- Preview Available
- Scholarly Journal
Petri Nets for Project Management and Resource Levelling
Jeetendra, V A; Krishnaiah Chetty, O V; J Prashanth Reddy.
The International Journal of Advanced Manufacturing Technology; Heidelberg Vol. 16, Iss. 7, (Jun 2000): 516-520.
DOI:10.1007/s001700070059
This is a limited preview of the full PDF
Try and log in through your library or institution to see if they have access.