1. Introduction
Belonging to the Guayaquil canton, Guayas province, Ecuador, the rural parish of Puná is a group of more than 30 islands and islets with 35 human settlements, of which 22 are located on the largest island (919 km2), Puná Island. Located in the Gulf of Guayaquil, Puná Island is 3 km off the coast of the Posorja precinct, which is the mainland town closest to the island (see Figure 1). The Universal Transverse Mercator (UTM) coordinate is NS98 and its Joint Operations Graphics grid reference is SA17-11. The time zone of the island is Coordinated Universal Time (UTC)/Greenwich Mean Time (GMT)-5. The geographical coordinates of the points that define the location of the island in its entirety are outlined in Table 1 [1,2].
According to the latest census conducted in 2010, the island has a population of approximately 3344 inhabitants, divided into 22 human settlements or precincts. Only 50.78% of the population has completed primary education, and the illiteracy rate is 11.73%. Although part of the population of Puná Island has access to piped water, the island lacks basic services: drinking water (when necessary, drinking water is transported from the mainland to the island), sewage treatment, a sanitary landfill, a hospital, and access roads in satisfactory conditions. The local electricity company supplies electricity to 66% of the population through three generators with a total power of 2.2 MW, whereas 20% of the inhabitants have their own electric generator. Water pumps used in shrimp ponds are the predominant energy demand of the island, which is met using diesel generators (over 200 HP). Currently, approximately 80% of the population is engaged in activities related to shrimp farming, fishing, forestry, agriculture, and animal husbandry. Other economic activities include tourism, commerce, and construction. Despite the wealth generated from shrimp farming, the economic benefits are not invested in the island because the owners of the shrimp ponds are neither native to nor residents of the island. In addition, oil spills, exhaust gas emissions, garbage, plastic waste washed ashore, domestic sewage discharges, and shrimp farms cause pollution. This environment of unmet needs not only prevents economic growth but also causes migration, in the absence of the necessary conditions for development, thereby aggravating the island’s problems [4,5].
One of the primary factors for the development of towns and their economic growth is the availability of energy resources that supply the electricity necessary for society’s activities in the 21st century [6,7]. Therefore, the main objective of this study is to determine the wind energy potential to generate the electricity Puná Island requires for its sustainable development. Furthermore, this study aims to apply existing knowledge of wind resource assessment in a manner that may be replicated in any location. The remaining manuscript is organized as follows: the method, materials, and costs of this research are described in Section 2; and some theoretical foundations of electricity generation from wind energy are addressed in Section 3. The results from the data analysis using the software Windographer and WAsP are included in Section 4. The study ends with conclusions and recommendations in Section 5.
2. Materials and Methods
In general, based on the experience gained in this research project, the methodology and phases of wind resource assessment studies follow the flowchart of Figure 2, whereas the specific data processing method follows the flowchart presented in [8]. As electricity supply is essential for modern human activities and that wind energy is an increasingly developed alternative worldwide, wind resource assessment is crucial for testing the feasibility of this type of initiative in a specific location. For this purpose, the first step should be to determine whether wind resource assessment studies have already been performed at the site; otherwise, a study with a minimum duration of one year must be conducted.
Whether a study is performed depends on several factors. The economic factor may be the most important because it determines not only whether the study is feasible as well as its magnitude, i.e., its duration, number of anemometer towers to be installed, tower characteristics, and equipment availability [9]. Another key issue to consider is technical and legal feasibility, i.e., whether a site’s conditions make it possible to build and transport a tower, obtaining landowners’ permission to erect a tower and legal requirements for its installation, such as municipal and civil aviation permits.
After ensuring the availability of economic resources, important decisions are required regarding aspects, such as purchasing a prefabricated tower or constructing a tower from scratch. The former alternative is typically expensive, therefore leaving the option to design and build the tower from scratch. In both cases, experienced staff are required. Some system component (sensors and data loggers) options for wind resource assessment are available on the market. Their selection depends on technical characteristics, costs, availability, and warranties, among other factors. In addition to storing records on memory cards, data loggers can send data by email, as long as they have access to the Internet. After installing the tower and initiating the devices, the data logger must be tested to assess whether the data from all installed instruments are recorded and whether the values recorded are within the expected range or abnormal, possibly due to equipment failure or installation problems. Frequent equipment failures are often due to improper wind vane installation or data logger programming or battery discharge. The following measures aim to avoid these setbacks: accurately programming the data logger before installing the device, installing a solar panel large enough to prevent battery discharge, and periodically visiting the tower site to test the conditions of the entire system. After a year of measurements or when a report must be submitted, the data are processed. Thus, depending on the objectives and availability of financial resources, different tools may be used to process information from the data loggers, ranging from desktop applications such as Excel or MATLAB, which are easily accessible programs, to software such as WAsP, Windographer, and windPRO.
For this study, an anemometer tower was installed at coordinates 2°43′58.06″ south by 80°11′56.97″ west (see Figure 3). On the tower, wind vanes were installed at 40 and 20 m, in addition to a thermometer, a barometer, and a relative humidity sensor. All instruments used, including the data logger, were purchased from NRG Systems [9]. All equipment and respective costs are outlined in Table 2, and the design of the tower is presented in Figure 4.
The project requires not only the approval and resources of the sponsoring entities but also the permission of the landowners of the tower site. After installing the equipment and activating the Internet, the data logger records the variables every 10 min and stores hourly means on its memory card. The data logger is configured to send data every day at 07h00 a.m. (Ecuador time) in an email with a report of the measurements from the previous day. According to the standards, the studies on evaluation of wind resources should last a minimum of one year, however, due to the gap between the date of approval by the funding institution and the availability of resources necessary for the study, monitoring could only be performed for nine months. The data collected during this period were analyzed using the software Windographer to determine the following parameters: wind speed variation as a function of time of day and month, wind speed histogram, wind direction (compass rose), theoretical mean power a particular wind turbine model would deliver, and daily and annual energy production depending on the selected wind turbine model. The contour and wind resource maps were drawn using WAsP and Google Earth. 3. Fundamentals of Electricity Production from Wind
For thousands of years, wind has been an important resource from which humans have harnessed the necessary energy to perform various activities such as sailing, grain milling, water pumping, and electricity generation [10]. The energy that can be harnessed from wind is proportional to its speed, which is not affected by terrain conditions at high altitudes. However, in the lower layers of Earth’s atmosphere, wind varies as a function of surface friction or ground surface roughness (affected by vegetation cover and buildings, among other factors). In short, wind speed is proportional to the height above ground. As anemometer towers cannot always be erected at the height at which wind turbines operate, wind speed is extrapolated using functions such as Equation (1), known as the Hellman function or power-law profile and Equation (2), called logarithmic wind profile [11,12].
vv1=(zz1)α,
v=v∗klnzz0,
where:
-
v= wind speed at height z;
-
v1= wind speed at heightz1; and
-
v∗= friction velocity;
-
k= the von Karmann constant;
-
z0= roughness length; and
- α = friction or Hellman coefficient.
As the amount of available wind energy varies as a function of wind speed, which changes constantly, statistical models and probability distributions, such as Gaussian, Rayleigh, and Weibull distributions, are used to quantify the performance of this variable at a specific location over time. The Gaussian or normal distribution is the probability density function that best describes wind variations. This model is represented according to Equation (3), whereas the probability of a specific wind speed at a given interval is provided by Equation (4). In the wind industry, Rayleigh and Weibull are the most commonly used probability distributions [13]. The equations of these models and their respective cumulative distribution functions (probability of a wind speed lower than or equal to a specific value) are presented in Equations (5)–(8) [14,15].
p(v)=1σv2πexp[− (v−v¯)22σv2],
p (va≤v≤vb)=∫vavbp(v)dv,
p(v)1=π2(vv¯2)exp[− π4(vv¯´)2],
F(v)1=1− exp[− π4(vv¯´)2],
p(v)2=(kc)(vc)k−1exp[− (vc)k],
F(v)2=1− exp[− (vc)k],
where:
- v = wind speed;
-
v¯= mean wind speed;
- p(v) = probability density function of wind speed;
-
σv= standard deviation of wind speed;
-
p(v)1= Rayleigh distribution;
-
F(v)1= cumulative distribution function;
-
p(v)2= Weibull distribution;
-
F(v)2= cumulative distribution function;
- k = shape factor; and
- c = scale factor.
The wind power per unit area or wind power density may be determined using Equation (9), whereas the hourly mean is calculated according to Equations (10) and (11). In practice, for increased reliability in predicting the production of wind power using wind turbines, the mean speed determined in our study was not used; instead, the value calculated by applying a correction factor was used. This correction factor is a percentage of the differences between the mean wind speed of our study and those provided by databases with wind speed records from several years [14,15,16]. In this research study, databases such as Modern-Era Retrospective analysis for Research and Applications, Version 2 (MERRA-2) and Climate Forecast System Reanalysis (CFSR2) were used for comparison purposes. The coincidence that exists between the magnitude of the wind speed obtained with the measurements made in this study and the values obtained from the aforementioned databases, in addition to validating the study, allows for more accurate projections.
PA=12ρv3,
P¯A=12ρv¯3 Ke,
Ke=1Nv¯3∑i=1NUi 3,
where:
-
PA= Power per unit area or wind power density (power that can be extracted from the wind by a wind turbine having the rotor swept area A).
- P = power (watts);
- ρ = air density (1.225 kg/m3);
- v = wind speed (m/s);
-
P¯= mean wind power (watts);
-
v¯= annual mean wind speed (m/s);
-
Ke= energy pattern factor;
- N = 8760 hours in a year; and
-
Ui= wind hours available.
For example, assuming that two hours of data were missing daily (it would have only 22 h of wind) and annual mean wind speed is 5 m/s, when replacing values in Equations (9) through (11), a wind power density of 272 watts per square meter is assessed. Conversely, the higher the wind speed and the larger the diameters of the wind turbine blades, the higher the harnessed amount of wind power.
Ke=1(8760)(5)¯3∑i=1365(22)3,
Ke=3.55,
P¯A=12ρV¯3 Ke,
P¯A=12(1225kgm3)(5 m/s)3(3.55),
P¯A=272 watts/m2,
The theoretical energy production of the selected turbines may be calculated using several methods, including [13,14]:
- direct use of the mean data during an interval;
- wind speed data binning (bins);
- construction of a wind power curve using the data; and
- statistical analysis.
Using the first method, the mean power assessed in a wind turbine of a specific powerPwis given by Equation (12), whereas when using probability and statistical methods, the mean wind power is given by Equation (13). The wind power curve may be constructed using the available wind power and the rotor power coefficient Cp, according to Equations (14) and (15). By combining Equations (13) through (15), the mean power of a wind turbine is given by Equation (16), which may be expressed as a function of the cumulative distribution function, according to (18). Replacing Equation (8) in Equation (18) and solving the resulting equation,P¯ may be calculated using the Weibull distribution, according to Equation (19) [14,15].
P¯=1N∑i=1NPw(v),
P¯=∫0∞ Pw(v)p(v)dv,
P(v)=12ρACpηv3,
Cp=Rotor powerWind power=Protor12ρAv3,
P¯=12ρηπR2 ∫0∞ Cp(λ)v3p(v)dv,
λ = Blade tip speedWind speed= ΩRv,
P¯=∫0∞ Pw(v)dF(v),
P¯=∑j=1NB{exp[− ( vj − 1c)k]−exp[− ( vj c)k]Pw(vj−1+ vj2),
where:
-
P(v)= power calculated using the wind turbine power curve as a function of v;
- p(v) = probability distribution of v;
-
CP= rotor power coefficient;
- η = drive train efficiency;
- λ = tip speed ratio;
- Ω = angular speed (radians/sec); and
- R = rotor radius.
4. Results
In wind resource assessment studies, wind variation is analyzed using frequency distributions of wind speed, wind direction (compass rose), wind speed as a function of height, and mean wind speed according to time of day [17]. Based on these and other variables, the appropriate wind turbine for a specific location is designed or selected while determining the optical location for the wind turbine and predicting the power or electricity that may be harnessed. In the following subsections, the records are processed to analyze the wind variation on Puná Island, especially at the anemometer tower site.
4.1. Frequency Distributions
One of the primary characteristics of wind resources is the frequency distribution of different values of wind speed at a given location. For analysis purposes, the speed spectrum is typically divided into different ranges, such as 0.5 or 1 m/s termed bins. The frequency histograms with several frequency distributions of wind speed for Puná Island are presented in Figure 5a,b. The mean wind speed is approximately 4.8 m/s, which reflects a class II wind resource with marginal potential [18]. The lowest values occur from 6 to 7 a.m., after which time wind speed increases again, peaking at 3 and 5 p.m. (see Figure 6). During the study period (9 months), availability was 88%; extrapolating this value to a full year, availability declines to 60%. Wind speed varies similarly at both 40 and 20 m, as shown in Figure 6, which is mathematically corroborated by the correlation between anemometer measurements (see Figure 7).
4.2. Wind Direction
A compass rose is a circle through which the horizon is divided according to the direction of the four cardinal points, typically into 8, 12, or 16 sectors (45, 30, or 22.5 degrees per sector, respectively), upon which the percentage of wind blowing in a specific direction is plotted. A primary use of a compass rose is the determination of the optimal location for a wind turbine. Wind direction as a function of frequency and energy as a function of direction are shown in Figure 8 and Figure 9, respectively, revealing predominantly eastward winds according to the data logger. As we can see in the compass rose of Figure 8, 80% of the highest wind speeds occur within the interval from 67.5° to 112.5°. The same range encompasses approximately 90% of the available wind energy (see Table 3). Wind direction uniformity is beneficial for both the individual production of a wind turbine and the installation of several wind turbines in the case of a wind farm. A comparison of the compass rose results with those provided by the databases MERRA-2 and CFSR2 reveals a 180° difference because, according to the aforementioned databases, the wind blows predominantly westward in the study area. Nevertheless, the mean wind speed of the present study agrees completely with those of the referenced databases.
4.3. Vertical Wind Profile as a Function of Height
The vertical wind profile as a function of height, determined using exponential and logarithmic functions, according to Equations (1) and (2), is presented in Figure 10. Although the wind resources measured at 40 m may be considered scarce, wind speeds reach values of approximately 6 m/s at 80 and 100 m, heights at which most modern wind turbines, whose power can be several MWs, operate. The variation of the exponential coefficient of Hellman’s law, according to the time of day and month, is presented in Figure 11.
4.4. Short-Term Wind Variation, Gusts, and Turbulence
Turbulence peaks in the early hours of the morning (see Figure 12), but the magnitude of this variable is nonsignificant because the wind speed is lower than the values found in areas considered turbulent (see Figure 13). The small values of turbulence occur in the opposite direction to the region where the highest values of wind speed are observed (see Figure 14). No short-term, monthly, or seasonal variations in wind direction were detected. As the maximum value observed during the study period was 8 m/s, no extreme wind speed calculations were made.
4.5. Contour Line Maps, Isotach Maps, and Wind Turbine Siting
A contour line map, isotach map at 120 m and contour lines spaced every 5 m for the entire island, are shown in Figure 15 and Figure 16, respectively. The topographical maps of the site, in which the contour lines and the available measurement device are represented, were obtained using WindPRO 3.2 software (downloaded from SRTM server).
4.6. Wind Turbine Selection and Assessed Wind Power
As the wind resource has a low speed, low-speed wind turbines with considerable diameter sweeps and as high as possible should be used for energy production. The following wind turbine models meet these criteria: Gamesa G126-2.5 MW, Vestas V110-2.0 MW, and Vestas V126-3.3 MW. Considering that a higher power wind turbine equates to a higher power generated at low wind speeds, the last of the aforementioned models was used for the simulation. According to its power curve (see Figure 17), 179 and 711 kW could be generated at 5 and 6 m/s, respectively. According to simulations based on the software results of the gross mean output curve shown in Figure 18, depending on wind speeds and time of day, this wind turbine could generate minimum and maximum powers of 200 and 850 kW, respectively. Table 4 outlines the net power and annual energy production of five wind turbine models. As the diameter and height of the turbine increases, the production of electric power will be improved.
5. Conclusions and Recommendations Several software programs are publicly available for use, as are a significant number of studies on wind resource assessment. Accordingly, in this type of project and especially because the study site was an island, the most complex task is the installation of an anemometer tower. On Puná Island, the low-density wind resource is classified as marginal, with a well-defined variation by time of day and a long-term mean speed of 4.8 m/s. Wind availability peaks in the afternoon hours, and the lowest values occur in the morning hours. Electricity production might be possible; however, due to the low mean wind speed, wind turbines with a considerable blade diameter, equal to or greater than 100 m, would have to be used. Therefore, the power of such turbines would be on the order of megawatts. In this study, the use of the Vestas V126-3.3 MW wind turbine model was simulated. However, this type of wind turbine has an estimated cost of one million US dollars per megawatt, which might limit possible funding.
Based on the mean power assessed in the simulation of this wind turbine model at low wind speed hours (see Figure 5), to generate 2.2 MW, which is currently the power installed on the island, approximately 10 wind turbines would be necessary. An alternative would be to concurrently operate a lesser number of wind turbines with diesel generators that are currently installed on the island, particularly during hours of low wind availability. In addition, because solar radiation peaks during the midday hours and subsequently decreases to zero at night, energy could be generated in the morning using a solar farm, whereas wind turbines would operate in the afternoon, evening, and night. For all alternatives, an accumulator system capable of storing excess wind or solar energy would ideally be coupled to the electrical grid to supply electricity during peak demand hours, maintaining the diesel generators as backup.
The use of wind resources would make it possible to replace not only diesel generators that provide electricity to the island but also a considerable number of stationary engines used for water pumping in shrimp farms. These machines contaminate the island environment not only with CO2 emissions but also with lubricant waste and discarded spare parts. For some of the island’s inhabitants, some of which have no access to electricity due to their distance from the electrical grid or lack of power installed, an alternative would be to install individual wind turbines. This option would also be valid for smaller islands in the area. To complete the research project, a feasibility study should be conducted to determine the following:
- electricity demand of the island;
- wind resources using an 80-m anemometer tower in several locations on the island, especially in the region closest to the Pacific Ocean (Punta Carnero);
- civil engineering considerations (foundations for wind turbines, access roads, electrical grids);
- type of coupling to the wind turbine grid (direct coupling or via accumulators); and
- costs and funding.
Another key initiative would be to promote this study among different institutions to obtain financing for the next phase of the study and perhaps the development of a wind farm. The following institutions could be targeted: The Ministry of Energy, Ministry of the Environment, electric companies, and Guayaquil’s government. Development of a wind farm would not only supply clean and renewable energy to Puná Island but also create a research and training center.
Point | Geographical Coordinates | Point | Geographical Coordinates | ||
---|---|---|---|---|---|
X | Y | X | Y | ||
1 | 571,331.99 | 9,705,877.72 | 6 | 589,765.93 | 9,702,878.50 |
2 | 572,464.23 | 9,705,608.00 | 7 | 585,466.92 | 9,698,762.99 |
3 | 576,440.60 | 9,706,019.36 | 8 | 584,241.35 | 9,694,975.13 |
4 | 578,109.74 | 9,706,338.38 | 9 | 577,967.60 | 9,694,979.36 |
5 | 583,024.35 | 9,707,088.13 | 10 | 577,968.02 | 9,698,883.58 |
ITEM | Number | Unit of Measurement | Unit Value (USD) | Total Value (USD) |
---|---|---|---|---|
Meters of anemometer tower | 40 | meters | 100 | 4000 |
Tower assembly | 1 | overall | 1000 | 1000 |
Construction of the concrete foundation to erect the tower | 4 | units | 250 | 1000 |
Lease of the land where the anemometer tower was installed | 12 | month | 400 | 4800 |
Transportation and food | 1 | overall | 500 | 500 |
Internet for data transmission | 12 | month | 20 | 240 |
Data logger NRG Symphonie Plus 3 | 1 | units | 2000 | 2000 |
Anemometers (WindSensor P2546-OPR) | 2 | units | 381.3 | 762.6 |
Wind vane NRG 200P | 2 | units | 262 | 524 |
Temperature sensor 10S | 1 | units | 250 | 250 |
Barometric pressure sensor BP20 | 1 | units | 402 | 402 |
Relative humidity sensor RH5X | 1 | units | 445 | 445 |
20-Watt solar panel | 1 | units | 50 | 50 |
70-Ah battery | 1 | units | 100 | 100 |
Franklin’s lightning rod | 1 | units | 150 | 150 |
3 × 16 concentric cable | 2 | roll | 60 | 120 |
Electric board | 1 | units | 60 | 60 |
6-mm steel cable | 300 | m | 1 | 300 |
3/4″ turnbuckles | 21 | units | 10 | 210 |
3/4″ ground rod | 70 | units | 1 | 70 |
TOTAL | 16,983.60 |
Sector | Midpoint | Frequency (%) | Mean (m/s) vs. ‘Direction 0 A’ | Proportion of Total Wind Energy (%) | |||
---|---|---|---|---|---|---|---|
Direction 0 A | Direction 0 B | Speed 40 m | Speed 20 m | Speed 40 m | Speed 20 m | ||
1 | 0° | 1.77 | 1.75 | 2.625 | 1.963 | 0.53 | 0.34 |
2 | 22.5° | 2.43 | 2.29 | 2.729 | 1.933 | 0.74 | 0.42 |
3 | 45° | 3.4 | 2.6 | 3.006 | 2.301 | 1.29 | 0.93 |
4 | 67.5° | 21.33 | 5.14 | 4.661 | 4.007 | 24.21 | 24.39 |
5 | 90° | 40.77 | 39.65 | 5.003 | 4.357 | 55.62 | 56.89 |
6 | 112.5° | 13.54 | 25.54 | 4.122 | 3.456 | 10.88 | 9.8 |
7 | 135° | 4.71 | 8.37 | 3.534 | 3.086 | 2.56 | 2.63 |
8 | 157.5° | 2.74 | 3.58 | 2.797 | 2.575 | 0.81 | 1 |
9 | 180° | 1.77 | 2.42 | 2.567 | 2.286 | 0.45 | 0.5 |
10 | 202.5° | 1.63 | 1.81 | 2.866 | 2.681 | 0.51 | 0.64 |
11 | 225° | 1.77 | 1.87 | 3.762 | 3.495 | 1.33 | 1.57 |
12 | 247.5° | 0.61 | 1.19 | 3.02 | 2.72 | 0.27 | 0.31 |
13 | 270° | 0.59 | 0.47 | 2.455 | 2.085 | 0.17 | 0.16 |
14 | 292.5° | 0.94 | 0,71 | 2.297 | 1.824 | 0,17 | 0,13 |
15 | 315° | 0,94 | 1.23 | 2.196 | 1.572 | 0.17 | 0.09 |
16 | 337.5° | 1.06 | 1.36 | 2.613 | 1.935 | 0.29 | 0.19 |
Turbine | Valid Time Samples | Hub Height Wind Speed (m/s) | Percentage of Time at | Simple Mean | Mean of Monthly Means | |||||
---|---|---|---|---|---|---|---|---|---|---|
Zero Power | Rated Power | Net Power (kW) | Net AEP | NCF | Net Power (kW) | Net AEP | NCF | |||
(kWh/yr) | (%) | (kWh/yr) | (%) | |||||||
Vestas V126-3.3 MW IEC IIIA (90 m) | 3191 | 4.94 | 8.26 | 0 | 466.2 | 4,083,967 | 14.13 | 466.2 | 4,083,960 | 14.13 |
Gamesa G80-2.0 MW (80 m) | 3191 | 4.82 | 13.33 | 0 | 175.1 | 1,533,961 | 8.76 | 175.1 | 1,533,962 | 8.76 |
GE 2.75-100 (80 m) | 3191 | 4.82 | 13.99 | 0 | 212 | 1,856,809 | 7.71 | 212 | 1,856,807 | 7.71 |
Suzlon S66-1.25 MW (80 m) | 3191 | 4.82 | 13.89 | 0 | 104.5 | 915,088 | 8.36 | 104.5 | 915,084 | 8.36 |
Vestas V100-1.8 MW 60 Hz (80 m) | 3191 | 4.82 | 8.83 | 0 | 292.3 | 2,560,848 | 16.11 | 292.3 | 2,560,851 | 16.11 |
Author Contributions
Conceptualization and methodology: Y.M., L.H.-C. and J.G.B.; software, validation and formal analysis: E.T.M., F.S. and A.L.E.; investigation: Y.M. and L.H.-C.; resources: J.G.B. and Y.M.; data curation: E.T.M. and Y.M.; writing-original draft preparation: Y.M.; writing-review and editing: L.H.-C.; supervision: O.D.-P. and L.H.-C.; project administration: Y.M.
Funding
This research was funded by the University of Guayaquil (Universidad de Guayaquil-UG), by Compañia Eólica de Tierras Altas (CETASA), the University of Valladolid (Universidad de Valladolid-UVA) and the Research Center for Energy Resources and Consumption Research (Centro de Investigación de Recursos y Consumos Energéticos-CIRCE).
Acknowledgments
The authors express their gratitude to Martha Heras and Miguel Ángel Hernández, CETASA, for their support in providing us with the equipment used in the tower. We also thank the anonymous reviewers who contributed to publishing the study.
Conflicts of Interest
The authors declare no conflict of interest.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
© 2019. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Abstract
Puná Island, located in the Pacific Ocean off the southern coast of Ecuador, has a population of approximately 3344 inhabitants. However, not all inhabitants have access to electricity, which is largely supplied by diesel generators. Therefore, to identify a renewable, sustainable, environmentally friendly and low-cost alternative, a 40-m-high anemometer tower was installed for wind resource assessment and to determine the possibility of generating electricity from wind energy. Based on mathematical models for electricity generation from wind energy, data were analyzed using the software Windographer and WAsP, to determine a long-term wind speed of 4.8 m/s and a mean wind power density of 272 W/m2. By simulating the use of a 3.3-MW wind turbine, we demonstrated that as much as 800 kWh could be generated during the hours when the wind reaches its highest speed. In addition to demonstrating the technical feasibility of meeting the electricity demands of Puná Island through wind power, this study exemplifies a method that can be used for wind resource assessment in any location.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer