Content area
Full Text
When parapets on the A25 bridge crossing the M23 where the M23 is in a 25m deep cutting were replaced, a quickly installed scaffolding system prevented debris from falling and, at the same time, afforded protection to the workforce installing the parapet on the high level overbridge.