It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
PT. PMS, a company which has specialization in offshore and onshore services has many equipments to support their service operation. The equipment has been classified into four divisions, Diving, ROV, Cleaning and Painting. The problems observed in PT. PMS warehouse were their disorganized warehouse system which has no fixed layout design. For the purpose of improvement, a new warehouse layout design was proposed in this study to solve the problem. The method of modified Systematic Layout Planning (SLP) has been used to design an efficient warehouse layout. Step by step layout procedure has been done. It consists of Activity Relationship Chart and Activity Relationship Diagram that have been discussed. It is proved from this study that SLP method provides an effective method in layout designing, even in the service company that has many equipments to be stored in an efficient manner.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Industrial Engineering Department, Faculty of Engineering, Bina Nusantara University, Jakarta, Indonesia 11480
2 Professional Engineer Program Department, Faculty of Engineering, Bina Nusantara University, Jakarta, Indonesia 11480