It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Air Jet Loom (AJL) is a critical machine in textile industries, used to convert thread into fabric. This research used a leading textile company in Yogyakarta as a case study. Preliminary observation in the case study showed that the AJL machine had a high downtime that affects the overall production process. This study aimed to identify critical components of AJL machine and designed maintenance system for AJL machine to reduce downtime. Reliability centered maintenance (RCM) method was used in designing maintenance system by focusing on improving machine reliability. The study began with the identification of critical components of AJL machine using a fishbone diagram and continued with pareto diagram. For each critical component, time between failure (TBF) data was collected. The collected TBF data was then used to calculate the level of reliability and maintenance schedule. The results found that there were six critical components of AJL machine, i.e., VPM, take up, insertion, kamran, oil circulation, and leno. The preventive maintenance scheduling interval for the six components was VPM 120 hours, belt take up 144 hours, insertion 72 hours, kamran 24 hours, oil circulation 144 hours and leno 96 hours. The proposed preventive maintenance schedule on the six critical components of AJL machine was able to reduce downtime by 30% and increase fabric production by 13%.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Industrial Engineering Program, Faculty of Industrial Technology, Universitas Islam Indonesia, Jalan Kaliurang Km. 14.5 Phone (0274) 895287 Yogyakarta 55584