differential nor overcurrent protection can be used to prevent busbar SLG faults because the fault current is small. A dedicated busbar protection is nonetheless required; therefore, we focused on IEC 61850-based protection. Figure 4 shows the sequence network and interconnections when an SLG fault develops in a 22 kV busbar.
Similar to when an SLG faults develops in a feeder, the positive- and negative-sequence impedances can be ignored when considering an SLG fault in a busbar. This simplifies the sequence network and phasor diagram (Figure 5).
Although the topology in Figure 5a differs from that in Figure 3a, the Thevenin equivalent circuits at the fault points, and thus also the zero-sequence currents, are identical. However, the zero-sequence current at the relay point is not the same as that of Equation (3), although it can be calculated using the current divider rule. For example, the zero-sequence current at the relay point of the fourth feeder is:
I0R4=−I0F×ZC01~3//3RCLZC04+ZC01~3//3RCL
As shown in Figure 5b, if an SLG fault develops in a busbar, the zero-sequence angle differences become −90° at the relay points of all feeders; this enables identification of a busbar SLG fault.
3. IEC 61850-Based Centralized Protection
Figure 6 shows the configuration of the IEC 61850-based centralized protection scheme for ungrounded distribution systems. Each feeder IED measures the zero-sequence current and voltage signals at the relay point. After calculating the zero-sequence phasors, the IED transmits them to a central IED via a GOOSE message. The central IED identifies SLG faults based on the zero-sequence phasors. For accurate analysis, data desynchronization among feeder IEDs must be compensated for. Data desynchronization is caused by discrepancies in measurement times (i.e., when data sources update at different times) and time desynchronization (i.e., timestamp errors) [28]. Angle differences between the zero-sequence voltage phasors of feeder IEDs are used to estimate data desynchronization. This is possible because the GPT supplies the same zero-sequence voltage signal to each feeder IED (see Section 2.1). Therefore, centralized protection is based on the zero-sequence angle difference, instead of the angle itself of the zero-sequence voltage and current phasors. Data desynchronization is compensated for when the centralized protection calculates the zero-sequence angle difference.
3.1. Operation of the Central IED When an SLG Fault Occurs in a Feeder
If an SLG fault develops in a feeder, the central IED operates only when the following conditions are all satisfied for the mth feeder:
|V0Rm|>V0T
|I0Rm|>I0TFm
|θ0m−θ0TFm|<90°
The zero-sequence voltage should be larger than the threshold valueV0T . Note that the zero-sequence voltage at each feeder should have the same phasor regardless of SLG fault location, because the Thevenin equivalent circuit at the CLR is identical. Below, we deal with an SLG fault in the fourth feeder; SLG faults in other feeders are handled similarly. As shown in Figure 3a, the zero-sequence voltage at the relay point is:
V0R4=I0C×3RCL
when the zero-sequence current at the CLR is:
I0C=I0R4×ZC01~3ZC01~3+3RCL
Substitution of (2) into (3) yields:
I0R4=ES3RF+ZC01~4//3RCL×ZC04ZC04+ZC01~3//3RCL
Assuming that the fault resistance ranges up to 5 kΩ, it is possible to determineV0TandI0TFmusing (6) and (8), respectively. The threshold value for the zero-sequence angle differenceθ0TFmis also determined by (6) and (8). Note that the zero-sequence angle difference is independent of the fault resistance, as indicated by the relationship betweenV0R4andI0R4 own in Figure 3b.
Although the sum of the zero-sequence currents at the relay points of non-faulty feeders is the same as the capacitive zero-sequence current at the relay point of the faulty feeder, the polarities are opposite. This is useful for determining whether the ZCT polarities are correct. For this purpose, an operatorPis defined as follows:
P(A|B)=|A|sin(θA−θB)ej(θB+2/π)
whereA=|A|ejθAandB=|B|ejθB. Note thatP(A|B)yields the component ofAorthogonal toB. Therefore, the following condition should be satisfied if there is an SLG fault in the fourth feeder:
P(I0R4|V0R4)+∑k=13I0Rk=0
3.2. Operation of the Central IED When an SLG Fault Occurs in a Busbar
If the SLG fault is in a busbar, the central IED operates only when the following conditions are satisfied for every feeder:
|V0Rm|>V0T
|I0Rm|>I0TBm
|θ0m−θ0TB|<90°
The zero-sequence voltage at each feeder is identical for SLG faults with the same fault resistance; therefore, theV0T of (5–1) is used in (11–1). As shown in Figure 5a, the zero-sequence voltage at the relay point is:
V0Rm=I0C×3RCL
where the zero-sequence current at the CLR is:
I0C=I0F×ZC01~4ZC01~4+3RCL
The zero-sequence current at the relay point of the mth feeder is:
I0Rm=−V0RmZC0m
Similar to the case of an SLG fault in a feeder, assuming that the fault resistance ranges up to 5 kΩ, it is possible to determineV0TandI0TBmusing (12) and (14), respectively. In addition, the threshold value for the zero-sequence angle differenceθ0TBcan be easily found from (14); this becomes the angle of−ZC0m.
As shown in Figure 7,θ0TFmis between 0° and 90°, depending on the size of the CLR, whileθ0TBis −90° for all feeders.
3.3. Algorithm for Centralized Protection
Figure 8 shows the flowchart for centralized protection against SLG faults in a feeder and busbar. Each feeder IED periodically transmits its zero-sequence current and voltage phasors to the central IED via GOOSE messages. The central IED uses their magnitudes and angle differences to identify an SLG fault in a feeder or busbar. Data desynchronization is compensated for when the zero-sequence angle difference is calculated.
The presence of an SLG fault is checked for each feeder sequentially. If the operating conditions given in Equation (5) are satisfied for the mth feeder, the central IED determines that an SLG fault develops in the mth feeder and then sends GOOSE messages to trip the circuit breaker of the mth feeder. As shown in Figure 8, the presence of an SLG fault in a busbar is checked independently of this process. If the operating conditions given in (11) are satisfied for every feeder, the central IED determines that an SLG fault develops in the busbar and then sends GOOSE messages to trip the circuit breaker of a main transformer.
4. Performance Evaluation 4.1. Test Environment
To determine the efficiency of the centralized protection scheme, the ungrounded distribution system shown in Figure 1 was modeled using PSCAD/EMTDC. As shown in Figure 9, the system had four feeders, each supplying a 5 MVA load (pf 0.98, delta connection). The distribution line was 20 km in total length.
IEC 61850-based feeder IEDs were implemented using MMS-Ease Lite Library 6.2000.2v, a commercial development tool from SISCO. As shown in Figure 10, the simulated fault signals were imported by the feeder IEDs in advance, and each feeder IED then transmitted zero-sequence phasors to the central IED every 100 ms via GOOSE messages. IEC 61850 packets, including the GOOSE messages, were monitored using IEDScout, a commercial testing tool from OMICRON. This environment was able to test the centralized protection because it is not sensitive to data desynchronization.
4.2. Case Studies
4.2.1. SLG Faults in the Fourth Feeder
At a fault resistance of 5 kΩ, the threshold valuesV0TandI0TFmwere set to 155.5 V and 1.555 mA using (6) and (8), respectively. The threshold value for the zero-sequence angle difference,θ0TFm , was set to 62.14° using both (6) and (8). In the case studies, six SLG faults (resistances of 0, 1, 2, 3, 4, and 5 kΩ) were considered. Figure 11 shows the test results for an SLG fault in the fourth feeder with a fault resistance of 0 kΩ.
All of the conditions in (5) were satisfied; the centralized protection scheme detected the fault and the central IED transmitted GOOSE messages that tripped the fourth feeder (Figure 12). Table 2 summarizes the test results according to the fault resistance. Up to a resistance of 4 kΩ, all of the conditions in (5) were satisfied for the fourth feeder. However, for a fault resistance of 5 kΩ, the measured values were the same or slightly lower than the threshold values, and the centralized protection scheme did not detect the fault. Thus, the fault resistance must be lower than a predefined value.
4.2.2. SLG Faults in a 22 kV Busbar
As mentioned in Section 3.2,θ0TBwas set to −90° for every feeder. At a fault resistance of 5 kΩ, the threshold valueV0Twas set to 155.5 V using (12). The threshold valuesI0TB1,I0TB2,I0TB3, andI0TB4were set to 0.573, 0.344, 0.458, and 0.917 mA, respectively, using Equation (14).
Figure 13 shows the test results for an SLG fault in a busbar with a fault resistance of 3 kΩ. All of conditions in (11) were satisfied for every feeder, and the centralized protection scheme thus detected the SLG fault and transmitted GOOSE messages that tripped the main transformer (Figure 14).
Table 3 summarizes the test results for busbar SLG faults with resistances 1, 3, and 5 kΩ. All of the conditions in (11) were satisfied for every feeder when the resistances were 1 and 3 kΩ. For a fault resistance of 5 kΩ, the measured values were the same or slightly lower than the threshold values, and the centralized protection scheme did not detect the fault. To reiterate, centralized protection can detect SLG busbar faults when the fault resistance is lower than a predefined value.
5. Conclusions We proposed a centralized protection scheme against SLG faults in ungrounded distribution systems associated with centralized environments, such as digital substations, wherein data desynchronization occurs among IEC 61850-based IEDs. The proposed scheme detects against the SLG fault in each feeder and checks whether the ZCT polarities are correct. Particularly, in order to cope with the absence of protection against the SLG fault in a busbar, the proposed scheme provides a dedicated busbar protection with the help of centralized environments. Each feeder IED measures its zero-sequence current and voltage signals and periodically transmits zero-sequence phasors to a central IED via GOOSE messages. To detect SLG faults, the scheme analyzes the angle differences between, and magnitudes of, the zero-sequence current and voltage phasors. The zero-sequence voltage at each feeder IED should be identical; therefore, data desynchronization is compensated for when the zero-sequence angle difference is calculated. The centralized protection was tested using IEC 61850-based IEDs and fault signals simulated by PSCAD/EMTDC. The ungrounded distribution system under study was modeled using PSCAD/EMTDC and then various cases were simulated considering fault location and fault resistance. IEC 61850-based IEDs were implemented using MMS-EASE Lite library 6.2000.2v, and the fault signals simulated by PSCAD/EMTDC were imported to the feeder IEDs. Each feeder IED transmitted its zero-sequence current and voltage phasors to the central IED every 100 ms via GOOSE messages. The central IED aggregated the zero-sequence phasors and transmitted GOOSE messages with trip signals when SLG faults were detected. The system detected SLG faults up to a fault resistance of 5 kΩ; six fault resistances were tested (0, 1, 2, 3, 4, and 5 kΩ). The scheme did not detect faults with resistances of 5 kΩ. These results demonstrated that the centralized protection scheme is useful for detecting the SLG faults in ungrounded systems when the fault resistance is lower than a pre-defined value.
Component | Parameter | |
---|---|---|
Distribution system | Main transformer | 154 kV/22 kV (∆/Y) |
Distribution line | 58mm2ACSR | |
Ground potential transformer | (22/3kV)/(190/3 V) | |
Zero-sequence current transformer | 200 mA/1.5 mA | |
Current-limiting resistor | 8Ω | |
Distribution line | R1,R2 | 0.1780Ω/km |
L1,L2 | 1.0609 mH/km | |
C1,C2 | 0.0107 μF/km | |
R0 | 0.3550Ω/km | |
L0 | 5.3366 mH/km | |
C0 | 0.0039 μF/km |
Fault Resistance (kΩ) | |V0R4|(V) | |I0R4|(mA) | θ04(°) | |θ04−θ0TF4|(°) |
---|---|---|---|---|
0 | 189.6 | 1.899 | 62.15 | 0.002 |
1 | 183.9 | 1.840 | 62.15 | 0.003 |
2 | 177.2 | 1.773 | 62.15 | 0.002 |
3 | 170.0 | 1.701 | 62.15 | 0.003 |
4 | 162.6 | 1.627 | 62.15 | 0.003 |
5 | 155.2 | 1.553 | 62.15 | 0.003 |
Fault Resistance | Feeder Number | |V0Rm|(V) | |I0Rm|(mA) | θ0m(°) | |θ0m−θ0TB|(°) |
---|---|---|---|---|---|
1 kΩ | 1 | 183.8 | 0.678 | −90.00 | 0.001 |
2 | 183.8 | 0.407 | −90.00 | 0.000 | |
3 | 183.8 | 0.542 | −90.00 | 0.000 | |
4 | 183.8 | 1.084 | −90.00 | 0.001 | |
3 kΩ | 1 | 170.0 | 0.627 | −90.00 | 0.000 |
2 | 170.0 | 0.376 | −90.00 | 0.000 | |
3 | 170.0 | 0.501 | −90.00 | 0.000 | |
4 | 170.0 | 1.003 | −90.00 | 0.001 | |
5 kΩ | 1 | 155.2 | 0.572 | −90.00 | 0.000 |
2 | 155.2 | 0.343 | −90.00 | 0.000 | |
3 | 155.2 | 0.458 | −90.00 | 0.000 | |
4 | 155.2 | 0.915 | −90.00 | 0.001 |
Author Contributions
Conceptualization, S.-R.N. and W.-H.K.; methodology, S.-R.N., W.-H.K., S.K., S.-H.K. and N.-H.L.; supervision, S.-R.N.; validation, W.-H.K. and S.K.; writing-original draft preparation, S.-R.N. and W.-H.K.; writing-review and editing, S.K., S.-H.K. and N.-H.L. All authors have read and agreed to the published version of the manuscript.
Funding
This research was supported by the Korea Electric Power Corporation (KEPCO) (Grant number: R17XA05-2). This research was also supported by the Korea research foundation with funding from the government (Ministry of Education) in 2019 (No. NRF-2019R1F1A1059619).
Conflicts of Interest
The authors declare no conflict of interest.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
© 2021. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Abstract
We developed an International Electrotechnical Commission (IEC) 61850-based centralized protection scheme to prevent single line-to-ground (SLG) faults in the feeders and busbars of ungrounded distribution systems. Each feeder intelligent electronic device (IED) measures its zero-sequence current and voltage signals and periodically transmits zero-sequence phasors to a central IED via a Generic Oriented Object Substation Event message. Using the zero-sequence phasors, the central IED detects SLG faults in feeders and busbars. To achieve centralized protection, angle differences between the zero-sequence currents and voltage phasors are exploited, and their calculation compensates for data desynchronization. The feeder IEDs were implemented using the MMS-EASE Lite library, while the transmitted zero-sequence phasors were calculated based on fault signals simulated by Power System Computer Aided Design / Electro-Magnetic Transient Design and Control (PSCAD/EMTDC). The central IED determined if the SLG fault was in a feeder or busbar by aggregating and analyzing the zero-sequence phasors received from the feeder IEDs. The results confirmed the validity and efficiency of our centralized protection scheme.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer