Content area
Full Text
Prior information notice: University of bonn, renovation of the lennehaus, roof and facade, civil engineering work
Civil engineering work pick up natural stone slabs of the garden terrace and store 70 m2use the substructure of the garden terrace and dispose of 80 m2 floor deliver and install 45 m2 flush shaft deliver and install 5 pieces of gravel 8/16 deliver and install 27 m3 substructure for natural stone slabs deliver and install the garden terrace 80 m2...