1. Introduction
As one of the most extreme weather, the ice disaster will pose a great threat to the safe and stable operation of the distribution network [1,2]. There have been a lot of work about transmission line and distribution line in icing weather. Ice accretion can cause faults such as line breaking, tower falling, line dancing, insulator flashover [3,4]. In [5], a simple ice-heating equation for ice-covered surface was established to reveal the relationship between ice coating and thermodynamics of transmission lines. All of the above works have studied the influence of the external environment on the line failure rate. In addition, the instability of the internal operating conditions of the distribution network caused by the extreme disaster environment is also an important cause of failure [6].
The distribution network safety assessment methods mainly include reliability assessment and risk assessment [7,8,9,10]. The reliability assessment is to verify whether the power system facilities or grid structure meet the specified reliability criteria, which is mostly used for grid planning. The evaluation method based on dynamic risk theory can evaluate the operation status of the distribution network in real time and analyze the vulnerable links, so it has superiority compared with reliability analysis. In the past, most of the distribution network risk assessment models were based on the product of the probability of failure and the severity of the consequences [11,12] instead of more reasonable evaluation models, and there is not formed a perfect risk assessment evaluation index system of the ADN in the ice weather yet. In [13], a model based on ice faults in clusters was proposed which introduced some vulnerability indexes to analyze the risk of future ice storms.
Furthermore, related research on distribution network fault recovery strategies is also common. However, to date, most of them focus on the method of repair and the post-disaster recovery process after the accident [14,15,16], there is a lack of active defense strategy based on fault prediction. Some relevant ideas and technical analysis of security defense were proposed in [17,18,19,20]. One method is the strategy based on DC ice-melting technology in icing weather, which is difficult to guarantee efficiency because it is only applicable to transmission lines or fault areas with ice melting devices but no effective defense and protection for loads outside the fault region. The other method is use matching plans as a method based on historical data and typical situations, this model cannot meet the requirements of real-time online decision-making, the information utilization is very low, and there is a lack of coordinated ability for the local and global distribution network by using the defense strategy, which cannot guarantee efficient use of resources and the maximum power supply.
Therefore, in order to improve the adaptability of active distribution network in ice weather, the main contributions are introduced from three aspects in this paper:
- The multisource situational awareness method is used to analyze the internal operation situation of the distribution network in this paper, define the network topology situation, the power supply situation, the defense resource, the power flow situation, and cascading fault factor, thus the comprehensive vulnerability rate model is established.
- An ice hazard dynamic risk assessment index system concluding the ice-covered dynamic intrusion index, ice disaster-resistance capability index and demand response potential index is proposed in this paper so that it can monitor the current operating status of the distribution network in real time. In order to evaluate the risk status of different distribution lines at a certain moment and determine whether a certain line needs to take active defense plan at the current moment, the concept of risk threshold is proposed in this paper.
- Making full use of the transfer capacity of the tie-lines and the flexible controllability of distributed energy such distributed generations (DGs) and energy storage system (ESS), an evolutionary process of coordinated active defense strategy (CADS) based on fault prediction which involves load transfer with DGs connected in active distribution network (ADN), island operation, and load shedding is established in this paper. The minimum amount of load shedding is considered as an optimization goal while considering various constraints, the active defense scheme is more realistic and the practicality of the active defense strategy is improved.
The rest of this paper is organized as follows. Section 2 is the vulnerability analysis of distribution network based on fault pre-judgment. Section 3 is a multi-angle dynamic risk assessment model. Section 4 conducts research on active defense strategies (CADS). Analysis and simulations were performed in the paper in Section 5. Section 6 summarizes the paper.
2. The Comprehensive Vulnerability Rate Model 2.1. Ice Accretion Model
The ice weight model can be obtained in [21], as shown in Equation (1). The modified ice accretion model is obtained by considering the collision coefficientα1jand the freezing coefficientβj, as shown in Equation (3):
Mj = ∫0l[4πR(t)(1 + Ca VaVj(t)R)−1 Vj(t)Wj(t)C1sinθ1sinθ2]dt
Wj(t) = 0.067ρ0 Sj (t)0.846
ΔR(t) = 0.0351 + 21.65Vj(t)Dj(t)α1j βj(ρ0 Sj(t))2+ (3.6Vj(t)Wj(t))2
whereSj(t)is the rainfall in one hour, the unit is mm/h.Wj(t)is the average water content per cubic meter in the air.Vj(t)is the average wind speed. The diameter of the supercooled water droplet isDj(t). The ice constant isCa.Vais viscosity of air movement.C1is the collection coefficient. The angle between the raindrop and distribution lines is set asθ1, and the angle between wind and distribution lines asθ2.R is the radius of the distribution line in meters.ρ0 is the density of freezing rain or supercooled water, the unit iskg/m3.
2.2. Ice Accretion Failure Rate Model
Calculating different types of failure rates is the primary step in risk assessment. Fault events based on icing weather are mainly mechanical faults and electrical faults, which consist of five events: no event(Y1), distribution line disconnection(Y2), inverted tower(Y3), distribution line dancing(Y4), and insulator flashover(Y5) . The fault rate in ice weather is conditional probability. The probability of different events is calculated according to parameters such as ice accretion condition, wind load, critical voltage of insulator, and actual running voltage combined with the difference between the parameters of the lines and the micro-topography and micro-meteorology [22]. The 66 kV overhead distribution line is taken as the research object in this paper. The probability of the icing events can be formulated as:
Pkt(Yi) = 1 − ∏j=1z(1 − Pkjt(Yi)) i = 2,3,4,5
SetZis the span of the distribution line, the probability of no fault event, line disconnection event, inverted tower event, line dancing event, and ice flashover event of the distribution linekisPkt(Y1),Pkt(Y2),Pkt(Y3),Pkt(Y4),Pkt(Y5), thenPkt(Y1)can be calculated by the following formula:
Pkt(Y1) = 1 − ∑a=25Pkt(Yi)
Finally, the definition of “faults directly related to icing events” is eventX, according to the full probability formula, the ice failure rate of the distribution line as follows:
Pkt(X) = ∑a=15P(X|Yi)⋅Pkt(Yi)
These events are not only related to the ice accretion condition of the line, but also involve complex analysis processes such as mechanics, meteorology and aerodynamics. In the calculation, a large amount of measurement data, grid component design parameters, state parameters, etc. are required. At the same time, it is limited by the distribution network related monitoring system. Therefore, a simplified calculation based on the existing reference and actual conditions is used in this paper. See Appendix A for details.
2.3. Multisource Situational Awareness Analysis The failure rate of distribution line under ice disaster is not only a model which changes with ice accretion condition, but also closely related to various status information of the distribution network such as network topology, power supply equipment, and network defense resources. Therefore, collecting various data about the internal operating conditions and performing fusion analysis in the ice weather can more accurately analyze and predict the vulnerable links of the distribution network, thus significantly improve the early warning capability of the risk.
2.3.1. Network Topology Situation
This indicator reflects the importance of the distribution line in the distribution network topology. The power supply in the area is set asc1, the number of loads on distribution linekis set asc2, the total loads in the area is set asc3,Zkis the impedance of the distribution linek, andNstis the optimal numbers of paths from powerSto loadT,Nst(k)is the number of times the optimal path between the power supplySand the loadTpasses through the distribution linek.ηk,1tis the network topology situation, which is used to describe the contribution of the distribution line to the power flow in the whole network.
ηk,1t = Zk⋅∑c1[∑c2 Nst(k)]∑c1[∑c3 Nst]
2.3.2. Power Supply Situation
This indicator reflects the impact of power supply equipment on distribution line operation. Power distribution equipment includes conventional power supply equipment and various types of distributed energy equipment. The external environment has different effects on their operation.
(1) Conventional power supply
As the period increases, the failure rate and the power supply risk that most of the conventional power components such as transformers are also increased. The failure rate of a power component is described by Weibull function, as shown in Figure 1. If the equipment maintenance interval isΔtin the loss period, and the failure rate after maintenance is reduced fromλitoμitimes the basic failure rate, the equipment failure rateλzis:
λz = μi λL + β2iτ2iβ2i(t − ti)β2i−1
whereτ2iis the scale parameter.β2iis the shape parameter, which indicate the influence of the repair on the basic failure rate and the aging of the component.
Thus, the power supply index (PSI) of the conventional power supply system is:
λk = ∑m=1,⋯,a1,k|εm.g|λm.z∑m=1,⋯,b1 λm.z + ∑m=1,⋯,b2 Pm.dg+ ∑m=1,⋯,b3 Pm.ess
(2) Distributed generations (DGs)
Icing weather has a great impact on the output of distributed power, the wind power DG and the photovoltaic power output model is as follows:
Pf(v) = {0v≤vqPrvr−vqv−Prvr−vqvqvq<v<vrPrvr<v<vr0v≥vt
Pph = A⋅S⋅ϕ⋅η0[1 − 0.005⋅(T − 25)]
wherePr is power rated of the wind turbine.vris the rated wind speed.vqis the cut-in wind speed.vtis the cut-out wind speed.Ais the number of photovoltaic panels.Sis the area of a single photovoltaic panel.ϕis the solar radiation intensity.η0is the photoelectric conversion efficiency under standard test conditions.Tis the ambient temperature, the unit is °C.
Thus the power supply index (PSI) of DGs is:
δk = ∑m=1,⋯,a2,k|εm.dg|Pm.dg∑m=1,⋯,b1 λm.z+ ∑m=1,⋯,b2 Pm.dg+ ∑m=1,⋯,b3 Pm.ess
(3) Energy storage system (ESS)
It is assumed that the ESS does not participate in power supply when it is connected to ADN, so only the power supply situation of the ESS in the island is considered in this paper. When the faults occur in the ADN, the area that is powered by the backup power supply (BPS) is called an island. With the development of ESS technology, it plays a more important role in the ADN. Therefore, this paper argues that the BPS consists of the ESS and DGs. Among them, the BPS in the island may include multiple ESSs and DGs. The model of ESS is as follows and constraints of ESS divided into state of charge (SOC) constraints, maximum charge, and discharge constraints.
{Ej,batt+1=Ej,batt+Pj,cht ηchT−Pj,distTηdisEj,bat,max×20%≤Ej,batt+1≤Ej,bat,max×90%Ej,bat,max×20%≤Ej,batt≤Ej,bat,max×90% t∈[2,NT]0≤Pj,dist≤Dj,dist Pj,dis,maxt0≤Pj,cht≤Dj,cht Pj,ch,maxtDj,dist+Dj,cht≤1∀t∈[1,NT],∀j∈[1,Nbus]
where,Ej,batt+1is the remaining capacity of the nodejenergy storage device at the end of the period oft+1.Pj,chtandPj,distrepresent the charge and discharge power of the ESS in the periodt, respectively.ηchandηdisare charge and discharge efficiency.Ej,bat,maxindicates the maximum capacity of the ESS.Pj,ch,maxtandPj,dis,maxtare the maximum charge and discharge powers of the nodejin the ESS.Dis a 0–1 variable andDj,chtandDj,distindicate the state of charge and discharge at timet.Tis the duration of a risk assessment.NTis the total number of risk assessment time intervals.Nbusis the number of nodes in the ADN.
Then the power supply index (PSI) of the distributed ESS for distribution linekis:
γk = ∑m=1,⋯,a3,k|εm.ess|Pm.ess∑m=1,⋯,b1 λm.z + ∑m=1,⋯,b2 Pm.dg + ∑m=1,⋯,b3 Pm.ess
In order to distinguish the influence of the different power supply equipment status on the operation of the distribution lines, the power contribution tracking coefficient of the transformer, wind power photovoltaic equipment and energy storage device to the distribution lines can be obtained by the power flow tracking, which areεm.g,εm.dg, εm.essrespectively. The number of transformers, wind power photovoltaic equipment and distributed energy storage devices on the distribution line area1,k, a2,k,a3,krespectively. The number of transformers, wind power photovoltaic equipment, and distributed energy storage devices in the distribution network area areb1,b2,b3respectively. Then the power supply equipment risk situation index of the line can be expressed as:
ηk,2t = 1 − (τ1·λk + τ2·δk + τ3·γk)
whereτ1,τ2, andτ3are the weight.
2.3.3. Defense Resources
This indicator reflects the defense capabilities of the defense resources of the distribution network, including staffing of emergency repair, emergency equipment resources (including emergency vehicles, lifting equipment, safety equipment, etc.). Suppose a defense resource owned by a distribution line isu,Utis the real-time available defense resources in the distribution network. The user’s power protection level on the distribution line is w, the value is set to 4 levels from high to low according to the importance level, which is expressed as1 ≥ w1 > w2 > w3 > w4 ≥ 0. The defense resources situation index of the distribution line is:
ηk,3t = w1 + 0.25ukt
∑i=1mukt = Ut
2.3.4. Power Flow Situation
Distribution line faults in the icing weather may cause redistribution of the power flow which cause some components to exit. In the distribution system, the line failure rate has the following relationship with the power flow [23]:
ηk,4t = {P0t0≤l≤LnorP0t+(1−P0t)(l−Lnor)Lmax−LnorLnor≤l≤Lmax1l≥Lmax
The model shows that if the active power does not reach the rated capacity, the line runs normally, and the possibility of line fault is stable at a small probability valueP0t. If the active power is between the rated capacity and the maximum capacity, the probability of failure shows a linear growth trend,Lnoris the rating power of the distribution line,Lmaxis the power limit of the distribution line. If the active power exceeds the limit of the line transmission, the failure rate is 1.
2.3.5. Cascading Faults Factor
The cascading faults of the distribution line in the ice weather is related to the influence of the power flow. The power flow disturbance will make some distribution lines in the self-organized critical state under certain conditions [24], according to the theory of complex systems. It is easy to cause cascading faults when the power system is in a self-organized critical state. The criteria for judging a critical line is as follows:
H = |Li|/Li,max∑I|Pli|/∑I Pli,max ≥ α
∑I|Pli|ϵ(0.56 − 1.00)∑IPli,max
whereHis the critical coefficient,Li,maxis the rated power,Liis the actual power,Pliis the active power flow of the branch,Pli,maxis the rated active transmission capacity of the branch, I is composed of all lines and transformers set,αis the critical reference coefficient which the empirical value is generally 1.05.
Let the total number of lines in the area beN, and the chain failure propagation degree of the long-distance connection linekis defined as:
gk = Ncount ∑y=1,⋯,sf(k,y)Ncount ∑i=1,⋯,Nk
where Ncountis the counting function.Ncount∑y=1,⋯,sf(k,y)is the correlation between distribution linekand distribution liney. Ifkfails,y also fails, meaning they are related [25],f(k,y) = 1, otherwisef(k,y) = 0.Ncount∑i=1,⋯,Nkis the number of all distribution lines associated with distribution linek.
Define the average failure rate of the ice disaster isRax = n2/na2, then cascading faults situation index of the distribution linekthat considering the power flow disturbance is as follows:
ηk,5t = Rax⋅gk
Any extreme situation index value may cause distribution fault. In order to meet the actual situation, standard deviation is proposed in this paper to jointly describe the impact of the internal operating situation on the failure rate of the distribution network. Thus, use Equation (22) to determine the number of useful situation indicatorsNfromηk,it∈{ηk,1t,ηk,2t,ηk,3t,ηk,4t,ηk,5t}. The initial value ofNis 5.σ0is critical value of the standard deviation. Ifσ>σ0, the smallest indicator is ignored and the value ofNdecreases by 1. Repeat the verification by Equation (22) untilσ ≤ σ0and determine the value ofN. Finally, the internal operation situation factorsηk,sitt can be calculated by using Equation (23).
σ = 1N∑i=1N(ηk,it−ηkt¯)2
ηk,sitt = exp[∑i=1Nθiln ηk,it]
whereθiindicates the index weight,∑ θi = 1.
2.4. Comprehensive Vulnerability Rate
It is assumed that the distribution line failure rate directly affected by ice accretion and the internal operation situation factors are two independent parts, thus the comprehensive vulnerability rate model under the ADN in the ice weather is:
F(k,t) = 1 − (1 − Pkt(X))(1 − ηk,sitt)
3. Multi-Angle Dynamic Risk Assessment
Risk assessment is an important basis for the active defense of the distribution network. According to the severity of the risk assessment, the dispatching department can determine the corresponding emergency measures. This paper attempts to construct a multi-angle risk assessment index system through three aspects: ice-covered dynamic intrusion index, ice disaster-resistance capability index and demand response potential index [26,27]. Among them, ice-covered dynamic intrusion index reflects the ice-covered degree and the development trend of the ice disaster of the distribution network. Ice disaster-resistance capability index reflects the anti-interference ability of the distribution line under the current environmental conditions. Demand response potential index can be understood as the defense capability of the distribution network, including the defend resources and the ability to melt ice and deicing. The multi-angle risk assessment index system of the ADN in the ice weather is shown in Figure 2.
3.1. Ice-Covered Dynamic Intrusion Index
It includes three aspects: ice accretion prediction index, estimated fault time, and distribution line breaking factor, which attempt to describe the state of distribution network from ice weather. With the changes of micro-meteorological parameters such as precipitation, wind speed, temperature, and wind direction, each predicted value will gradually become the old data. Hence, there is an error between the actual ice accretion valueRr(ti−1)and the ice accretion prediction valueRr(ti−1)at the previous moment. The ice accretion prediction modelR(ti)in the next moment can be corrected by using the ice accretion prediction value matching indexδ(ti−1)at the previous moment. Then the predicted ice accretion at timetcan be calculated according to the following formula:
δ(ti−1) = R(ti−1)Rr(ti−1) × 100%
R(ti) = Rr(ti−1) + ∫ti−1tiΔR(t)δ(ti−1)dt
Additionally, if no defensive strategy can be taken in icing weather, it makes it possible to cause fault after some time. Hence estimated fault time is as follows:
Tfault = 1[|0.133Rdl − 0.011| × υ0]
whereRis the predicted value of ice thickness,dlis the design value of distribution line ice thickness, andυ0is the influence factor of line length.
Assume the predicted ice weight value isM(t1),Mi(t2)…Mi(tn)in the whole process, setF1andF2are the wind load caused by the horizontal and vertical winds.Gis the self-heavy load of the distribution line, thus the predicted value of total loadHcan be calculated by the following formula:
H = [(M + F2 + G)2 + F12]12
Due to the maximum stress that can be withstood by each distribution line is not the same, set the break factorϕ:
ϕ = HNmax
3.2. Ice Disaster-Resistance Capability Index
According to network topology situation from Section 2.3 combined with the comprehensive vulnerability rate from Section 2.4, the ice disaster-resistance capability can be evaluated by power flow overrun indexra, over-voltage risk indexrb, low-voltage risk indexrc, load reduction probabilityξ(k,t), and expected power shortageC(k,t):
{ra = ηk,4t⋅|Lt,k − Lt,oLt,o × ηk,1t|rb = F(k,t)∑j(Ut,j − Ut,oUt,o × Oj)rc = F(k,t)∑j(Ut,u − Ut,jUt,u × Oj)
whereLt,iis the power flow of the distribution linekat timet.Lt,ois the power flow limit of the distribution linek.Ut,jis voltage of the nodejat timet.Ut,oand Ut,uare the upper and lower limits of voltage at timet.Ojis the importance index of the nodej.
ξ(k,t) = ∑c=1ptiTF(k,ti)⋅ηk,1t
C(k,t) = ∑c=1pti⋅exp[F(k,ti)]⋅ηk,1t
whereTis the duration of the entire ice weather, andtiis a period in which under different power flow and demand of loads.
3.3. Demand Response Potential Index
Demand response potential index includes resource support capabilitye1, tie-line transfer capabilitye2, distributed energy penetratione3, DGs output volatilitye4, ice melting equipment ratee5, and deicing ratee6, as provided in Equation (33).
{e1 = Ei∑c Ej × 100%e2 = ∑Ii∑c Ij × 100%e3 = ∑Pres(t)PL(t) × 100%e4 = ∑i=1n{Pres[(i+1)×ΔT]−Pres(i×ΔT)}2nPres* × 100%e5 = qi∑c qj × 100%e6 = ∑wi,s×μs∑c qj × 100%
In the formulas:Eiis the number of resources allocated to the distribution line.∑CEjis the total amount of resources in the region.∑ Iiis the number of the tie-lines that can be transferred for the distribution line.Pres(t)is the actual output of the distributed energy power supply connected to the distribution network.PL(t)is the actual loads value of the distribution network.ΔTis the reference time interval.iis the number of reference time intervals corresponding to this moment.nis the total number of all-day intervals.Pres(i × ΔT)is the actual output of the distributed energy at previous moment.Pres[(i + 1) × ΔT]is the actual output of the distributed energy in next moment.Pres*is the distributed energy rated power in the network.qiis the number of ice melting devices on the distribution line.wi,sis the deicing deviceSof the distribution line.μsis the action coefficient of the deicing deviceS.
3.4. Dynamic Risk Assessment Model
In order to measure the whole operating state of the system comprehensively and improve the evaluation sensitivity of the network security situation, it is necessary to integrate the various sub-indicators to establish a dynamic risk assessment model. Analytic hierarchy process (AHP) is a comprehensive decision-making method for solving multi-objective problems. It belongs to subjective evaluation method. The entropy weight method (EWM) is an objective evaluation method based on information entropy principle, which belongs to objective evaluation method. In this paper, the analytic hierarchy process-entropy weight method (AHP-EWM) [28] is proposed based on the advantages of these two methods, which makes up for the shortcomings of the single method and improves the accuracy of the risk evaluation index weights. In order to make the weight deviation of these two methods small, a least squares optimization combination weight model is proposed in this paper. Assume that the weights of the indicators obtained by the analytic hierarchy process and the entropy weight method areωjandφj, the model is established as follows:
{min F(μ) = ∑i=1m∑j=1n{[(ωj − μj)sij]2 + [(φj − μj)sij]2}∑j=1nμj = 1, μj ≥ 0(j = 1,2,…,n)
The comprehensive weight valueμjof each index can be obtained by using the Lagrange multiplier method.skjtis thej-th index value of the distribution linekat timet. Then the risk assessment model based on the comprehensive weights is as follows:
Lt = [μ1,μ2,…,μn] × [s11ts12t…s1nts21ts22t…s2nt…………sm1tsm2t…smnt]T
3.5. Risk Threshold
As an important evaluation standard for distribution network risk assessment, the risk threshold plays an important role in the distribution risk judgment of abnormal. The operating status of the ADN can be divided into three categories, namely: normal operation status, risk warning status, and fault status. The critical value between the normal operating status and the risk warning status is called the risk threshold. If the current operational risk value is less than the threshold, the distribution network is in normal operation. If the risk value is greater than the threshold which makes the frequency of operation of the distribution network is abnormal, the voltage exceeds the limit and the power is insufficient, it indicates that the line is at high-risk state and the defense strategy must be taken to prevent the risk expanding and ensure the continuous power supply of the important load to the maximum extent. The risk threshold for the distribution line is as follows:
Vk = (1 − ηk,1t∑s ηi,1t) × V0
whereVkis the risk threshold of the distribution line.V0is the standard threshold of the distribution line, which generally between 0.55–0.6. IfRk > Vk, it means that risk value of the distribution linekis in the risk warning status.
4. CADS The research object of active defense is the high-risk power loss areas outside the fault areas. The purpose of active defense is to protect important loads as much as possible and prevent the expansion of power loss areas. Based on the risk assessment, the minimum load removal is set as the objective function in this paper, combined with the constraints of limited resources, the CADS which contains islands, load transfer with DGs connected in ADN and load shedding is established. 4.1. Load Transfer with DGs Connected in ADN
In this paper, the load transfer is a power supply protection strategy based on fault pre-judgment. It is effective to avoid the accident expansion and reduce the loss of loads by changing the states of switches when the distribution line is in an abnormal situation. At the same time, the contribution of distributed energy to the active defense mechanism should be considered. Hence, the DGs can be used when the loads of the to-be-transferred is greater than the capacity of the tie-line because the cost of switch operation of this scheme is usually less than island mode [29,30]. However, it is must be satisfied that the power flow direction of DG and the tie-line are same, otherwise the island mode is considered. Therefore, the goal of the load transfer with DGs connected in ADN is:
{maxPTrans = ∑sPi,tie + PDEminN = min[∑i=1a(1 − Si) + ∑j=1bTj]
where,PTransis the amount of loads which can be transferred by using the strategy.Pi,tieis the capacities of all available tie lines of the distribution line.PDEis the distributed energy which can supply for the distribution line.Nis the number of switching operations,Si = 1is the section switch action,Si = 0is no action.Tj = 1is that the interconnection switch operates during the process, andTj = 0is that no action. Subject to:
{Vi,lowm≤ Vi(t) ≤ Vi,high,∀i,t−Ib,min ≤ Ib(t) ≤ Ib,max,∀b,tgi∈G
Among them, constraint (38) limits the voltage, branch power flow, and distribution network radial. 4.2. Island Operation
When the distribution line is equipped with BPS, it can take the way of isolated islands to ensure the supply of some important loads [31]. The BPS in the island is divided into two types: ESS and DGs. In order to simplify the analysis process, the paper uses one ESS and multiple DGs as examples to analyze the model of the island. Due to the DGs output has the characteristics of randomness and fluctuation, it must rely on ESS to adjust the power balance of the entire island. Therefore, this paper proposes the island model from three steps.
1. The first step determines the feasibility of the island model according to the defense judgment conditions. Due to the field of research in this paper is the defense plan before occur faults, it must be ensured that the island in the defense process is feasible and meaningful. In other words, the island mode fails if the following conditions (1) or (2) are true in the CADS (coordinated active defense strategy).
(1) A high-risk line is directly connected to the root node of the island and the direction of the power flow is from the root node to the high-risk line.
(2)
During the entire active defense process, DGs and ESS are unavailable. That is,Pmis less than the minimum power support capability.
If condition (1) holds, once the high-risk line fails, the nodes downstream of the line cannot be protected by the island and may even bring greater load loss. If condition (2) holds, the BPS cannot provide enough power to the load, it is obviously impossible to use island mode. These conditions will be an important part of the partition of the island.
2. If neither 1 nor 2 is true, the second step is performed which uses the Tree Knapsack Problem (TKP) to determine the initial island range, the goal and constraint of island range is:
{max Pisland = ∑i=1Tn∑j=1NLTi,j × OTi,j × aTi,jaTi,0 = 1aTi,j∈{0,1} j = 1,2,…,naTi,bj ≥ aTi,j
wherePislandis the amount of power that can be supplied by the isolated island.LTi,jis the load size.OTi,jis the load weight.aTi,jis a binary variable which means the state change parameter of the nodejduring the periodTi.aTi,j = 1indicates that the node is in the island andaTi,j = 0indicates that the node is not in the island.aTi,0is root node.aTi,bj ≥ aTi,jis the node connection constraint, which means that if the child node is selected into the island, the parent node must also be selected into the island.
3. According to the initial island range, it is verified whether the island meet the real-time power balance through defense period. Therefore, in the third step, the power balance constraints are used to modify the initial island range to obtain a new island model which load requirements is determined and power balance is satisfied. In order to maintain the power balance in the island, the load power must be determined according to the DGs output prediction curve and charge power constraints, discharge power constraints, and capacity constraints of the ESS. In addition, the islands must also ensure power flow balance, as shown in Equation (38). Finally, the optimal island is established.
As shown in Figure 3, both the load power curve (the solid black line) and DGs curve (the black dotted line) can be predicted whent∈(Ts,Te). The ESS is charging whent∈(Ts,T1)∪ (T2,Te)and discharging whent∈(T1,T2) . The ESS can be considered as a load when it is in the charging state and as a power source when it is in the discharging state. Therefore, the following constraints must be subjected during the entire operation of the island, Table 1 is as follows:
WherePloadis load power,∑ PDGtis actually used output power of the DGs,PchtandPdistare actual charge power and discharge power of the ESS,Pch,maxtandPdis,maxtare maximum charge power and discharge power of the ESS,Pch,mintandPdis,mintare minimum charge power and discharge power of the ESS,Eloadis island load demand.∑ EDGsandEessare the amount of power supplied by DGs and ESS,Eess,minandEess,maxare the maximum capacity of the ESS,Eess,critical is the capacity of the ESS at the critical moment of charge and discharge. Therefore, it can be seen from Figure 3 that yellow dotted lines represent the sum of the maximum charge power of the ESS and load power. The red dotted line indicates the maximum power of the backup power supply (BPS) in island. The blue solid line is actually used DGs output. The purple line is actual discharging power of ESS.
The DGs output and load power will fluctuate over time during the whole defense period which have two scenes appear alternately, thus the ESS energy transfer process of the following two scenes that subject to the constraints of Table 1 need to be analyzed. Please see Appendix B for specific details.
4.3. CADS Evolution Process
The optimization goal of CADS is:
minΔPk,cut = Pk,fur − maxPk,tra
In the formula,Pk,furis the load of the distribution line.ΔPk,cutis the amount of loads shedding.Pk,trais the amount of protected load. Finally, the CADS is carried out according to the following steps, which are briefly described as follows:
(1) Search for high-risk distribution lines and determine the defense order according to the difference between the threshold and the risk value. At the same time, find all available interconnection switches and section switches for the distribution line;
(2) Transfer the load using an interconnection switch. This step attempts to use a interconnection switch to transfer all loads of the distribution line, if it can be achieved, go to step (6), otherwise go to step (3);
(3) Transfer the load by using another interconnection switch. If only one interconnection switch cannot transfer all the loads of the distribution line, this step attempts to use other interconnection switches to transfer the remaining loads of the distribution line. If it can be realized, go to step (6), otherwise go to step (4);
(4) Look for other defense strategies to make up for the shortcomings of a single solution. If the power flow direction of DG and the tie-line are the same, the DG can be used to assist when the loads cannot be completely transferred by the tie-lines, and if there are still no transfer loads, the island mode is used. If the island can be achieved, go to step (5);
(5) If it can achieve complete defense, go to step (7), otherwise go to step (6);
(6) If the ability of the active defense plan is exceeded after the above process, part of the loads must be cut off in order to ensure the safety constraints of the distribution network;
(7) If there are other high-risk lines, go to step (1), otherwise, go to step (8);
(8) Get an active defense evolution plan and release dispatch instructions to the next moment until the end of the disaster;
(9) Determine if the ice disaster is over. If it is not over, go to step (1), otherwise the process end.
The evolution flow chart of the active defense strategy is shown in Figure 4.
According to the coordinated active defense evolution process, it can deal with the group faults risk and reduce the impact of accidents in the ADN. 5. Simulation Analysis In this paper, the distribution network of a city in northeast China is used as a reference area. At 7:00 on 7 November 2018, freezing rain began to appear in the large city. The distribution lines began to trip and overlap at 11:30. After 15:00, the wind speed gradually expanded and the precipitation gradually decreases.
The distribution network of reference area consists of 4 substations (CG substation, Y substation, RB substation, and GZ substation), including a total of 74 nodes and 73 distribution lines with a voltage level of 66 kV, 4 BPS, and 4 tie-lines. Reference region power distribution system node diagram is shown in Figure 5. There are three types of nodes in the reference region power distribution system diagram. The yellow nodes are circuit breaker nodes, the blue nodes are branch nodes which can lead multiple feeders, and the black nodes are ordinary nodes which including load switches and 66/10 kV substation.
This paper selects 8 important distribution lines which are highlighted in red in the Figure 5. The basic information of the 8 lines are shown in Appendix C. Among them, three dedicated lines (DL) DL-A, DL-B, DL-C are used for business hospital and confidentiality, respectively. In addition, these BPSs are installed at nodes 9, 45, 61, and 65. ZL1–ZL4 are 4 tie line switches that used to transfer the loads. Z1–Z4 are switches of BPS which are opened in normally state. There is a segment switch between each two nodes such as Z50. In the normal state, ZL1–ZL4, Z1–Z4 are shown as dotted lines and segment switches are shown as solid lines. Among them, the solid line indicates the switch is closed and the dotted line means the switch is opened.
5.1. Distribution Network Vulnerability Analysis
Select historical data of ice disasters and historical fault data during 2008–2018, and meteorological data including the wind speed, rainfall, angle and other variables is simulated at 12:00. Finally, the predicted values of comprehensive weak rateF(k,t) of each distribution line in ice weather at 13:00 are shown in Table 2.
The result shows:
(1)
It can be seen from Table 2 thatF(9 − 12,t)andF(67 − 68,t)are the highest.η9−12,4t,η67−68,4t,η29−39,4t, andη45−46,4tare greatly affected by the ice weather. The distribution lines 45–46 and 9–12 contain the BPS whichη45−46,2tandη9−12,2tare obviously high.
(2)
As shown in Table 2,ηDL−B,3tandηDL−A,3tare obviously insufficient.η9−12,5t,η67−68,5t, andη29−39,5tare obviously high which indicates that the fault propagation of these three lines degree is large and easy to cause cascading faults. At the same time, distribution lines 67–68 and 29–39 occupy important positions in the topology, soη67−68,1tandη29−39,1tare also high.
(3)
Pkt(X)andηk,sitt are shown in Figure 6. Among them, theP70−71t(X)is the highest, but theF(70 − 71,t)is not the highest. It indicates that the failure rate of the distribution line in the ice disaster is not only affected by the external environment such as ice accretion, but also the internal operation situation of the distribution network is an important factor that affects the stable operation of the distribution line. Therefore, the comprehensive vulnerability rate is more reasonable.
5.2. Risk Assessment Simulation
According to the meteorological data and power flow data at 12:00, combined with other relevant real-time data, a comprehensive risk assessment of the eight distribution lines at 13:00 is carried out. The risk assessment values are shown in Table 3 and the risk assessment value isL =[0.450 0.623 0.329 0.719 0.516 0.522 0.360 0.260] . The comprehensive vulnerability rate and risk values of each distribution line is shown in Figure 7. The three types of risk indicators for each distribution line are shown in Figure 8, as shown by data:
(1)
It can be seen from Figure 7 thatF(k,t)is positively correlated with theLk, and the difference inLkis more obvious thanF(k,t) . The result of Figure 8 is calculated through a standardized process that shows the different impact of these three risk indicators on each distribution line. Therefore, different indicators can obtain a more comprehensive risk prediction result and achieve more accurate analysis of the operating conditions in the distribution network.
(2)
It can be seen from Table 3 thatLDL−A,LDL−B, andLDL−Care smaller than others, which are 0.360, 0.329, and 0.260 respectively. WhileL9−12,L67−68, andL29−39are larger than others which are 0.623, 0.719, and 0.522, respectively. It is necessary to adopt the defense strategy in time because it was verified that these three risk values exceeded the threshold.
(3) It can systematically perceive the status of distribution network in real-time by using the risk assessment method proposed in this paper, and gain valuable time for the staff to take the active defense strategy.
5.3. Defense Strategy Simulation
According to the results of Section 5.1 and Section 5.2, it is shown that the most likely fault locations are lines 9–12, 67–68, and 29–39. If no action is taken, the amount of loads loss will reach 294,320 kW, which will bring huge losses. In order to avoid the impact of the faults on the distribution network, the different strategies are adopted and simulated in this paper for comparison. Figure 9, Figure 10 and Figure 11 are network structures of different defense strategies adopted before these lines fail. Among them, the red nodes represent loads blackout when the line fails, and the defense strategy cannot help them work normally. Yellow nodes indicate that if no strategy is taken, these nodes will also lose power, but the network topology can be changed through defense scheme to ensure the safe and stable operation of the loads. The blue line indicates that the tie line switch and BPS switch are closed.
The network structures with only the load transfer strategy and only the islands strategy are shown in Figure 9 and Figure 10:
As shown in Figure 9, the tie line switches ZL1 and ZL2 are closed, and segment switches Z9, Z29, Z55, and Z58 are opened at the same time. Yellow nodes represent loads that can be transferred. The red nodes represent loads that have not been transferred, and all of these loads will lose power.
It can be seen from Figure 10 that Z1, Z2, and Z3 are closed, so island 1 consists of the BPS 1 and the loads of yellow nodes (9, 10, 11), island 2 consists of the BPS 2 and the loads of yellow nodes (55, 56, 58, 59, 61), island 3 consists of the BPS 3 and the loads of yellow nodes (62, 63, 65, 66, 67). The yellow nodes represent the loads that were incorporated into the island. Red nodes represent loads that have not been included in the island, which means all of these nodes will lose power once the line occurs faults.
The network structure which CADS adopted is shown in Figure 11:
It can be seen from Figure 11 that after closing ZL1, ZL2, Z2, Z3 and opening Z9, Z29, Z64, Z67. When the CADS is adopted, the tie line ZL1 is used to transform nodes 9, 10, and 11, the island is established by the BPS 3 and nodes 62, 63, 65, 66, 67. At the same time, the tie line ZL2 and the BPS 2 cooperate with each other, the DG that connected the ADN and tie line ZL2 are used to defend the risk area.
Compare the results of the three defense strategies, as shown in Table 4.
As shown in Table 4, the number of switch operations is the least when the load transfer strategy is adopted. However, the capacity of the tie-line ZL2 is limited, the loads are transferred to node 61 at most, so the load loss is much larger than the CADS. On the contrary, all nodes can avoid the danger of power failure except 64 if the CADS is used. When the island strategy is adopted, the number of switches operations is more than the load transfer strategy. Furthermore, because of the limited capacity of the BPS 2, there are so many red nodes that cannot be included in the islands in Figure 10. Similarly, the node 64 cannot be protected by the BPS 3, it makes it that the load loss is largest among three strategies.
Through simulation analysis, the advantage of using this strategy is that load loss is minimized. Moreover, the maintenance department can use the ice melting device to melt ice on high-risk lines or use artificial de-icing teams to reduce the risk of these lines. Since the goal of active defense is to pursue the least amount of load loss under certain constraints, the method proposed in this paper is more reasonable in the natural disaster environment. 6. Conclusions In order to improve the safety and stability of ADN under ice weather, a series of research is carried out in this paper from three aspects: fault rates prediction, risk assessment, and active defense. The comprehensive vulnerability rate model is established and the risk assessment system is proposed which improve the ability of monitoring and early warning in the ice weather. Furthermore, the coordinated active defense strategy (CADS) considering risk pre-judging is designed by using the distributed energy and tie-lines. The application of this strategy not only minimizes load loss, but also provides scientific decision-making and reduces the impact of fault in ice weather.
Figure 8. Three types of risk index of each distribution line after standardization.
| Constraints | Charging State | Discharging State |
|---|---|---|
| Island Power Balance | Pload = ∑ PDGt−Pcht | Pload = Pdist + ∑ PDGt |
| Charge and discharge power constraints | Pch,mint < Pcht < Pch,maxt | Pdis,mint < Pdist < Pdis,maxt |
| Island load demand | Eload = ∑ EDGs | Eload = ∑ EDGs + Eess |
| State of charge (SOC) constraints | Eess,min < Eess ≤ Eess,max | 0 < Eess ≤ Eess,critical |
| Lines | Pkt(Y2) | Pkt(Y3) | Pkt(Y4) | Pkt(Y5) | Pkt(X) | ηk,1t | ηk,2t | ηk,3t | ηk,4t | ηk,5t | ηk,sitt | F(k,t) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 45–46 | 0.125 | 0.04 | 0.027 | 0.009 | 0.239 | 0.25 | 0.459 | 0.214 | 0.425 | 0.3 | 0.238 | 0.420 |
| 67–68 | 0.150 | 0.045 | 0.027 | 0.004 | 0.275 | 0.625 | 0.307 | 0.214 | 0.54 | 0.525 | 0.343 | 0.518 |
| DL-B | 0.063 | 0.045 | 0.021 | 0.003 | 0.148 | 1 | 0.18 | 0.539 | 0.18 | 0.05 | 0.096 | 0.230 |
| 9–12 | 0.178 | 0.045 | 0.023 | 0.0096 | 0.265 | 0.325 | 0.395 | 0.388 | 0.74 | 0.5 | 0.364 | 0.534 |
| 70–71 | 0.240 | 0.039 | 0.029 | 0.0091 | 0.343 | 0.25 | 0.231 | 0.257 | 0.27 | 0.175 | 0.163 | 0.450 |
| 29–39 | 0.147 | 0.034 | 0.019 | 0.0037 | 0.223 | 0.375 | 0.325 | 0.366 | 0.45 | 0.47 | 0.311 | 0.465 |
| DL-A | 0.058 | 0.020 | 0.013 | 0.007 | 0.116 | 1 | 0.187 | 0.429 | 0.18 | 0.075 | 0.103 | 0.207 |
| DL-C | 0.071 | 0.039 | 0.015 | 0.005 | 0.138 | 1 | 0.151 | 0.217 | 0.18 | 0.075 | 0.076 | 0.204 |
| Index | Weights | Line 45–46 | Line 67–68 | Line DL-B | Line 9–12 | Line 70–71 | Line 29–39 | Line DL-A | Line DL-C |
|---|---|---|---|---|---|---|---|---|---|
| R(ti) | 0.064 | 10.37 | 18.69 | 5.25 | 20.98 | 17.71 | 13.64 | 7.89 | 7.16 |
| Tfault | 0.056 | 35.86 | 17.44 | 177.2 | 10.28 | 15.93 | 27.88 | 96.85 | 110.74 |
| ϕ | 0.048 | 0.479 | 0.64 | 0.364 | 0.705 | 0.656 | 0.493 | 0.383 | 0.378 |
| ra | 0.076 | 0.0204 | 0.0648 | 0.0216 | 0.077 | 0.015 | 0.038 | 0.027 | 0.025 |
| rb | 0.076 | 8.19 | 16.5 | 3.77 | 20.1 | 5.69 | 14.8 | 4.92 | 4.57 |
| rc | 0.076 | 3.25 | 10.6 | 4.49 | 3.75 | 7.83 | 9.26 | 3.88 | 5.03 |
| ξ(k,t) | 0.096 | 0.025 | 0.052 | 0.046 | 0.043 | 0.027 | 0.047 | 0.041 | 0.041 |
| C(k,t) | 0.096 | 0.091 | 0.169 | 0.252 | 0.136 | 0.094 | 0.159 | 0.246 | 0.245 |
| e1 | 0.078 | 0.0146 | 0.027 | 0.024 | 0.027 | 0.0135 | 0.0405 | 0.0276 | 0.0675 |
| e2 | 0.066 | 0.01 | 0.029 | 0.034 | 0.015 | 0.011 | 0.019 | 0.038 | 0.038 |
| e3 | 0.066 | 0.35 | 0.22 | 0.41 | 0.27 | 0.5 | 0.18 | 0.38 | 0.45 |
| e4 | 0.066 | 0.37 | 0.11 | 0.53 | 0.17 | 0.36 | 0.2 | 0.66 | 0.42 |
| e5 | 0.068 | 0.009 | 0.018 | 0.018 | 0.009 | 0.009 | 0.018 | 0.018 | 0.018 |
| e6 | 0.068 | 0.021 | 0.053 | 0.053 | 0.021 | 0.021 | 0.053 | 0.053 | 0.053 |
| Defense Strategies | Switching Action Process | Number of Switching Operations | Loss of Load (10,000 kW) |
|---|---|---|---|
| no strategy | no | 0 | 29.432 |
| only the load transfer strategy | close ZL1, ZL2; disconnect Z9, Z29, Z55, Z58. | 6 | 16.514 |
| only the island strategy | access Z1, Z2, Z3; disconnect Z9, Z61, Z64, Z67. | 7 | 18.875 |
| coordinated active defense strategy (CADS) | access Z2, Z3; close ZL1, ZL2; disconnect Z9, Z29, Z64, Z67. | 8 | 1.61 |
Author Contributions
X.-R.L. conceived the idea for the manuscript and wrote the manuscript with input from H.W., Q.-Y.S., and P.J. All authors have read and agreed to the published version of the manuscript.
Funding
This work is supported by National Key R&D Program of China under grant (SQ2018YFA0702200).
Conflicts of Interest
The authors declare no conflict of interest.
Appendix A
Assume that the probability of each uncertain event is independent of each other, the full probability formula can be used to calculate thePkt(Y).{Y1,Y2,Y3,Y4,Y5}is defined as a division of the event space set Ω, and define "faults directly related to ice icing" as eventX , as shown in Figure A1.
Figure A1.Schematic diagram of Ω division of ice fault events space.
Figure A1.Schematic diagram of Ω division of ice fault events space.
The distribution line disconnection event and the inverted tower event are inseparable from the stress conditions of the overhead line and the tower. Therefore, it is necessary to perform mechanical analysis on the wire and the corresponding tower. In order to simplify the calculation workload, the distribution line can be regarded as the ideal cable. Therefore, the internal stressσ0can be obtained according to the parabolic formula. The specific calculation process is shown in Equations (A1)-(A7):
F1andF2are the wind load changes caused by the horizontal and vertical wind. The corresponding calculation formulas are shown as:
F1=10-3ρw2V12(2Rdj+D)Lt
F2=10-3ρw2V22(2Rdj-1+D)Lt
In the formula,ρwis the air density value, the unit isg/cm3, which can be obtained from the measured atmospheric pressure.V1andV2represent the horizontal and vertical components of the wind speed, the unit ism/s.Rdjis the thickness of the ice accretion.Dis the radius of the distribution line.
The self-weight loadGof the distribution line is:
G=10-34πD2 Lt ρ1 gn
whereρ1is the density of the line itself, the unit isg/cm3.
Thus, the predicted value of total loadHcan be calculated by the Equation (28), and the total specific loadγof the distribution line is:
γ=H14πD2L
In the formula,Lis the distribution line length, the unit ism.
The line stressσncan be calculated by using the force state equations, which are shown as:
{σn2(σn+A)=BA=Kgn2 l224σm-σm+αE(θn-θm)B=Eγ2 Lt224
In the formula, set the subscriptsmandnare the initial state and current state of the line, respectively. Among them,θnandθmrespectively represent the current temperature of the line and the initial temperature during normal operation.σnandσmrespectively represent the stress that the line is subjected at the current temperature and during normal operation. In addition,Kis the coefficient of elasticity of the line, the unit isN/mm2.αis the coefficient of line temperature expansion. Therefore, the internal stressσ0can be calculated by usingσnfrom the Equation (A5) in the manuscript.
If the heights of the two towers are different, higher towers are subject to greater stress at the distribution line interface, and the high difference angleφshould be considered. The projection distancelmbetween the distribution line at the lowest point of the line and the top of the higher tower on the horizontal plane is:
lm=l2σnγsinφ
The internal stressσ0of the distribution line at the connection of the higher tower is:
σ0=σn+l4σn2γ2tan2φ
After the maximum stress of the distribution line is obtained, the function is used to compare the maximum stressσ0with the distribution line stress upper limitσs, and the probability of the distribution line disconnection event is obtained:
Pkjt(Y2)={0σ0<0Kice eσ0Tice0≤σ0<σs1σs≤σ0
Tice=σsln(1Kice)
In the formula,μ1is the safety factor, which can be taken asμ1= 2.5.Kiceis a constant, which is selected according to statistical data and distribution line fragility.
When the line is covered with ice, the tower may collapse due to ice accretion imbalance stressΔFon the distribution lines exceeding the design upper limit:
ΔF=πnD24σ12+σ22-2σ1 σ2cosθz
The probability of the inverted tower event is:
Pkjt(Y3)={0σ0<0K2 eΔFμ2 FT0≤σ0<σs1σs≤σ0
For distribution line dancing events, the vulnerability of the distribution line and the degree of asymmetry of the section increase with the ice accretion, so the "thickness coefficient of ice accretion"ωis proposed. The formula is as follows:
ω=R40
In summary, the range of line dancing can be simplified to a function only related to ice thicknessR, wind speedV, and angleβ:
z=A˜(1-B˜ωd ωrR)(V-4)sin(θ-45∘)
whereA˜,B˜are the coefficients related to distribution line length, radius, cross-sectional area, etc.
The probability of the distribution line dancing events is:
Pkjt(Y4)={0z<z1z-z1z2-z1z1≤z<z21z≥z2
wherez1,z2mainly depend on the cross-sectional area, the tension level of the length distribution line.
The relationship between the insulator flashover voltageUand the density of the insulator salt before ice accretionρSDD, altitudeH, and ice weightMis:
U=CρSDD-e σ20°C-d (1-H45.1)3.216 (1-M45.1)4.36
whereCis the coefficient related to the insulator type and the quantity.eis the pollution characteristic index.σ20°Cis the conductivity of the water at20°C.dis a characteristic index affected by the conductivity of water. During the icing weather,ρSDDandHare unchanged, thenUis only related to the insulator ice weightM:
U=A¯(1-B¯W)4.36
whereA¯,B¯are the coefficients related to the salt density, elevation, insulator type, insulator quantity, and density of ice.
The probability of insulator flashover event is:
Pkjt(Y5)={0.01U≤U0Kexp(U0-UT)U>U0
whereU0is the reference voltage andK,Tare coefficients.
Appendix B
Scene A: Whent∈(Ts,T1), the output of DGs (black dotted line) is greater than the load power (black solid line), and ESS is in the charging process. Whent∈(T1,T2), the output of DGs is less than the load power demand and ESS is in the discharging process.
Scene B: Whent∈(T2,T3), the output of DGs (black dotted line) is less than the load power (black solid line) and ESS is in the discharging process. Whent∈(T3,Te), the output of DGs is greater than the load power and ESS is in the charging process.
Since the ESS is subject to charge and discharge power constraints and capacity constraints at all times, we try to divide scene A into three different cases to analyze the energy transfer process of ESS.
Case A1: As shown in Figure A2, assuming that the ESS is not fully charged at the start timeTsof scene A, the ESS is charging with the maximum charging power until timetm1and fully charged at that time. Whent∈(tm1,T1) , actual DGs output power curve is indicated by the blue line. There is excess output of DGs that cannot be absorbed by the ESS during the whole charging process, thus a part of the energy is wasted, which is indicated by a shaded part in Figure A2. Whent∈(T1,T2), DGs and ESS jointly supply power to the load. The red dotted line indicates the maximum power of the backup power supply (BPS) in island. The purple line is actual discharging power of ESS.
Figure A2.Case A1.
Figure A2.Case A1.
Case A2: As shown in Figure A3, assuming that the ESS is not fully charged at the start timeTsof scene A, the ESS is charged with the maximum charging power beforetm2. However, because of the output limitations of DGs, ESS failed to charge with maximum power until fully charged at timetm3 . Similarly, the energy which wasted is indicated by a shaded part in Figure A3. Whent∈(T1,T2), DGs and ESS jointly supply power to the load.
Figure A3.Case A2.
Figure A3.Case A2.
Case A3: As shown in Figure A4, assuming that the ESS is not fully charged at the start timeTsof scene A. Due to the output limitations of DGs, ESS failed to charge with maximum power during the whole charging process until fully charged at timetm4 . Similarly, the energy which wasted is indicated by a shaded part in Figure A4. Whent∈(T1,T2), DGs and ESS jointly supply power to the load.
Figure A4.Case A3.
Figure A4.Case A3.
We also try to analyze the energy transfer process of scene B through the three cases.
Case B1: As shown in Figure A5, whent∈(T2,T3), DGs and ESS jointly supply power to the load. BetweenT3andtm5, the ESS is in a charging state but cannot be charged at maximum power because of the limitation of the DGs output until it is fully charged at timetm5 . Similarly, the energy which wasted is indicated by a shaded part in Figure A5.
Figure A5.Case B1.
Figure A5.Case B1.
Case B2: As shown in Figure A6, whent∈(T2,T3), DGs and ESS jointly supply power to the load. BetweenT3andtm6, the ESS is in a charging state but cannot be charged at maximum power because of the limitation of the DGs output. Betweentm6andtm7, due to the ESS maximum charging power constraint, it can only be charged at the maximum power until eventually fully charged attm7. The excess power generated by the DGs is wasted whent∈(tm7,Te).
Figure A6.Case B2.
Figure A6.Case B2.
Case B3: As shown in Figure A7, whent∈(T2,T3), DGs and ESS jointly supply power to the load. BetweenT3andtm6, the ESS is in a charging state but cannot be charged at maximum power because of the limitation of the DGs output. Betweentm6andTe, due to the ESS maximum charging power constraint, it can only be charged at the maximum power. At the end timeTe of scene B, the ESS was still not fully charged. The energy which wasted is indicated by a shaded part in Figure A7.
Figure A7.Case B3.
Figure A7.Case B3.
Appendix C
Table
Table A1.Basic information of typical important user lines.
Table A1.Basic information of typical important user lines.
| Lines | Important User Corresponding Node | Length (m) | Line Type | Wire Cross-Sectional Area (mm2) |
|---|---|---|---|---|
| 45-46 | 45 (confidential A) | 481 | JKLYJ-120 | 120 |
| 67-68 | 67 (confidential B) | 506 | JKLYJ-240 | 240 |
| DL-B | 73 (hospital B) | Dedicated line | ||
| 9-12 | 9 (hospital A) | 278 | JKLYJ-240 | 240 |
| 70-71 | 70 (confidential D) | 215 | JKLYJ-120 | 120 |
| 29-39 | 29 (financial A) | 450 | JKLYJ-150 | 150 |
| DL-A | 72 (business A) | Dedicated line | ||
| DL-C | 74 (confidential C) | Dedicated line | ||
1. Andersson, G.; Donalek, P. Causes of the 2003 major grid blackouts in North America and Europe and recommended means to improve system dynamic performance. IEEE Trans. Power Syst. 2005, 20, 1922-1928.
2. Ruszczak, B.; Tomaszewski, M. Extreme Value Analysis of Wet Snow Loads on Power Lines. IEEE Trans. Power Syst. 2015, 30, 457-462.
3. Hines, P.; Apt, J.; Talukdar, S. Trends in the history of large blackouts in the United States. In Proceedings of the IEEE Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century, Pittsburgh, PA, USA, 20-24 July 2008; pp. 1-8.
4. Kollar, L.E.; Farzaneh, M.; Van Dyke, P. Modeling ice shedding propagation on transmission lines with or without interphase spacers. IEEE Trans. Power Del. 2013, 28, 261-267.
5. Brostrom, E.; Ahlberg, J.; Soder, L. Modelling of Ice Storms and their Impact Applied to a Part of the Swedish Transmission Network. In Proceedings of the IEEE Lausanne Power Tech, Lausanne, Switzerland, 1-5 July 2007.
6. Newman, D.E.; Carreras, B.A.; Lynch, V.E. Exploring complex systems aspects of blackout risk and mitigation. IEEE Trans. Reliab. 2011, 60, 134-143.
7. Kirschen, D.S.; Jayaweera, D. Comparison of risk-based and deterministic security assessments. Gener. Transm. Distrib. IET 2007, 1, 527.
8. Chen, L.; Jing, L.; Jing, C. Research of risk-based security assessment of power system. In Proceedings of the 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Weihai, China, 6-9 July 2011.
9. Pei, C.; Zhang, Z.; Yin, X. Index system and methods for urban power grid operation risk assessment. In Proceedings of the IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC), Xi'an, China, 25-28 October 2016.
10. Pan, Z.; Zhang, Y. Index system and method for structure strength assessment of urban power network. Proc. Chin. Soc. Electr. Eng. 2015, 35, 3999-4005.
11. Li, J.; Chen, L.; Luo, Y.; Zhao, J.; Ma, N. Power system on-line risk assessment and decision support based on weighting fault possibility model. In Proceedings of the International Conference on Transportation, Mechanical, and Electrical Engineering (TMEE), Changchun, China, 16-18 December 2011; pp. 1058-1061.
12. Zhao, T.; Lu, D.; Wang, D.; Zeng, Y.; Liu, Y. A risk assessment approach for power system based on a comprehensive fault probabilistic model. In Proceedings of the 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Changsha, China, 26-29 November 2015; pp. 574-577.
13. Sun, Y.; Wang, X.; Bie, Z.; Wang, X. Characteristics Analysis and Risk Modeling of Ice Flashover Fault in Power Grids. IEEE Trans. Power Deliv. 2012, 27, 1301-1312.
14. Niu, G.; Zhou, L.; Qi, Z. A novel fault self-recovery strategy for distribution network with distributed generation. In Proceedings of the China International Conference on Electricity Distribution (CICED), Xi'an, China, 10-13 August 2016; pp. 1-6.
15. Rao, R.S.; Ravindra, K.; Satish, K. Power loss minimization in distribution system using network reconfiguration in the presence of distributed generation. IEEE Trans. Power Syst. 2013, 28, 317-325.
16. Jazebi, S.; Hadji, M.M.; Naghizadeh, R.A. Distribution network reconfiguration in the presence of harmonic loads: Optimization techniques and analysis. IEEE Trans. Smart Grid 2014, 5, 1929-1937.
17. Lin, Y.; He, J.; Xu, X.; Shan, Z. Research on Fault Recovery Coordination Strategy of Transmission and Distribution Network Based on Multi-Source Data. In Proceedings of the China International Conference on Electricity Distribution (CICED), Tianjin, China, 17-19 September 2018; pp. 1086-1089.
18. Guan, X.; Ma, Y.; Shao, Z.; Zhang, B. Research on Collaborative Defense Model of Power Grid Security. In Proceedings of the 8th International Conference on Electronics Information and Emergency Communication (ICEIEC), Beijing, China, 15-17 June 2018; pp. 270-273.
19. Hu, X.; Tang, W.; Liu, H.; Zhang, D.; Lian, S.; He, Y. Construction of bulk power grid security defense system under the background of AC/DC hybrid EHV transmission system and new energy. In Proceedings of the IECON 2017-43rd Annual Conference of the IEEE Industrial Electronics Society, Beijing, China, 29 October-1 November 2017; pp. 5713-5719.
20. Tang, Y.; Yan, M.; Sha, Q. Security defence system for smart grid. In Proceedings of the 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Weihai, Shandong, China, 6-9 July 2011; pp. 189-193.
21. Chen, L.; Zhang, H.; Wu, Q. A Numerical Approach for Hybrid Simulation of Power System Dynamics Considering Extreme Icing Events. IEEE Trans. Smart Grid 2017, 9, 5038-5046.
22. Yang, H.; Chung, C.Y.; Zhao, J. A Probability Model of Ice Storm Damages to Transmission Facilities. IEEE Trans. Power Deliv. 2013, 28, 557-565.
23. U.S.-Canada Power System Outage Task Force. Final Report on the 14 August 2003 Blackout in the United States and Canada: Causes and Recommendations. Available online: https://www3.epa.gov/region1/npdes/merrimackstation/pdfs/ar/AR-1165.pdf (accessed on 12 October 2019).
24. Karimi, E.; Ebrahimi, A. Inclusion of blackouts risk in probabilistic transmission expansion planning by a multi-objective framework. IEEE Trans. Power Syst. 2015, 30, 2810-2817.
25. Su, D.; Tian, J.; Liu, J. Self-organized criticality analysis of power grids based on electric structure-load entropy. In Proceedings of the International Conference on Power System Technology (POWERCON), Chengdu, China, 20-22 October 2014; pp. 427-432.
26. Lei, J.; Sun, L.; Zhu, Q.; Lu, J. Research on evaluation system of operation risk assessment and application in Henan Power Gird. In Proceedings of the IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC), Hong Kong, China, 7-10 December 2014; pp. 1-5.
27. Xie, M.; Yin, Y.; Lu, E.; Hu, S. Study on human factor risk quantification and evaluation model in power grid dispatching risk assessment. In Proceedings of the China International Conference on Electricity Distribution (CICED), Xi'an, China, 10-13 August 2016; pp. 1-5.
28. Yuan, L.; Dong, R. A Novel Risk Assessment Algorithm for Accounting Information System Using Analytic Hierarchy Process. In Proceedings of the 8th International Conference on Intelligent Computation Technology and Automation (ICICTA), Nanchang, China, 14-15 June 2015; pp. 61-64.
29. Ma, C.; Ling, W.; Wu, J.; Wang, K.; Ding, J. Dynamic Load Transfer of Active Distribution Network Based on Prediction Information. In Proceedings of the China International Conference on Electricity Distribution (CICED), Tianjin, China, 17-19 September 2018; pp. 960-966.
30. Zhang, K.; Liu, K.; Yao, N.; Jia, Y.; Li, W.; Qin, L. The impact of distributed generation and its parallel operation on distribution power grid. In Proceedings of the 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Changsha, China, 26-29 November 2015; pp. 2041-2204.
31. Zhang, H.; Chen, L.; Wang, H.; Zhao, Y.; Chen, L.; Duan, B. Island Partition of Distribution Network with Microgrid and Distributed Generation Based on Floyd-Warshall Algorithm. In Proceedings of the International Conference on Smart Grid and Electrical Automation (ICSGEA), Changsha, China, 9-10 June 2018; pp. 29-33.
Xin-Rui Liu
1,*,
Hao Wang
1,
Qiu-Ye Sun
1 and
Peng Jin
2
1Department of Electrical Engineering, College of Information Science and Engineering, Northeastern University, Shenyang 110819, China
2State Grid Liaoning Electric Power Supply Co. LTD., Shenyang 110003, China
*Author to whom correspondence should be addressed.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
© 2020. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Abstract
With the continuous development of the active distribution network (ADN), the problem of security and stability has become increasingly prominent. From the perspective of improving the defense capability of ADN, a new a multi-angle dynamic risk assessment index system based on the comprehensive vulnerability rate model is proposed in this paper. Risk threshold is used to monitor the status of the distribution network, which determine whether ADN needs to enter the active defense period. The minimum amount of load shedding outside the fault isolation region is regarded as the objective function, considering other constraints such as limited resources, the coordinated active defense strategy (CADS) is formed in this paper. Finally, the accuracy of the comprehensive vulnerability rate and the risk assessment value are verified by example analysis, and the superiority of the CADS is verified by comparing different defense strategies.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer