Full Text

Turn on search term navigation

© 2020. This work is published under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

One of the most hazardous fields of engineering is mining operations and accordingly, it requires extra consideration on risk evaluation. Decorative stone quarrying is one of the main branches of the mining industry in Iran. Currently, Iran, China and Italy are known as the three main producers of decorative stones in the world. Subsequently, risk assessment is one of the main steps of quarrying organization. One of the main steps of risk assessment is Risk Breakdown Structure (RBS). In order to achieve this goal, a comprehensive structure of dimensional stone quarrying is modelled in this research and divided into 17 main levels. One of the most useful procedures of risk ranking is Multi attribute decisionmaking methods which state that they have numerous affecting parameters. In the next step of this study, the main hazards of main decorative stone quarrying are assessed by implementing the 'Preference Ranking Organization Method for Enrichment Evaluation' (PROMETHEE) technique. As a final point, Economical, Management, and Schedule risks are determined as the most intimidating hazards in this field.

Alternate abstract:

Jedna od najopasnijih inženjerskih aktivnosti jesu rudarske operacije koje stoga zahtijevaju dodatne procjene rizika. Vaðenje ukrasnoga kamena jedna je od glavnih rudarskih grana u Iranu. Trenutačno su Iran, Kina i Italija tri glavna proizvoðača takva kamena u svijetu. Procjena rizika meðu temeljnim je aktivnostima kamenoloma. Jedan od glavnih postupaka toga procesa jest procjena rizika loma strukture (RLS). S tim ciljem modelirane su makrostrukure arhitektonsko-graðevnoga kamena te su podijeljene u 17 razina. Jedan od najboljih postupaka za rangiranje rizika jest višeatributna metoda donošenja odluka koja povezuje brojne zavisne parametre. Nadalje, ocijenjeni su glavni rizici u najvećim kamenolomima uporabom metode preferirajućega rangiranja za poboljšanu procjenu (MPRPP). Na kraju su izračunani ekonomski rizik te rizici upravljanja i planiranja, koji ujedno imaju najveći utjecaj na opisane aktivnosti.

Details

Title
Investigating a comprehensive model for evaluating occupational and environmental risks of dimensional stone mining
Author
Yari, Mojtaba 1 ; Bagherpour, Raheb 1 ; Khoshouei, Mehrbod 1 ; Pedram, Hossein 1 

 Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran 
Pages
101-109
Section
Original scientific paper
Publication year
2020
Publication date
2020
Publisher
University of Zagreb
ISSN
03534529
e-ISSN
18490409
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2385401983
Copyright
© 2020. This work is published under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.