Content area

Abstract

- Main Access Tunnel Central Portion: 384 metres sampled width (220 metres estimated true width) with average values of 0.17 g Au/t, 69.1 g Ag/t, 765 ppm Cu, 5,623 ppm Pb, and 9,420 ppm Zn.

- Tunnel E: 147 metres sampled width (58.8 metres estimated true width) with average values of 0.07 g Au/t, 53.3 g Ag/t, 453 ppm Cu, 8,513 ppm Pb and 11,533 ppm Zn.

- Tunnel F: 147 metres sampled width (58.8 metres estimated true width) with average values of 0.28 g Au/t, 56.1 g Ag/t, 447 ppm Cu, 2,951 ppm Pb and 5,287 ppm Zn. Including 1.91 g Au/t, 378 g Ag/t, 1,105 ppm Cu, 2,279 ppm Pb and 1,664 ppm Zn.

Details

Title
Duran Ventures and MacMillan Gold Report 0.17 g Au/t, 69.1 g Ag/t, 0.6% Pb and 0.9% Zn Across 384 Metres at Pasacancha in Peru
Author
Anonymous
Publication year
2008
Publication date
Apr 24, 2008
Publisher
Intrado Digital Media Canada Inc.
Source type
Trade Journal
Language of publication
English
ProQuest document ID
447829528
Copyright
Copyright CCNMatthews Apr 24, 2008