Content area
Full Text
A proposal by ElectraNet to increase the capability of the South Australian-Victorian Heywood electricity interconnector will deliver benefits to the Australian National Electricity Market.The proposal to install a third transformer at Heywood in Victoria, series compensation on 275-kV transmission lines in South Australia, and 132-kV network reconfiguration works in South Australia has been confirmed as the preferred option to increase transfer capability.
The preferred option will enable increased wind energy exports from South Australia and also...