Full Text

Turn on search term navigation

© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Inversion analysis is usually an efficient solution to process the monitoring data of earth-rockfill dams. However, it is still difficult to obtain calculation results that are consistent with monitoring data due to different construction statuses. To deal with this situation and to introduce a new solution to improve calculation accuracy, the general method of inversion analysis based on back-propagation neural networks and the original step-by-step inversion method assuming that the parameters of the constitutive model vary with construction periods are introduced and verified in this work. Then, both methods are applied in the inversion analysis of a high gravelly soil core rock-fill dam during construction periods. Moreover, the relationship between the inversed material parameters and the stress values of the core wall is discussed. The material parameters are further optimized to obtain more accurate displacement values. The results show that the step-by-step inversion method has a higher accuracy in vertical compression values compared with the conventional inversion method, the trend of material parameter K is more significant than other parameters, and the proposed variable parameter constitutive model has an accuracy between the step-by-step and conventional inversion methods. Conclusions can be drawn that the original step-by-step inversion method has more advantages than the conventional method and the variable parameter constitutive model proposed in this paper might be more suitable for the analysis of a high earth-rockfill dam during construction periods.

Details

Title
The Inversion Analysis and Material Parameter Optimization of a High Earth-Rockfill Dam during Construction Periods
Author
Pan, Shiyang 1 ; Li, Tongchun 2 ; Shi, Guicai 1 ; Cui, Zhen 1   VIAFID ORCID Logo  ; Zhang, Hanjing 1 ; Li, Yuan 2 

 School of Civil and Architectural Engineering, Changzhou Institute of Technology, Changzhou 213032, China; [email protected] (G.S.); [email protected] (Z.C.); [email protected] (H.Z.) 
 College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China; [email protected] 
First page
4991
Publication year
2022
Publication date
2022
Publisher
MDPI AG
e-ISSN
20763417
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2670085266
Copyright
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.